Loading...
HomeMy WebLinkAboutPetersen Contractors - CO #2 - FY18 Boathouse Enhancements-12/11/2017CITY OF WATERLOO, IOWA CHANGE or EXTRA WORK ORDER NO. 2 PROJECT: F.Y. 2018 Waterloo Boathouse Enhancements , CONTRACT NO. 940 Date Prepared: November 22, 2017 AMOUNT: $ 15,378.44 Increase TO: PETERSON CONTRACTORS, INC., Contractor You are hereby ordered to make the following changes from the plans and specifications or perform the following extra work on your contract dated October 4, 2017. A. Description of change to be made or extra work to be done: Excavate rubble under proposed boat landing, place an 8" thick crushed stone base of 1" washed concrete stone, concrete footing and reinforced back wall as shown on the attached. B. Reason for ordering change or extra work: An extensive amount of rubble was discovered under the proposed boat landing during its construction that must be removed to provide a stable structure. C. Settlement for cost of work to be made as follows: Add a lump sum of *745850.0(X $15,378.44 Total Net Increase CITY OF WATERLOO BY: $ 15,378.44 PETERSON CONTRACTORS, INC. CONTRACTOR Qx5L4 -WO BY: CaTgl--.— Quentin Hart, Mayor Date Date vzjtt fid ATTEST: Kelley, FcI, hcr, City Clerk PRINTED NAME: No.; .-ts(‘nQ-C' TITLE: '1 Date 2 c(Act WATERLOO LEISURE SERVICES WAYNE CLAASSEN ENGINEERING & SURVEYING, INC. By: /z/fir/2,r. William J ilaassen, PE Date Travis Nichols Date Facilities/Program Manager