Loading...
HomeMy WebLinkAboutASPRO CO#3 FY17 Street Reconst #921-11/13/2017CITY OF WATERLOO, IOWA CHANGE or EXTRA WORK ORDER NO. 3 PROJECT: F.Y. 2017 STREET RECONSTRUCTION PROGRAM, CONTRACT NO. 921 Date Prepared: September 20, 2017 AMOUNT: $ 57,446.80 TO: ASPRO, INC. INCREASE Contractor You are hereby ordered to make the following changes from the plans and specifications or perform the following extra work on your contract dated April 17, 2017 A. Description of change to be made or extra work to be done: 3001 3002 3003 3004 . • 3005 . 3006 3007 3008 Pavement Removal Class 10 Excavation Modified Subbase around 3" HMA Pavement Marking Removal Pavement Markings Handicap pavement symbols Traffic Control B. Reason for ordering change or extra work: 3001-3008 Place new parking lot after the demolition of the building at 216-222 Commercial Street and the removal and replacement of the pavement markings in the parking lot next to Commercial Street/1st Street and the parking lot next to Jefferson/1st Street. C. Settlement for cost of work to be made as follows: 3001 Pavement Removal 3002 Class 10 Excavation 3003 Modified Subbase 3004 3" HMA 3005 Pavement Marking Removal 3006 Pavement Markings 3007 Handicap Pavement Symbols 3008 Traffic Control Change Order No. 3 TOTAL INCREASE 125.00 S.Y. @$57.00/S.Y. = $7,125.00 275.7 C.Y. @$11.00/C.Y. = $3,032.70 380.00 Tons @$22.80/Ton = $8,664.00 992.30 S.Y. @$17.90/S.Y. = $17,762.17 43.02 Sta. @$313.50/Sta. = $13,486.77 53.82 Sta. @$88.00/C.Y. = $4,736.16 4 Each @$247.50/Each = $990.00 1.00 Lump Sum @$1,650.00 = $1,650.00 $57,446.80 Contract No. 921 Page 1 of 2