HomeMy WebLinkAboutMike Dolan Concrete & Masonry - 4/30/2018CITY OF WATERLOO, IOWA FINAL QUANTITY ADJUSTMENT PROJECT: FY 2017 CITY OF WATERLOO PERMEABLE ALLEY CONTRACT NO. 905 Date Prepared: April 17,2018 AMOUNT: $734.22 INCREASE TO: MIKE DOLAN CONCRETE AND MASONRY, INC. , Contractor You are hereby ordered to make the following changes from the plans and specifications or perform the following extra work on your contract dated February 20, 2017. A. Description of change to be made or extra work to be done: Adjust original construction quantities to actual construction quantities. B. Reason for ordering change or extra work: As -built quantities varied for some bid items C. Settlement for cost of work to be made as follows: Compensation already made to contractor through bid items. See attached summary. TOTAL INCREASE $734.22 BY: Yrs, Z -1 �I3o�� Ef Mike Dolan Concrete and Masonry Inc. Mayor Date CONTRACTOR ATTEST: +,:3D -t& City Clerk Date BY: Ot,-* 60-a- Date TITLE: 00rfi.Sl_�84f APPROVED: 1.� : 5/2/18 City Engineer Date Final Quantity Adjustment Cont. #905 Sheet 1 of 2 2017 City of Waterloo Permeable Alley Bid Item Bid Item Description Units Original Bid quanti Final Quantity quantity Difference Dolan Unit Price Dolan Unit Price Extended 72,404.83 Increase/ Decrease 1 Pavement Removal SF 5,800 5,800 0.0 $ 0.75 $ 4,350.00 $ 2 Excavation- