HomeMy WebLinkAboutAECOM - Airport Tree Clearing-11/6/2017AECOM AECOM 319-232-6531 tel 501 Sycamore Street 319-232-0271 fax Suite 222 Waterloo, Iowa 50703 www.aecom.com WATERLOO REGIONAL AIRPORT TREE CLEARING CATEGORICAL EXCLUSION (CATEX) AMENDMENT FAA AIP 3-19-0094-046 (Potential) WATERLOO REGIONAL AIRPORT WATERLOO, IOWA Project Description - See Attachment Scope of Services - See Attachment Compensation Compensation for services for this project shall be on a cost plus fixed fee basis not -to -exceed Thirty -One Thousand Seven Hundred Dollars ($31,700.00) without authorization of the Client. See attached Exhibit B, Consultant Cost Summary. General Conditions Except as specifically amended by this Individual Project Agreement, Services shall be provided in accordance with the Consultant Services Agreement for the Waterloo Regional Airport, entered between AECOM Technical Services, Inc. ("ATS") and the City of Waterloo ("Client") dated April 15, 2014. APPROVED: APPROVED: CITY OF WATERLOO, IOWA AECOM TECHNICAL SERVICES, INC. By By� Quentin Hart, Mayor Douglas W. Schindel, P.E. Associate Vice President Date Iv/6 Date October 27, 2017 SCOPE OF SERVICES WATERLOO REGIONAL AIRPORT TREE CLEARING CATEGORICAL EXCLUSION (CATEX) AMENDMENT FAA AIP 3-19-0094-046 (Potential) WATERLOO REGIONAL AIRPORT WATERLOO, IOWA Project Description The project is described as additional work elements related to the preparation of documentation for a CATEX for tree removal in the approach surfaces to Runway 12 and Runway 18 and the transitional surface to Runway 18-36 at the Waterloo Regional Airport. The CATEX will be prepared in accordance with the requirements of the Federal Aviation Administration (FAA) ARP SOP 5.0, Standard Operation Procedure for CATEX Determinations. AECOM originally prepared the CATEX document in accordance with these documented procedures, but it was determined that additional services would be required related to cultural resources and wetlands that were not anticipated. II. Scope of Services The work to be performed by the Consultant includes the following tasks: 1. Wetland Boundary Delineation. This task includes field verifying the boundaries of wetlands within the treed areas at the Waterloo Regional Airport and includes a small amount of time to coordinate with the subconsultant performing this work (Stantec). The project wetland scientist, using methods defined in the 1987 Corps of Engineers Wetland Delineation Manual and the Midwest Regional Supplement to the Corps of Engineers Wetland Delineation Manual, will conduct one site visit to determine existing wetland boundaries within the 25 -acre study area north of West Dunkerton Road. This work will include a field assessment of surface hydrology, observations of soil redoximorphic features, and a plant community characterization. Wetland boundaries identified in the field will be mapped using a Global Positioning System (GPS). The GPS data will be transferred to aerial photography. The presence of any other Waters of the U.S. (i.e., streams) located within the survey areas will also be determined. A report of the wetland and waterway findings will be prepared and will be suitable for submittal to the USACE. The report will include data and documentation required by the USACE, including aerial photographs showing wetland boundaries, data sheets for sampling locations and a description of methods used. Final delineation of wetland boundaries will be indicated on aerial photography. This task also includes drafting and clerical staff efforts in preparing the report. 2. Wetland Coordination. This task includes ongoing communication and coordination with the Corps of Engineers (COE) and the Iowa DNR as it relates to wetland delineation and mitigation. It also includes distributing the wetland report to agencies and the Waterloo Regional Airport. 3. Wetland Permit Application. This task includes the preparation and submittal of the Joint Section 401/404 Permit application to Iowa DNR and COE, if required by the COE. The permit application would be submitted jointly to Iowa DNR and COE. It is assumed, based on information gathered previously, that mitigation for wetland impacts will not likely be needed. However if the impacts exceed 0.10 acre, mitigation will be required. 4. Wetland Mitigation Concept. This task would only be needed if wetland impacts exceed 0.10 acre. It would include identifying a mitigation site location and designing the mitigation wetland to be suitable as replacement per COE guidelines and requirements. Plan sheets, planting list, mitigation commitments and future monitoring must be developed as part of the mitigation package. Final design of the mitigation site is not included in this Scope of Services but can be added by supplemental agreement if required. 5. Cultural Resources Survey. A field survey would be conducted prior to tree removal to determine the potential for cultural resources to be present in the treed areas. Such a survey may detect some resources, but there could be a potential for other resources to be caught up in the tree roots and only revealed as the trees are removed. Should artifacts be uncovered during tree removal, an archaeologist would need to be called in to assess the findings (can be added by supplemental agreement, if required). 6. Project Administration. This task consists of the quality review of work elements on the project. During the course of this project, quality reviews will be conducted by senior technical personnel not directly involved in the project. 0:V\dminisiration\AGREEIPROF\ALO LATEX Tree Removal.doc Documented Categorical Exclusion (CATEX) for Tree Removal Waterloo Regional Airport Waterloo, Iowa FAA AIP Project No. 3-19-0094-046 Engineering Services Consultant Cost Summary Direct Labor Cost Category Hours Rate/Hour Amount Senior Professional 16 $82.30 $1,316.80 Project Professional 8 $59.10 $472.80 Staff Professional 84 $46.70 $3,922.80 Professional 0 $35.80 $0.00 CADD Operator II 44 $33.90 $1,491.60 CADD Operator I 0 $26.80 $0.00 Senior Technician 0 $35.60 $0.00 Technician 88 $26.50 $2,332.00 Project Support 8 $31.00 $248.00 248 Exhibit B $9,784.00 II. Payroll Burden and Overhead Costs 135.09% $13,217.21 III. Direct Project Expenses Category Units Rate/Unit Amount Mileage 300 0.535 160.50 Per Diem 0 50.00 0.00 Lodging 0 90.00 0.00 B/W Copies 200 0.06 12.00 Color Copies 200 0.22 44.00 Plan Copier 0 0.50 0.00 EDM Equipment 0 12.50 0.00 GPS Equipment 0 25.00 0.00 Miscellaneous, Other 500.00 $716.50 IV. AECOM Estimated Actual Costs $23,717.71 Rounded $23,700.00 V. Subcontract Expense Stantec (Wetland Inventory) $4,500.00 VI. Estimated Actual Costs $28,200.00 VII. Fixed Fee (15% of Items I & II) Rounded $3,500.00 VIII. Maximum Amount Payable $31,700.00 Exhibit D Documented Categorical Exclusion (CATEX) for Tree Removal Waterloo Regional Airport Waterloo, Iowa FAA AIP Project No. 3-19-0094-046 Engineering Services Staff Hour Estimate Item No. Description Senior Prof Project Prof Staff Prof Prof GADD Operator 11 CADD Operator l Senior Technician Technician Project Support Totals 1 Wetland Delination 2 2 2 Wegand Coordination 2 10 12 3 Wetland Permit Application 2 18 4 24 4 Wetland Mitigation Concept6 8 46 40 100 5 Cultural Resources Survey 0 Initial Consultation 2 2 Data Collection 4 4 Field Survey 8 8 Data Processing 12 12 Reporting6 40 46 Final Consultation 6 6 Final Report2 2 16 20 6 Project Administration 4 8 12 Total Services 16 8 84 0 44 0 0 88 8 248