WATERLOO CITY
COUNCIL WORK SESSION
MARCH 19T", 2018
SHARED SERVICES COMMIT 1 EE
SHARED SERVICES COMMITTEE
• Initiated by Mayor Hart and Supervisor Magsamen
• Facilitated by INRCOG
• Started in Spring of 2016
1
3/19/2018
SHARED SERVICES COMMITTEE
• Work is just getting started!
• Areas of opportunity for sharing
• Human Resources Subcommittee
• Wastewater Subcommittee
• Other?
AREAWIDE WASTEWATER TREATMENT FACILITY
• Wastewater treatment facility needs are a priority
• Formed a Subcommittee of the Shared Services Committee for WWT
• First meeting regarding this topic was held in September 2016
• Included Cities of Waterloo, Cedar Falls, Evansdale, Hudson, Elk Run Heights, and
Raymond
• Discussed existing systems and future needs
• Researched feasibility of regional systems
• Discovered an existing 1973 study
3
CONV74YANCE OF WASTEWATER TO ONE CENTRAL
LOCATliON FOR TREATMENT
131,6L4 /MA
Waterloo Water
Pollution Control
Facility 1
3/19/2018
EXISTING WATER POLLUTION CONTROL
FACIIIITIES °CATIONS
tan. FALLS
WiT61.00
fUttL•414 DOME
3/19/2018
BENEFITS
• Determines the viability of a regional system today
• Offers a potential long-term solution
• Takes a regional approach to meeting needs
• Eases capacity concerns
• Intended to address regulatory compliance requirements
• Future costs are shared
• Environmental benefits
QUESTIONS?
Next Steps
• Contract establishment for the update
• Development of the update
• Data collection
• Meetings
• Written report
• Presentations
• Local Governments
• Iowa Department of Natural Resources
7
ATTACHMENT A
Scope of Services
AC' coI"/IARevt' e®.vrefl-c-
Project Description
This project pertains to regionalization of wastewater feasibility review for the metropolitan area of Black
Hawk County.
INRCOG and the surrounding communities would like to have a feasibility review of the possibility for
wastewater regionalization within the Black Hawk County metro area. In the early 1970s, a study was
performed and a document was created called the Areawide Comprehensive Sewer Study for the
Metropolitan Area of Black Hawk County, Iowa. Many of the concepts and approaches contained in that
study are still valid today. For the purpose of this review, this project would be an update of the feasibility
aspects of the previous study and that document would be used as a guide and reference.
Over the next decade, both Waterloo and Cedar Falls may be required to complete major upgrades to
their wastewater treatment facilities to comply with the future nutrient discharge limitations proposed by
Iowa Department of Natural Resources. With the costs of these upgrades, there may be some long-term
economic benefit to utilize one wastewater treatment facility for both communities instead of upgrading
and maintaining two separate facilities. Along with this, some of the other surrounding communities may
be able to benefit by abandoning their existing treatment facilities and combining with this one facility:
The other surrounding communities reviewed include Elk Run Heights, Evansdale, Hudson and
Raymond.
The feasibility review would look at the general infrastructure aspects that would be required to bring
wastewater from each community to a common location for treatment and discharge. For this review, the
Waterloo WPCF would be the site that wastewater would be conveyed to from Cedar Falls and the other
participating communities. Requirements and costs of infrastructure to allow regionalization will be
updated and viewed by current standards and future projections within this review.
Scope of Services
The Scope of Services will encompass and include detailed work, services, materials, equipment,
personnel and supplies necessary to provide the feasibility review as described herein. The Scope of
Services is further defined as follows:
Task 1 - Updated Population Projections (20 -year) for Each Community. Compile existing available
population projection data from each participating community. A 20 -year time horizon will be used for the
population projection.
Task 2 - Review Current and Future Land Use. Review available land -use data provided from
participating communities for current and future conditions.
Task 3 - Review NPDES Permits for Permitted Flows and Loadings. Review each community's current
wastewater NPDES permit for permitted flows and loadings.
Task 4 - Existing Flows and Loadings. Review existing flow and loading data provided by each
participating community.
Task 5 - Projected Flows and Loadings (20 -Year). Review future flow and loading data provided by
participating communities. Provide conceptual -level flow and loading projections (20 -year) based on the
information obtained and compiled.
Task 6 - Required Infrastructure to Convey to Waterloo WPCF. Review the required infrastructure
needed to convey wastewater from each community to the Waterloo WPCF.
