HomeMy WebLinkAboutWayne Claassen Engineering; Supp #1 - 4/30/2018Extension
Project Professional Service Agreement
between the City of Waterloo, Iowa and
Wayne Claassen Engineering and Surveying Inc.
PROJECT: Brock Third Addition Preliminary Plat, Final Plat and Sanitary Sewer
Extension
TO: Wayne Claassen Engineering and Surveying
FROM: City of Waterloo, Iowa
You are hereby ordered to make the following changes to the existing Agreement for
Professional Services for the Brock Third Addition Preliminary Plat, Final Plat and
Sanitary Sewer Extension Project this project, dated 10/02/2017
1. Add the following to said existing Agreement:
Part III. TERMS AND CONDITIONS
Article 1. ENGINEERING SERVICES
1.1 Basic Services - The Engineer agrees to perform professional services in connection
with the Project, as set forth below and contained within this Agreement:
A. Preliminary Engineering Phase
Task 5. Geotechnical Services. This task includes subcontracting two soil borings to
determine soil and groundwater conditions for the crossing of Sergeant Road with a
sanitary sewer.
Task 6. Easement Preparation. This task consists of surveying and preparing easements
for a new sanitary sewer to be constructed from the southeasterly side of Sergeant Road
to the west side of Martin Road, generally north of O'Neal Steel.
2. Settlement for cost of work to be made as follows:
Increase of $2,150.00 for Task 5 and $3,000.00 for Task 6 for a total of $5,150 to the
Basic Preliminary Engineering Phase of the Agreement. The Basic Preliminary
Engineering Phase of the Agreement will be $22,150 with this Supplemental
Agreement No. 1.
Page 1 of 2
3. All other sections of said existing Agreement remain unchanged.
CITY OF WATERLOO
APPROVED:
BY: Q )--� ,vA
Quentin Hart, Mayor of Waterloo
ATTEST BY:
Kelley elche, City Clerk
9/3o 1, 8
Date
Page 2 of 2
WAYNE CLAASSEN
ENGINEERING AND SURVEYING,
INC.
BY: uUfj, — —�
William J. Cl ssen, President
ATTEST�G1�
Denise DeLeon, Secretary
1112-11 r
Date