HomeMy WebLinkAboutWoodruff Construction - CO#2 Hangar No. 4 Rehab - 3/12/2018CHANGE ORDER NO. 2 Owner Waterloo Regional Airport, City of Waterloo, Iowa Date March 5, 2018 Project Hangar No. 4 Rehabilitation Owner's Contract No. State Contract No. 19599 Contractor Wood Construction, Inc. Date of Contract Start November 29, 2017 You are directed to make the following changes in the Contract Documents. Description: ITEM DESCRIPTION UNIT UNIT QUANTITY AMOUNT NO. PRICE 105 Replace Steel Entrance Door T&M $ 1,200.00 1 $ 1,200.00 TOTALS S 1,200.00 Reason for Change Order: Item 105 — The entrance door to the maintenance shop office area is of original construction and is in poor condition and in need of replacement. The door, door hardware, threshold, and weather stripping will be replaced. The door, frame and wall will be painted upon installation. Work will be completed at a time and materials cost not to exceed for this item. Hangar #4 Rehabilitation CO -2 1 Project No — 60555170 CONTRACT PRICE Original: Previous C.O.s (ADD): This C.O. (ADD): Contract Price with all approved Change Orders: $ 75,176.00 CONTRACT TIMES (Calendar Date) Substantial Final completion completion $ 65,522.00 Original: $ 8,454.00 Previous C.O.s (ADD): $ 1 200.00 This C.O. (ADD): REVISED: 4/20/2018 0 0 4/20/2018 It is agreed by the Contractor that this Change Order includes any and all costs associated with or resulting from the change(s) ordered herein, including all impact, delays, and acceleration costs. Other than the dollar amount and time allowance listed above, there shall be no further time or dollar compensation as a result of this Change Order. THIS DOCUMENT SHALL BECOME AN AMENDMENT TO THE CONTRACT AND ALL STIPULATIONS AND COVENANTS OF THE CONTRACT SHALL APPLY HERETO. RECO By: MENDED: Engi er (Authorized Signature) APPROVED: By: Owner (Authorized Signature) ACCEPTED: By: /14 Contractor (Authorized ture) 31/4/aorg" Date Date ate Hangar #4 Rehabilitation CO -2 Project No — 60555170 2