[DRAFT
RESOLUTION #
A RESOLUTION OF THE CITY COUNCIL OF WATERLOO, IOWA, AUTHORIZING THE MAYOR TO SIGN A
MEMORANDUM OF UNDERSTANDING WITH THE IOWA NORTHLAND REGIONAL COUNCIL OF
GOVERNMENTS FOR UPDATING THE 1973 AREAWIDE SANITARY SEWER STUDY (STUDY).
WHEREAS, the City of Waterloo (City) is a member in good standing with the Iowa Northland Regional
Council of Governments (INRCOG), and
WHEREAS, the City has passed a corresponding Memorandum of Understanding with INRCOG; is a member
of INRCOG; and agrees to the Iowa Code, as amended, governing INRCOG (IC 28H and 28E.12); and
WHEREAS, Waterloo City Council wishes to direct INRCOG to contract with AECOM, such that they may
update the above -noted Study, and
WHEREAS, the costs of updating the Study will be shared equally with the City of Cedar Falls, and
NOW THEREFORE, the Waterloo City Council directs its Mayor to sign a Memorandum of Understanding
with INRCOG to contract with AECOM for updating the Study.
Passed and approved this day of 2018.
Mayor
City of Waterloo, Iowa
ATTEST:
City Clerk
City of Waterloo, Iowa
L,
ng,
tfn• ten+
wi
art ..
L.w9 �I
li
Waterloo "r--
82425
Cdr
sr
6124
v
y{pins rlyi
1
t.
s
"
11
CNsr. Slay
11l7eaaia,ro
n-
1
-JientNs
IU4'hLOW gRrt
6tiQaif6 o
x wi L Cedar Falls 3 7:,.r Ill
26.01/ ( 'e
6
Q
me. ...».
11
emisomwrr -�
a
ltdson
7470
T � 115.02-
, ,
ikinN
,6.040349
• e4fq.i IJna
1�W1a0Ara .
caimA.w
flak Run Heights 24870
...., l fi, { X20 --- ..
Hfi i I ; ' I
cw.+mdM; .
J +—
4,
GUQdttl _
Raymond
65820
I.ha-*m i
R "Di
1. Ur
I oss:
I rbry .p.
1
tohobiale
J,/
HdaaaAva
='Ip
'I
ss Ile
rra 21B
X41+� 4 2 .01
:, .
•
a;vaitsidae 25995
fk
:297r
1
a
at r _ I ild it ' rtviD
Strand Associates, Inc.®
1)
Wastewater Planning
• WWTP Facilities Plan and Nutrient Reduct
• Lagoon Biogas End Use Study
on Study
City of Waterloo
City Council Workshop
March 19, 2018
Randy Wirtz, Ph.D., P.E., ENV SP
Nick Bartolerio, P.E.
Wastewater Facilities Plan and Nutrient Reduction Study
Wastewater Facilities Plan
Nutrient Reduction Study
Planning document for the
City's wastewater treatment
plants for 20 years and
beyond. Considers existing
facilities, anticipated growth,
and future permit
requirements to evaluate
and recommend WWTP
improvements.
STRAND
"Subreport" to the Facilities
Plan focused on the WWTP
improvements necessary for
nutrient (nitrogen and
phosphorus) removal as
required by the Iowa DNR.
