Loading...
HomeMy WebLinkAboutLodge Construction - FY18 Ash Street Drainage Improvements-11/27/2017CITY OF WATERLOO, IOWA FINAL QUANTITY ADJUSTMENT PROJECT: F.Y. 2018 ASH STREET DRAINAGE IMPROVEMENTS CONTRACT NO. 936 Date Prepared: November8,2017 AMOUNT: $4,198.40 INCREASE TO: LODGE CONSTRUCTION, INC. , Contractor You are hereby ordered to make the following changes from the plans and specifications or perform the following extra work on your contract dated July 24, 2017. A. Description of change to be made or extra work to be done: Adjust original construction quantities to actual construction quantities. 13. Reason for ordering change or extra work: As -built quantities varied for some bid items C. Settlement for cost of work to be made as follows: Compensation already made to contractor through bid items. See attached summary. BY: at.04/04.3 Mayor Date Final Quantity Adjustment Date TOTAL INCREASE $4,198.40 LODGE CONSTRUCTION, INC. CONTRACTOR BY: //-9-/7 Date TITLE: 0 crner� APPROVED: dtiitJO City Engineer Date Cont. #936 Sheet 1 of 2 F.Y. 2018 ASH STREET DRAINAGE IMPROVEMENTS CONTRACT NO. 936 FINAL PERIOD: Due 30 Days from date of acceptance of work Bid Item Bid Item Description Units Original Bid Quantity Final Quantity Quantity Difference Lodge Unit Price Lodge Unit Price Extended Increase / Decrease 1 Remove Misc. Sealcoat Pavement SY 76.1 80.9 4.8 $ 9.00 $ 728.10 $ 43.20 2 2" HMA SY 85.9 93.2 7.3 $ 25.00 $ 2,330.00 $ 182.50 3 Modified Subbase TON 27.1 27.8 0.7 $ 40.00 $ 1,112.00 $ 28.00 4 Remove PCC Sidewalk SF 91.5 156.5 65.0 $ 9.00 $ 1,408.50 $ 585.00 5 PCC Sidewalk, 6" SF 91.5 96.5 5.0 $ 7.00 $ 675.50 $ 35.00 6 Detectable Warning Surface SF 10.0 10.0 0.0 $ 75.00 $ 750.00 $ - 7 Topsoil, 4" SY 502.1 758.0 255.9 $ 5.00 $ 3,790.00 $ 1,279.50 8 Hydroseed ACRES 0.1 0.19 0.09 $ 20,000.00 $ 3,800.00 $ 1,800.00 9 Storm Sewer, 2000D, 15" LF 446.2 438.0 -8.2 $ 39.00 $ 17,082.00 $ (319.80) 10 Storm Sewer Manhole, SW -401, 48" EACH 1.0 1.0 0.0 $ 3,000.00 $ 3,000.00 $ - 11 Type SW -513 Inlet, 48" x 48" EACH 1.0 1.0 0.0 $ 4,000.00 $ 4,000.00 $ - 12 Tap and Collar Structure EACH 1.0 1.0 0.0 $ 1,750.00 $ 1,750.00 $ - 13 Traffic Control LS 1.0 1.0 0.0 $ 600.00 $ 600.00 $ - 14 Furnish and Install Wattles, 9" dia. LF 480.0 593.0 113.0 $ 3.50 $ 2,075.50 $ 395.50 15 Remove and Dispose Wattles, 9" dia. LF 480.0 593.0 113.0 $ 1.50 $ 889.50 $ 169.50 TOTAL $ 43,991.10 $ 4,198.40 NO CHANGE ORDERS FOR THIS PROJECT CHANGE ORDER TOTAL ORIGINAL CONTRACT AMOUNT TOTAL PAY ESTIMATE #1 $ 40,946.52 PAY ESTIMATE #2 $ 845.03 RETAINAGE $ 2,199.55 TOTAL PAYMENTS $ 43,991.10 NO CHANGE ORDERS FOR THIS PROJECT CHANGE ORDER TOTAL ORIGINAL CONTRACT AMOUNT $ 39,792.70 FINAL QUANTITY SUMMARY (+84,198.40) $ 4,198.40 FINAL CONTRACT AMOUNT $ 43,991.10 FINAL QTY. ADJ. Cont. #936 Sheet 2 Of 2