HomeMy WebLinkAboutWood Construction CO#1 - 2/19/2018CHANGE ORDER NO. 1
Owner Waterloo Regional Airport, City of Waterloo, Iowa Date February 14, 2018
Project Hangar No. 4 Rehabilitation
Owner's Contract No. State Contract No. 19599 Contractor Wood Construction, Inc.
Date of Contract Start November 29, 2017
ted to make the following changes in the Contract Documents. Description:
ITEM
NO.
DESCRIPTION
UNIT
UNIT
PRICE
QUANTITY
AMOUNT
101
Asbestos Testing
LS
$ 369.00
1
$ 369.00
102
Replace Exterior Apron Flood Lights
EA
$ 792.75
2
$ 1,585.50
103
Repair Aluminum Entrance Door
T&M
$ 2,000.00
1
$ 2,000.00
104
Replace Steel Door at Covered Entrance to
Hangar
T&M
$ 4,500.00
1
$ 4,500.00
TOTALS
$ 8,454.00
Reason for Change Order:
Item 101 — During construction activities at Hangar #4, it was noticed that caulk around windows that were
identified to be removed showed signs of potential fibers in the caulk and was tested for asbestos to ensure that
proper disposal of these windows did occur.
Item 102 — Two exterior lights on the north side of the hangar will be replaced with energy efficient LED fixtures
that were not included in the original contract.
Item 103 — The main entrance door to the aircraft maintenance facility is not opening and closing properly. In
order to seal the building, the existing door will be removed and reinstalled after adjusting of the frame and
grinding of the floor and replacement of the threshold to allow the door to properly open and close. Work will be
completed at a time and materials cost not to exceed for this item.
Item 104 — The main entrance door to the hangar from the south side is through a covered entrance. The existing
door is of original construction and is in poor condition and in need of replacement. The door, door hardware,
threshold, metal frame and weather stripping will be replaced. The door, frame and wall will be painted upon
installation. Work will be completed at a time and materials cost not to exceed for this item.
Hangar #4 Rehabilitation
CO -1
1
Project No — 60555170
CONTRACT PRICE
Original: $
Previous C.O.s (ADD): $
This C.O. (ADD): $
Contract Price with all
approved Change Orders: $
65,522.00
0.00
8,454.00
73,976.00
CONTRACT TIMES (Calendar Date)
Substantial Final
completion completion
Original:
Previous C.O.s (ADD):
This C.O. (ADD):
REVISED:
4/20/2018
0
0
4/20/2018
It is agreed by the Contractor that this Change Order includes any and all costs associated with or resulting from the
change(s) ordered herein, including all impact, delays, and acceleration costs. Other than the dollar amount and time
allowance listed above, there shall be no further time or dollar compensation as a result of this Change Order.
THIS DOCUMENT SHALL BECOME AN AMENDMENT TO THE CONTRACT AND ALL
STIPULATIONS AND COVENANTS OF THE CONTRACT SHALL APPLY HERETO.
RECOMMENDED: ` \
.
Engineer (Authorized Signature)
APPROVED:
By:
—714cicat
Owner (Authorized Signature)
ACCEPTED:
By:
Contractor (Authorized Si a
Date
Date
47.4Y1`0,
Date
Hangar #4 Rehabilitation CO -1 Project No — 60555170