HomeMy WebLinkAboutBenton's Sand & Gravel - CO#2 - Decrease of $1,979.90-6/13/2016CITY OF WATERLOO, IOWA CHANGE or EXTRA WORK ORDER NO. 2 PROJECT: F.Y. 2015 GERALDINE ROAD - PHASE 3 Date Prepared: March 1, 2016 AMOUNT: ($ 1 979.90) CR TO: Benton's Sand and Gravel, Inc. CONTRACT NO. 871 Contractor You are hereby ordered to make the following changes from the plans and specifications or perform the following extra work on your contract dated February 9, 2015. A. Description of change to be made or extra work to be done: Item 4 — SILT FENCE — Increase Quantity by 446.0 LF Item 5 —MOBILIZATION, EROSION CONTROL — Decrease Quantity by 3.0 EA Item 12 —REMOVE EXISTING CHAIN-LINK FENCE - 10' HEIGHT — Decrease Quantity by 100.0 LF Item 15 — COMPACTION WITH MOISTURE AND DENSITY CONTROL — Decrease Quantity by 750.0 CY Item 29—STORM SEWER GRAVITY MAIN, TRENCHED, HDPE, 12 -INCH DIA. — Increase Quantity by 35.0 LF Item 32—REINSTALLATION OF EXISTING CHAIN-LINK FENCE - 10' HEIGHTS — Decrease Quantity by 100.0 LF Item 45 —TOPSOIL, FURNISH AND SPREAD — Decrease Quantity by 500.0 CY Item 46 —TEMPORARY SEEDING — Decrease Quantity by 5.0 AC Division 2 - Item 1— LINSEED OIL TREATMENT— Decrease Quantity by 5,315.0 SY Change Order No. 1- Item 1— NAG 575 SINGLE STRAW MATTING — Increase Quantity by 293.6 SQ Item Summary: ITEM NO. ITEM DESCRIPTION UNIT QUANTITY UNIT COST TOTAL AMOUNT Final Contract Amount 4 SILT FENCE LF 446.0 $1.80 $802.80 5 MOBILIZATION, EROSION CONTOL EA 3.0 $500.00 ($1,500.00) CR 12 REMOVE EXISTING CHAIN-LINK FENCE, 10' HEIGHT LF 100.0 $1.00 ($100.00) CR 15 COMPACTION WITH MOISTURE AND DENSITY CONTROL CY 750.0 $4.00 ($3,000.00) CR 29 STORM SEWER GRAVITY MAIN, TRENCHED, HDPE, 12 -INCH DIA. LF 35.0 $33.00 $1,155.00 32 REINSTALLATION OF EXISTING CHAIN-LINK FENCE - 10' HEIGHT LF 100.0 $3.00 ($300.00) CR 45 TOPSOIL, FURNISH AND SPREAD CY 500.0 $4.00 ($2,000.00) CR 46 TEMPORARY SEEDING AC 5.0 $300.00 ($1,500.00) CR D2-1 LINSEED OIL TREATMENT SY 5,315.0 $0.50 ($2,657.50) CR CO#1-1 NAG 575 SINGLE STRAW MATTING SQ 293.6 $24.25 $7,119.80 NET INCREASE ($1,979.90) CR B. Reason for ordering change or extra work: Adjust quantities for all items listed above to the final as -built quantities. C. Settlement for cost of work to be made as follows: Compensation already made to contractor through original bid unit prices. Project Summary: Original Contract Amount $514,955.64 Change Order # 1 $1,537.45 Change Order# 2 ($1,979.90) CR Final Contract Amount $514,513.19 CITY OF WATERLOO BY: C:), Jl_a__.Q_Arl . Mayor (46 -VV -7 13 Date Benton's Sand & Gravel, Inc. CONTRACTOR BY: N v‘orPa(0lzi )4 l/'� Date (AIST: PRINTED NAME: RS t <1,6 611 1141 CS 1� l TITLE: City Clerk Date APPROVED: (1x1rA ) 7 911 City Engineer Date