HomeMy WebLinkAboutBHCo - Cooperative Agreement Elk Run / Donald St-3/5/2018Black Hawk County Engineer's Office
Cooperative Agreement
For Construction Projects
Location Elk Run Road / Donald Street
Intersection
Work Type H.M.A. Resurfacing
w/ Cold in Place Recycling
Project No. FM -0007(149)--55-07
This Agreement is entered into by and between Black Hawk County, Iowa hereafter designated the
"County", and the City of Waterloo hereinafter designated the "City".
The County proposes to establish or make improvements to County Road V43 (Elk Run Road) from
Donald Street northerly to County Road C66 (Dunkerton Road) within Black Hawk County, Iowa. This
work shall include the entire intersection of D16 (Donald Street) and V43 (Elk Run Road) with has shared
jurisdiction between the County and the City.
This project shall be divided into two (2) divisions.
• Division 1 (County Jurisdiction) shall include all portions of the project except those detailed in
Division 2.
• Division 2 (City Jurisdiction) shall include the left lane of V43 (Elk Run Road) from station 105+83
northerly to station 106+13; and the right lane of D16 (Donald Street) from station 1104+70.88
easterly to station 1105+70.88. Division 2 shall also include the southwest radius of the
intersection.
The County and the City are willing to jointly participate in said project, in the manner hereinafter
provided; and
This Agreement reflects the current concept of this project which is subject to modification by mutual
agreement between the County and the City; and
Therefore, it is agreed as follows:
1. Project Information
a. The County shall be the lead local governmental agency for carrying out the provisions of this
Agreement.
b. All notices required under this Agreement shall be made in writing to the City's and/or the County's
contact person. The City's contact person shall be the City Engineer, Eric Thorson, P.E.
The County's contact person shall be the County Engineer, Catherine Nicholas, P.E.
2. Project Design
a. The County shall be responsible for the design of all proposed improvements.
b. The project plans, specifications and engineer's cost estimate shall be prepared and certified by the
County.
3. Project Costs
a. The City shall contribute an estimated $11,355.00 toward the project costs as shown on Exhibit A.
b. Once the project has been completed, the City will reimburse the County for the actual construction
costs for their Division of work.
c. The County will not require any reimbursement prior to July 1, 2018 even if the project has been
completed by that date.
4. Bid Letting
The County shall submit the plans, specifications, estimate, and all other contract documents for
review by the Iowa D.O.T.
b. The project will be let by the Iowa D.O.T. in accordance with its normal letting procedures.
c. The County shall be the contracting authority for the project.
5. Construction & Maintenance
a. The County shall be responsible for the daily inspection of the project, including the compilation of a
daily log of materials, equipment, and labor used on the project.
b. The County shall comply with the procedures and responsibilities for materials testing and
construction inspection according to Iowa D.O.T.'s Materials Instructional Memorandums (I.M.'s) and
the Construction Manual. If requested, the Iowa D.O.T. may be able to perform some testing services.
If performed, the Iowa D.O.T. will bill the County for testing services according to its normal policy.
6. Payments and Reimbursements
a. The County shall be responsible for making payments to the contractor(s) for all project costs
incurred in the development and construction of the project.
b. After completion of the project, the County will submit to the City an itemized claim for reimbursement
for eligible project activities. Reimbursement claims shall include certification by a Professional
Engineer licensed to practice in the State of Iowa that all eligible project activities for which
reimbursement is requested have been paid in full and completed in substantial compliance with the
terms of this Agreement.
7. General Provisions
a. The County shall maintain records, documents, and other evidence in support of the work performed
under the terms of this Agreement. All accounting practices applied and all records maintained will be
in accordance with generally accepted accounting principles and procedures.
b. If any part of this Agreement is found to be void and unenforceable then the remaining provisions of
this Agreement shall remain in effect.
c. This Agreement is not assignable without the prior written consent of the City.
d. It is the intent of both (all) parties that no third party beneficiaries be created by this Agreement.
e. In case of dispute concerning the terms of this Agreement, the parties shall submit the matter to
arbitration pursuant to Iowa Code Chapter 679A. Either party has the right to submit the matter to
arbitration after ten (10) days notice to the other party of their intent to seek arbitration. The written
notice must include a precise statement of the disputed question. The City and the County agree to
be bound by the decision of the appointed arbitrator. Neither party may seek any remedy with the
State or Federal courts absent exhaustion of the provisions of this paragraph for arbitration.
f. This Agreement may be executed in two (2) counterparts, each of which so executed will be deemed
to be an original.
g. This Agreement, as well as the unaffected provisions of any previous agreement(s), addendum(s),
and/or amendment(s); represents the entire Agreement between the County and City regarding this
project. All previously executed agreements will remain in effect except as amended herein. Any
subsequent change or modification to the terms of this Agreement will be in the form of a duly
executed amendment to this document.
