Loading...
HomeMy WebLinkAboutWayne Claassen Engineering; Supp #1 - 4/30/2018Extension Project Professional Service Agreement between the City of Waterloo, Iowa and Wayne Claassen Engineering and Surveying Inc. PROJECT: Brock Third Addition Preliminary Plat, Final Plat and Sanitary Sewer Extension TO: Wayne Claassen Engineering and Surveying FROM: City of Waterloo, Iowa You are hereby ordered to make the following changes to the existing Agreement for Professional Services for the Brock Third Addition Preliminary Plat, Final Plat and Sanitary Sewer Extension Project this project, dated 10/02/2017 1. Add the following to said existing Agreement: Part III. TERMS AND CONDITIONS Article 1. ENGINEERING SERVICES 1.1 Basic Services - The Engineer agrees to perform professional services in connection with the Project, as set forth below and contained within this Agreement: A. Preliminary Engineering Phase Task 5. Geotechnical Services. This task includes subcontracting two soil borings to determine soil and groundwater conditions for the crossing of Sergeant Road with a sanitary sewer. Task 6. Easement Preparation. This task consists of surveying and preparing easements for a new sanitary sewer to be constructed from the southeasterly side of Sergeant Road to the west side of Martin Road, generally north of O'Neal Steel. 2. Settlement for cost of work to be made as follows: Increase of $2,150.00 for Task 5 and $3,000.00 for Task 6 for a total of $5,150 to the Basic Preliminary Engineering Phase of the Agreement. The Basic Preliminary Engineering Phase of the Agreement will be $22,150 with this Supplemental Agreement No. 1. Page 1 of 2 3. All other sections of said existing Agreement remain unchanged. CITY OF WATERLOO APPROVED: BY: Q )--� ,vA Quentin Hart, Mayor of Waterloo ATTEST BY: Kelley elche, City Clerk 9/3o 1, 8 Date Page 2 of 2 WAYNE CLAASSEN ENGINEERING AND SURVEYING, INC. BY: uUfj, — —� William J. Cl ssen, President ATTEST�G1� Denise DeLeon, Secretary 1112-11 r Date