1
Wastewater Facilities Plan Drivers
STPA, D
' Previous facilities plan
developed in the 1990s
' Age of facilities — at the end
of the typical useful life
o Concerns with overall
efficiency and performance
' Inefficiencies in existing
WWTP operation — using
less than half of available
tankage and loadings
exceed "useable" capacity
o Construction permit/SRF
Loan requirement
Nutrient Reduction Study Drivers
NPDES Permit Requirement
• due April 1, 2018
Identify improvements necessary for
nutrient reduction to be included in
next NPDES permit:
* 66% Total Nitrogen Reduction
o 75% Total Phosphorus Reduction
Reductions cannot be met without
WWTP capital improvements
2
Plan Development
1 , Current WWTP condition and performance evaluation
2. Year 2040 flow and loading projections
3. Process model development and evaluation of treatment performance
at future conditions
4. Determination of treatment deficiencies and future needs
5, Analysis of treatment alternatives — economic and technical evaluations
6. Project recommendations and implementation
Phased Implementation of Recommended Plan
$100 million of capital improvements identified over the
next 10-20 years
Phase Cost
Addresses
Near -Term (2018-2023) $55.3 million
Mid -Term (2023-2028) $29.5 million
Long -Term (2028+) $15.3 million
Note: Costs in 1st Quarter 2018 Dollars
,s
STRAND
Nutrient Removal and
Immediate Needs
Equipment Replacement
Hydraulic Capacity
3
Recommended Plan: Near -Term Improvements (2018-2023)
• Nutrient Removal Improvements and Immediate Needs
• Consolidation of two WWTPs using existing unused tankage to
solve capacity issues and provide excess capacity for growth
• Complies with IDNR's nutrient removal requirements
Improves energy efficiency and process performance
• Potential digester gas reuse revenue
STRAND
Optional Digester Gas Beneficial Reuse
• Digester gas currently only used to heat digesters, excess flared
• Potential option to produce pipeline quality natural gas
• Similar to Dubuque, Sioux City, Des Moines
• Revenue generation through renewable energy credit program
• Preliminary Estimate - $1.2 million net revenue per year
4
Recommended Plan: Mid -Term Improvements (2023-2028)
• Equipment replacement
• Structural rehabilitation
Roofs
4 Windows/doors
HVAC
Misc. structural repairs
• Equalization Basin Improvements
?AND
Recommended Plan: Long -Term Improvements (2028+)
Hydraulic improvements to comply with IDNR requirements
5
Recommended Plan Phased Implementation
Phase
Cost
(2018 Basis)
Future Loan
Payment
Addresses
Near -Term (2018-2023) $55.3 million $3.6 million Nutrient Removal and
Immediate Needs
Mid -Term (2023-2028) $29.5 million $2.2 million Equipment Replacement
and Buildings
Long -Term (2028+) $15.3 million $1.3 million Hydraulic Capacity
Notes: Costs in 151 Quarter 2018 Dollars
SRF Loans: 20 years @ 2% interest rate
Recommended Plan Phased Implementation
Fiscal Year Total Outlay Loan Disbursement Loan Payment
2019 $3,500,000 ($3,500,000) $0
Near -Term 2020 $13,700,000 ($13,700,000) $0
Improvements 2021 $27,400,000 ($27,400,000) $0
2022 513,700,000 (513,700,000) $3,600,000
Mid -Term 2023 52,500,000 ($2,500,000) $3,600,000
Improvements 2024 516,800,000 ($16,800,000) $3,600,000
2025 516,800,000 (516,800,000) $5,800,000
2026 $0 $5,800,000
2027 50 $5,800,000
2028 $1,700,000 (51,700,000) 55,800,000
Long -Term 2029 $10,000,000 ($10,000,000) $5,800,000
Improvements
2030 510,000,000 ($10,000,000) $7,100,000
2031 $7,100,000
2032 $7,100,000
2033 $7,100,000
2034 57,100,000
2035 57,100,000
2036 57,100,000
2037 $7,100,000
2038 57,100,000
2039 57,100,000
6
Next Steps — Facilities Plan and Nutrient Reduction Study
Finalize and Submit Nutrient Reduction Study to IDNR
Deadline: April 1, 2018
Finalize and Submit Wastewater Facilities Plan to IDNR
Begin Design of Near -Term Improvements Following IDNR
Approval
Anticipated 2-4 months following submittal
Construct Near -Term Improvements: 2019-2022
Lagoon Biogas End Use Study Objectives
Planergy discontinuing
operations
Evaluate necessary
lagoon upgrades
Evaluate revenue from
generation of pipeline
quality gas for pipeline
injection
44.
STF ,,
7
Lagoon Performance and Condition
Lagoon currently performing
exceptionally well
Cover in need of
replacement, leaks resulting
in high biogas oxygen and
nitrogen content
Performance indicates that
lagoon has excess capacity
44
41 ill
STRAND
Lagoon Current and Projected Gas Production
Current Condition
Potential Future
Condition with
Growth and HSW
Influent BOD Load
Biogas Produced
Additional HSW volume
49,000 lbs/day
870,000 cfd
(580 MMBTU/day)
95,000 lbs/day
1,200,000 cfd
(800 MMBTU/day)
65,000 gpd
8
Next Steps — Lagoon Biogas Study
Finalize Capital Cost Opinion and Gas Revenue Estimates :
March/April 2018
Submit Draft Study to City: April 2018
STRAND
ASSOCIATES®
Excellence in Engineering Since 1946
9