Loading...
HomeMy WebLinkAboutGingerich StructuresGINGERICH STRUCTURES GINGERICH STRUCTURES 4807 University Aye #205 Cedar Falls, IA 50613 ()A,4sL ,'5 cis y 19- PO<«e vtA GIV E- vidence. Pc cilProjecif 4807 University Ave #205 Cedar Falls, IA 50613 FY /7. Police. UeJkfe/ EvAe ce, �Gi(i pryiwi CITY CLERK: '2023 'fi=r REMITTER Gingerich Structures PAY TO THE ORDER OF UNITED BANK 042598 of IOWA IDA GROVE, IOWA 51445 1712) 364-3393 City of Waterloo OR Gingerich Structures DATE 12/14/2017 72-2143/739 104116 1 $ 20,000.00 I11:11!' ,ttlll11 1 , 111 (I�tIl tllll� i' I• DOLLARS 8.5.:41= THIS DOCUMENT HAS A MICRO -PRINT SIGNATURE LINE, WATERMARK AND A Tf-IERMOCHROMIC ICON: ABSENCE OF THESE FEATURES WILL INDICATE A COPY CASHIER'S CHECK »'042598»' 1:07392L4331: l0 4LL »■ 4r GERICH STRUCTUj E:s Simon Gingerich Cell: 319-464-7781 simon@gingerichstructures.com Specializing in Quality Post Frame Buildings Proposal Document Date December/13/2017 Name: Waterloo Police Project Address: 1941 Newell St City: Waterloo State:IA ZIP 50703 Phone: 319-291-4340 EXT:3212 Thank you so much for your interest in our company and allowing us to offer a proposal for your new building. Your proposal has been prepared based on the information and specifications: Size: Roof framing: Truss Loads: Wall Framing: Footings: Siding: Building Overhangs: Insulation: Wainscoting Overhead Doors: Walk Doors: Interior Concrete: Exterior Concrete: Interior Liner: Included: 6" x :%i" rock base for building and driveway. All dirt/excavating work according to blueprints. Building drain options: 40' of poly drain by ABT Drains, with 500 series iron grate frame and iron grate. $4,750.00 12"x12" box drain. $812.50 Cut in the curb for the driveway. Remove and dispose of 1 tree. 100014178' high heavy commercial chain link fence including a 24' cantilever slide gate. Allowance for landscaping, Hydro -seeding and fine grading estimated 1 acre. $9,801.00 Silt fence installation +/-1400 linear feet. Dumpster allowance $1,200.00 All electrical work as discussed in the plans. Option: Install 200 amp overhead service to building rather than underground. ---$3,000.00 Engineer Stamped Drawings for building. $2,200.00 All Plumbing, Heating and Water according to plans. 70' Width 112' Length 18' inside clearance height. 4' O.C. Trusses with 4/12 Roof Slope. 30# TCLL, 5# TCDL, 10# BCDL Standard. 4 Ply 2x6 Laminated Columns 8' O.C. Sides, 10 0.C. Gables. 48" In Ground Post On 24"x 8"Concrete Pad W/ Uplift Protection. 26 Ga. Steel Fastened 2' O.C. on 2x4's. 24" Sidewalls 12" Gables. R-25 BattSidewalls, R-50Ceiling, 6052 SgFt_Housewrap. 4' x 216 SqFt Tri -Lite Stone across front of building. 2-16x16 R Value 26.54 with openers installed. #1 - 3'x 6'8" Solid Entry Door. 6" with 2' OC rebar 4000 PSI mix, 7840 SqFt. 6" with 2' OC rebar 4000 PSI mix, 6000 SqFt. $29,500.00 Walls: 6052 Ceiling: 7840 SqFt. All delivery fees, taxes, materials and labor included. $352,845.00 Sincerely, Simon Gingerich. C44.1-(2441/1"-- Mayor BUCK CLARK COUNCIL MEMBERS DAVID JONES Ward 1 CAROLYN COLE Ward 2 HAROLD GETTY Ward 3 QUENTIN M. HART Ward 4 RON WELPER Ward 5 BOB GREENWOOD At -Large STEVE SCHMITT ,4! -Large CITY OF WATIE41.00, IOWA CITY CLERK AND FINANCE DEPARTMENT 715 Mulberry St. • Waterloo, IA 50703 • (319) 291-4323 Fax (319) 291-4571 SUZY SCHARES • City Clerk MICHELLE WEIDNER, CPA • Chief Financial Officer December 20, 2017 Gingerich Structures 4807 University Ave. #205 Cedar Falls, IA 50613 Dear Mr. Gingerich: Upon review of the bids received in conjunction with the FY 18 Police Vehicle/Evidence Facility Project it was determined the bids are above the estimated project funds, therefore, it has been determined all bids will be rejected at the January 2, 2018 City Council meeting. As such, I am returning your cashier's in the amount of $20,000, submitted with your bid as bond security. The department will be revising the plans and specifications for this project and anticipate re -letting the project in January. We hope you will consider bidding on this project at that time. Thank you for your time and consideration of this project. Sincerely, LeAnn M. Even, CMC, IaCMC Deputy City Clerk lme/FK Enclosures WE'RE WORKING FOR YOU! An Equal Opportunity/Affirmative Action Employer