CHANGE or EXTRA WORK ORDER NO. 2
PROJECT: F.Y. 2018 Waterloo Boathouse Enhancements , CONTRACT NO. 940
Date Prepared: November 22, 2017 AMOUNT: $ 15,378.44 Increase
TO: PETERSON CONTRACTORS, INC., Contractor
You are hereby ordered to make the following changes from the plans and specifications or perform
the following extra work on your contract dated October 4, 2017.
A. Description of change to be made or extra work to be done:
Excavate rubble under proposed boat landing, place an 8" thick crushed stone base of 1"
washed concrete stone, concrete footing and reinforced back wall as shown on the attached.
B. Reason for ordering change or extra work:
An extensive amount of rubble was discovered under the proposed boat landing during its
construction that must be removed to provide a stable structure.
C. Settlement for cost of work to be made as follows:
Add a lump sum of *745850.0(X $15,378.44
Total Net Increase
CITY OF WATERLOO
BY:
$ 15,378.44
PETERSON CONTRACTORS, INC. CONTRACTOR
Qx5L4 -WO BY:
CaTgl--.—
Quentin
Hart, Mayor Date
Date vzjtt fid
ATTEST:
Kelley, FcI, hcr, City Clerk
PRINTED NAME: No.; .-ts(‘nQ-C'
TITLE: '1
Date
2 c(Act WATERLOO LEISURE SERVICES
WAYNE CLAASSEN ENGINEERING &
SURVEYING, INC.
By:
/z/fir/2,r.
William J ilaassen, PE Date
Travis Nichols Date
Facilities/Program Manager