Loading...
HomeMy WebLinkAboutAECOM - Sink Creek Channel Suppl Amnt No. 2-10/23/2017AECOM AECOM 319-232-6531 tel 501 Sycamore Street 319-232-0271 fax Suite 222 Waterloo, Iowa 50703 www.aecom.com CITY OF WATERLOO SINK CREEK CHANNEL CLEAN OUT AND SHAPING SUPPLEMENTAL AGREEMENT NO. 2 WHEREAS, a Professional Services Agreement was entered into between City of Waterloo, Iowa, (Client), and AECOM Technical Services, Inc. (ATS), of Waterloo, Iowa, dated May 18, 2015, for maintenance operations along approximately 1,900 feet of the main channel of Sink Creek from Cedar Terrace Drive to Juniper Drive extended in Waterloo, Iowa; and WHEREAS, the Client and ATS entered into Supplemental Agreement No. 1 dated January 19, 2016, to develop a channel typical section and plans for cleaning out and shaping approximately 1,900 feet of the main channel of Sink Creek from Cedar Terrace Drive to Juniper Drive extended in Waterloo, Iowa; and WHEREAS, the Client and ATS now desire to enter into Supplemental Agreement No. 2 for construction -related services for the channel shaping project. NOW THEREFORE, it is mutually agreed to amend the original Professional Services Agreement as follows: Project Description The project consists of cleaning out and shaping approximately 1,800 linear feet of the main channel of Sink Creek, as well as 138 linear feet of storm sewer construction. After grading is complete, the contractor will apply seeding and erosion matting to the disturbed area as described in the construction plans. II. Scope of Services The Scope of Services will encompass and include services, materials, equipment, personnel and supplies necessary to provide construction staking, field review, materials testing and contract administration during the construction phase for the project defined above. The Scope of Services is further defined as follows: Task 1. Conduct a preconstruction conference attended by representatives of the Contractor, Client, Consultant and affected utilities. Task 2. Provide construction staking for horizontal and vertical controls for the project as follows: a. Set Project Control b. Set Stakes for Channel Grading c. Set Stakes for Storm Sewer d. Set Stakes for Construction Limits Task 3. Review shop drawings and other submittals as required of the Contractor by the contract documents for conformance with the design concept of the project and compliance with the information given in the contract documents. Task 4. Answer design interpretation questions from the Client, Contractor, review staff and appropriate agencies. AECOM Page 2 Task 5. Prepare bi-weekly applications for payment based on information provided by field review staff and Contractor and forward to the Client for execution with recommendation for approval and payment. Task 6. Perform construction site visits by design personnel at appropriate stages of construction to review the quality of the work and to determine whether the work conforms to the contract documents. Task 7. Prepare and assist the Client and Contractor in processing contract change orders. Task 8. Provide periodic field observation during construction to review the work of the Contractor to determine if the work is proceeding in general accordance with the contract documents and that completed work appears to conform to the contract documents. Staffing requirements may be adjusted during the project in relation to the level of construction activity. Task 9. Provide weekly SWPPP reviews along with City of Waterloo and contractor personnel, as required by Iowa DNR and City of Waterloo. Task 10. Report to the Client any work believed to be unsatisfactory, faulty or defective or does not conform to the contract documents, and advise the Client of any work that should be corrected or rejected. Task 11. Consider and evaluate Contractor's suggestions for modifications and report them with recommendations to the Client. Task 12. Participate in a review of the project with the Client and review staff near project completion and prepare a list of items to be completed or corrected. Task 13. Participate in a field observation of the completed project with the Client and review staff before a final application for payment is processed for the Contractor. Task 14. Maintain files for correspondence, reports of the job conferences, shop drawings and sample submissions, reproductions of original contract documents including addenda, change orders, field modifications, additional drawings issued subsequent to the execution of the contract, Engineer clarifications and interpretations of the contract documents, progress reports and other project -related documents. Task 15. Provide the Client with a copy of revised drawings of the construction plans (record drawings) for the project based on the construction observation records of the field review staff and the Contractor showing those changes made during construction considered significant. Task 16. Prepare and assist the Client with the final close-out documentation received from the Contractor. III. Compensation Compensation for the above services will be on an hourly basis in accordance with Part VI of the original agreement and shall be segregated from the fees in the original agreement and Supplemental Agreement No. 1. The estimated fee is Sixteen Thousand Dollars ($16,000.00). IV. In all other respects, the obligations of the Client and the Consultant shall remain as specified in the Professional Services Agreement dated May 18, 2015. AECOM Page 3 IN WITNESS WHEREOF, the parties hereto have executed this Supplemental Agreement No. 2 as of the dates shown below: AECOM TECHNICAL SERVICES, INC. By Douglas . indel, P.E. Associate Vice President APPROVED FOR CITY OF WATERLOO Date October 20, 2017 By: Date Quent Hart A r.rz E� Mayor O:Wdministration1AGREE\SUPPLEISA2 Wat Sink Creek CRS.doc