Loading...
HomeMy WebLinkAboutPeterson Contractors - CO #1 - FY18 Boathouse Enhancements-12/11/2017CITY OF WATERLOO, IOWA CHANGE or EXTRA WORK ORDER NO. 1 PROJECT: F.Y. 2018 Waterloo Boathouse Enhancements , CONTRACT NO. 940 Date Prepared: November 22, 2017 AMOUNT: $ 9,736.10 Increase TO: PETERSON CONTRACTORS, INC., Contractor You are hereby ordered to make the following changes from the plans and specifications or perform the following extra work on your contract dated October 4, 2017. A. Description of change to be made or extra work to be done: 1. Change circuit / feeder conductors from aluminum to copper. 2. Provide and install conduit / wire feeder from utility transformer to new trail lighting panel and reduce ampacity of new panel from 200 amps to 100 amps. B. Reason for ordering change or extra work: 1. Comply with City of Waterloo standards. 2. The drawings indicate this work to be done by MidAmerican Energy. MidAmerican Energy has declined to perform this work. This work is necessary for the project and will be done by the electrical sub -contractor. Ampacity was lowered to reduce cost of the work and still meet the needs of the project. C. Settlement for cost of work to be made as follows: 1. Add $2,313.50 2. Add $7,422.80 CITY OF WATERLOO BY: Quentin Hart, Mayor Date ATTEST: BY: Total Net Increase $ 9,736.10 PETERSON CONTRACTORS, INC. CONTRACTOR Date l24 ( % Il ZIG/A 17 WAYNE 1 AASSEN ENGINEERING & SURVEYING, INC. PRINTED NAME: UINS TITLE: Date 1'2-/t, 1 v1 WATERLOO LEISURE SERVICES Travis Nichols Date