IN WITNESS WHEREOF, each of the parties hereto has executed this Agreement as of the date shown
opposite its signature below.
BOARD OF SUPERVISORS OF BLACK HAWK COUNTY:
By: Date
Chairperson
ATTEST:
By:
County Auditor
CITY OF WATERLOO:
By: L�L� ,LC f�I"� 4` �IvL+ Date 3 /a 11
City of Waterloo Mayor
ATTEST:
By:
City Clerk
Black Hawk County
EIk Run Road H.M.A. Resurfacing wl CIP Recycling
FM -C007(149)--55-07
Prolect Cost Estimate - Division 2 (City Portion)
Exhibit A
Date: 1/9/2018
Est. By: C.A.W.
Check By:
Pape 1 of 1
ITEM #
ITEM CODE
BID ITEM DESCRIPTION
QUANTITY
UNIT
RATE
TOTAL
DIVISION 2
1
2102-2713090
EXCAVATION, CLASS 13, WASTE
0.00
CY
$ 32.00
$ -
2
2121-7425020
GRANULAR SHOULDERS, TYPE B
25.00
TON
$ 21.00
$ 525.00
3
2214-5145150
PAVEMENT SCARIFICATION
299.30
SY
$ 8.30
$ 2,484.19
4
2303-1042500
HOT MIX ASPHALT HIGH TRAFFIC, INTERMEDIATE COURSE, 1/2 IN. MIX
0.00
TON
$ 32.00
$ -
5
2303-1043500
HOT MIX ASPHALT HIGH TRAFFIC, SURFACE COURSE, 1/2 IN. MIX, NO SPECIAL FRICTION
0.00
TON
$ 34.00
$ -
6
2303-1053500
HMA VT SURF, 1/2", NO FRIC
50.00
TON
$ 36.00
$ 1,800.00
7
2303-1258284
ASPHALT BINDER, PG 58-28H, HIGH TRAFFIC
0.00
TON
$ 425.00
$ -
8
2303-1258286
ASPH BINDER, PG 58-28E
4.25
TON
$ 475.00
$ 2,018.75
9
2303-6911000
HOT MIX ASPHALT PAVEMENT SAMPLES
0.00
LS
$ 950.00
$ -
10
2303-7000610
PAYMENT ADJUSTMENT INCENTIVE/DISINCENTIVE FOR HMA MIXTURE LABORATORY
0.00
EACH
$ 1.00
$ -
11
2303-7000620
PAYMENT ADJUSTMENT INCENTIVE/DISINCENTIVE FOR HMA MIXTURE FIELD VOIDS
0.00
EACH
$ 1.00
$ -
12
2303-9091010
RUMBLE STRIP PANEL (HMA SURFACE)
0.00
EACH
$ 575.00
$ -
13
2315-8275025
SURFACING, DRIVEWAY, CLASS A CRUSHED STONE
0.00
TON
$ 21.00
$ -
14
2316-0000120
PAYMENT ADJUSTMENT INCENTIVE/DISINCENTIVE FOR HMA PAVEMENT SMOOTHNESS
0.00
EACH
$ 1.00
$ -
15
2318-1001100
COLD IN-PLACE RECYCLED ASPHALT PAVEMENT
0.00
SY
$ 1.65
$ -
16
2318-1001220
ASPHALT STABILIZING AGENT (FOAMED ASPHALT)
0,00
TON
$ 400.00
$ -
17
2515-6745600
REMOVAL OF PAVED DRIVEWAY
0.00
SY
$ 10.50
$ -
18
2527-9263109
PAINTED PAVEMENT MARKING, WATERBORNE OR SOLVENT -BASED
1.96
STA
$ 8.25
$ 16.17
19
2528-8445110
TRAFFIC CONTROL •
0.05
LS
$ 4,000.00
$ 200.00
20
2528-8445113
FLAGGERS
4.00
EACH
$ 465.00
$ 1,860.00
21
2528-8445115
PILOT CARS
1.00
EACH
$ 700.00
$ 700.00
22
2533-4980005
MOBILIZATION
0.05
LS
$ 35,000.00
$ 1,750.00
23
2599-9999013
SMOOTHNESS SPECIFICATION FOR COLD IN-PLACE RECYCLING
0.00
MILE
$ 400.00
$ -
otal Project Cost) $ 11,354.
110/2018
0172.20.2.2051engSlEng SharedIADSK DIviIVCivi13D ProJectetPAV-Elk Run Road-6181Cost Estimates -Design Tabs1618-Master Project Tabs & Estimaee Template (2 Div).xlsb
$ 11,355.00
Page 1 of 1