HomeMy WebLinkAboutContract 880-11/6/2017 STATE OF IOWA, } I do solemnly swear that the annexed copy of legal
City of Waterloo
Contract 880
Black Hawk County, SS Notice was published in the Waterloo-Cedar Falls
Courier, a daily newspaper printed in Waterloo, Black
Hawk County, Iowa, once commencing on the 10th
day of November, 2017 in the name of said
newspaper, and that the annexed rate of advertised is
NOTICE OF PUBLIC HEARING
On Proposed Plans,Specifications,Form the regular legal rate of said newspaper, and that the
of Contract, g
And Estimate of Cost following is a correct bill for publishingsaid notice.
Forthe
FLOW EQUALIZATION FACILITY
OVERFLOW CONNECTION
TO SATELLITE WPCF Printer's Bill $34.56
In the City of Waterloo,Iowa
CONTRACT NO.880
RECEIVING OF BIDS
Sealed proposals will be received by the
City Clerk of the City of Waterloo,Iowa,at
her office in the City Hall of the said City
on the 16th day of November;2017,until
1:00 p.m. for the construction of the
FLOW EQUALIZATION FACILITY OVER-
FLOW CONNECTION TO SATELLITE
WPCF, City Contract No. 880, as
described in detail in the plans and
specifications now on file in the Office of
the City Clerk.
OPENING OF BIDS
I All proposals received will be opened in
the First Floor Conference Room at City
Hall,in the City of Waterloo,Iowa,on the
00
p.16th day of November, will at acted
upon and the proposals will be acted �'�.�W
upon at such later time and place as may
then be fixed by the City Council.
PUBLIC HEARING
Notice is hereby given that the Council of Signed
said City will conduct a public hearing on
the proposed plans, specifications, form
of contract,and estimate of cost for the
oottStruction of the above-described im-
provement project at 5:30 p.m. on the
POth-day of November,2017,said hearing
Chambheld in ers in he Herod,aE,G�City.n l Subscribed and sworn to before me this
proposed plans, specifications, form of
contract, and estimate of cost for said 1
improvements heretofore prepared by 1�/
AECOM for the City of Waterloo are now Day o A.D., 20
on file in the office of the City Clerk for
public examination, and any person
interested therein may file written objec-
tiomthereto with the City Clerk before the
date set for said hearing,or apppear and
make objection thereto wdh the City Clerk
before the date set for said hearing, or
appear and make objection thereto at the Notary Public
meeting above set forth.
SCOPE OF WORK
This project consists of the installation of
a new 24-inch gravity main that would Received of
connect Flow Eqqualization Basin No 2
with the$a gl Aer9tion Basin.A control
valve and r will be installed on
this line. The project also includes a
12-inch force main that would connect the
Satellite Aeration Basin with the Easton
Aeration Basins and the upstream anoxic
basin.
Published pursuant to the provisions of the sum Of
Chapter 26 of the City Code of Iowa and
upon order to the City Council of said
Waterloo, Iowa, on the 6th day of
November,2017.
CITY OF WATERLOO;IOWA Dollars.
Kelley Felchle
City,Clerk
In full for publication of the above notice.
z4*wrwr°a JODI E MCKINS 'Ry
* COMMI ION .782413
Topp
MY
1Jr.