Loading...
HomeMy WebLinkAboutASPRO CO#4 FY17 Street Reconst #921-11/13/2017CITY OF WATERLOO, IOWA CHANGE or EXTRA WORK ORDER NO. 4 PROJECT: F.Y. 2017 STREET RECONSTRUCTION PROGRAM, CONTRACT NO. 921 Date Prepared: November 2, 2017 AMOUNT: $ 34,291.32 INCREASE TO: ASPRO, INC. , Contractor You are hereby ordered to make the following changes from the plans and specifications or perform the following extra work on your contract dated April 17, 2017 A. Description of change to be made or extra work to be done: 4001 Sidewalk Removal 4002 Sidewalk, 6" PCC 4003 Pedestrian Ramp, Detectable Warning Surface 4004 Saw Cut 4005 Pavement Scarification 4006 Mobilization — Milling Machine 4007 HMA Standard Traffic (ST) Surface, 1/4" Mix, PG 58-28S, 75% CR., No Friction Required B. Reason for ordering change or extra work: 4001-4006 Work to complete the replacement of CN Railroad crossing improvements on E. 4th Street between Sumner Street and Dane Street, and on Nevada Street between Monroe Street and Polk Street. IDOT Railroad Crossing Improvement Program - City Portion of this change order is 20% C. Settlement for cost of work to be made as follows: 4001 Sidewalk Removal 4002 Sidewalk, 6" PCC 4003 Pedestrian Ramp, Detectable Warning Surface 4004 Saw Cut 4005 Pavement Scarification 4006 Mobilization — Milling Machine 4007 28.3 S.Y. @ $11.00/S.Y.= $ 311.30 28.3 S.Y. @ $45.75/S.Y.= $1,294.73 40 S.F. @ $38.85/S.F. = $1,554.00 45.0 L.F. @ $5.10 = $ 229.50 444.4 S.Y. @$6.65/S.Y. = $2,955.26 1 L.S. @ $1,250.00 = $1,250.00 HMA Standard Traffic (ST) Surface, '/2" Mix, PG 58-28S, 75% CR., No Friction Required 244.25 /Ton @$109.30/ Ton. = $26,696.53 Change Order No. 4 TOTAL INCREASE _ $34,291.32 Contract No. 921 Page 1 of 2 BY: CITY OF WATERLOO 1\ A3�11 Aspro, Inc. Date CONTRACTOR BY: PRINTED NA E. ' Date TITLE: Date APPROVED: City Engineer Change Order No. 4 Contract No. 921 ///x(117 Date Page 2 of 2