CHANGE or EXTRA WORK ORDER NO. 3
PROJECT: F.Y. 2018 Waterloo Boathouse Enhancements , CONTRACT NO. 940
Date Prepared: November 22, 2017
AMOUNT: $ 3,000.00 Increase
TO: PETERSON CONTRACTORS, INC., Contractor
You are hereby ordered to make the following changes from the plans and specifications or perform
the following extra work on your contract dated October 4, 2017.
A. Description of change to be made or extra work to be done:
Provide and place concrete grout on rip rap at boat ramp and as directed by the Engineer.
B. Reason for ordering change or extra work:
Item is needed to secure rip rap from displacement during flooding.
C. Settlement for cost of work to be made as follows:
1. $250.00/CY x 12 CY= $3,000.00.
CITY OF WATERLOO
B Y : Z_lt_An1Q v ,
Quentin Hart, Mayor
Date 12111./1"/
ATTEST:
Total Net Increase $ 3,000.00
PETERSON CONTRACTORS, INC. CONTRACTOR
W)4iLA-
7
PRINTED NAME: 0,tOrt'S ti
BY:
Date
TITLE: CA -L-1 6_144/L
Kelley,+e1c-19t- , City Clerk
v2 -(Ch 1 -
WAYNE CLAASSEN ENGINEERING &
SURVEYING, 446--r-
William
INC.B :�Y J. CI.assen, PE
Date 1 —L11 /1-7
WATERLOO LEISURE SERVICES
/Z4/Ze/ 7
Date
(File: My Documents/Change Order/MASTER)
Travis Nichols
Facilities/Program Manager
Date