Loading...
HomeMy WebLinkAboutContract 880-11/6/2017 STATE OF IOWA, } I do solemnly swear that the annexed copy of legal City of Waterloo Contract 880 Black Hawk County, SS Notice was published in the Waterloo-Cedar Falls Courier, a daily newspaper printed in Waterloo, Black Hawk County, Iowa, once commencing on the 10th day of November, 2017 in the name of said newspaper, and that the annexed rate of advertised is NOTICE OF PUBLIC HEARING On Proposed Plans,Specifications,Form the regular legal rate of said newspaper, and that the of Contract, g And Estimate of Cost following is a correct bill for publishingsaid notice. Forthe FLOW EQUALIZATION FACILITY OVERFLOW CONNECTION TO SATELLITE WPCF Printer's Bill $34.56 In the City of Waterloo,Iowa CONTRACT NO.880 RECEIVING OF BIDS Sealed proposals will be received by the City Clerk of the City of Waterloo,Iowa,at her office in the City Hall of the said City on the 16th day of November;2017,until 1:00 p.m. for the construction of the FLOW EQUALIZATION FACILITY OVER- FLOW CONNECTION TO SATELLITE WPCF, City Contract No. 880, as described in detail in the plans and specifications now on file in the Office of the City Clerk. OPENING OF BIDS I All proposals received will be opened in the First Floor Conference Room at City Hall,in the City of Waterloo,Iowa,on the 00 p.16th day of November, will at acted upon and the proposals will be acted �'�.�W upon at such later time and place as may then be fixed by the City Council. PUBLIC HEARING Notice is hereby given that the Council of Signed said City will conduct a public hearing on the proposed plans, specifications, form of contract,and estimate of cost for the oottStruction of the above-described im- provement project at 5:30 p.m. on the POth-day of November,2017,said hearing Chambheld in ers in he Herod,aE,G�City.n l Subscribed and sworn to before me this proposed plans, specifications, form of contract, and estimate of cost for said 1 improvements heretofore prepared by 1�/ AECOM for the City of Waterloo are now Day o A.D., 20 on file in the office of the City Clerk for public examination, and any person interested therein may file written objec- tiomthereto with the City Clerk before the date set for said hearing,or apppear and make objection thereto wdh the City Clerk before the date set for said hearing, or appear and make objection thereto at the Notary Public meeting above set forth. SCOPE OF WORK This project consists of the installation of a new 24-inch gravity main that would Received of connect Flow Eqqualization Basin No 2 with the$a gl Aer9tion Basin.A control valve and r will be installed on this line. The project also includes a 12-inch force main that would connect the Satellite Aeration Basin with the Easton Aeration Basins and the upstream anoxic basin. Published pursuant to the provisions of the sum Of Chapter 26 of the City Code of Iowa and upon order to the City Council of said Waterloo, Iowa, on the 6th day of November,2017. CITY OF WATERLOO;IOWA Dollars. Kelley Felchle City,Clerk In full for publication of the above notice. z4*wrwr°a JODI E MCKINS 'Ry * COMMI ION .782413 Topp MY 1Jr.