Loading...
HomeMy WebLinkAboutCroell, Inc. - CO#1 - Taxiway C Reconstruct-12/18/2017CHANGE ORDER NO. 1 Owner Waterloo Regional Airport City of Waterloo, Iowa Date December 05, 2017 Project Reconstruct Taxiway C —North of Runway 12/30, Reconstruct Taxiway C — South of Runway 12/30 Owner's Contract No. FAA AIP Project No. 3-19-0094-045 Contractor Croell Inc. Date of Contract Start July 17, 2017 You are directed to make the following changes in the Contract Documents. Description: Item No. Description Unit Unit Price Quantity Amount 17 6 — Inch Perforated Subdrain (SDR 35) Complete Including Porous Backfill and Filter Fabric LF $17.50 (5,321) ($93,117.50) 20 Catch Basin EA $10,000.00 (1) ($10,000.00) 101 Pavement Marking Removal SF $3.85 1,302 $5,012.70 102 6 — Inch Perforated Subdrain (SDR 35) Complete Including Porous Backfill and Filter Fabric LF $16.90 5,321 $89,924.90 103 Catch Basin, 4'x4' EA $8,750.00 1 $8,750.00 Total Change Order $ 570.10 Reason for Change Order: During construction it was determined that the subdrain north of Runway 12/30 could be raised to minimize subdrain excavation and porous backfill costs. It was determined that the catch basin could be downsized from a 4'x6' to a 4'x4' to save on costs, without negatively impacting capacity. The pavement marking removal was required for the elimination of Taxiway C-1. Reconstruct Taxiway C — North of Runway 12/30 Reconstruct Taxiway C — South of Runway 12/30 CO -1 Project No — 60550592 1 CONTRACT PRICE CONTRACT TIMES (Calendar Days) To substantial To final completion completion Original: $ 2,128,833.19 Original: 150 Previous C.O.s (DEDUCT):$ 0.00 Previous C.O.s (ADD): 0 This C.O. (ADD): $ 570.10 This C.O. (ADD): 0 Contract Price with all REVISED: 150 approved Change Orders: $ 2,129,403.29 It is agreed by the Contractor that this Change Order includes any and all costs associated with or resulting from the change(s) ordered herein, including all impact, delays, and acceleration costs. Other than the dollar amount and time allowance listed above, there shall be no further time or dollar compensation as a result of this Change Order. THIS DOCUMENT SHALL BECOME AN AMENDMENT TO THE CONTRACT AND ALL STIPULATIONS AND COVENANTS OF THE CONTRACT SHALL APPLY HERETO. RECOMMENDED: R _ Engineer (Authorized Signature) APPROVED: rTh By: t__Z.IIS51(1--- G Date 1 2-1t a (1 7 Owner (Authorized Signature) Date ACCEPTED: By: Con ractor (Authorized Signature) /.)_:/y /7 Date Reconstruct Taxiway C — North of Runway 12/30 Reconstruct Taxiway C — South of Runway 12/30 CO -1 Project No — 60550592 2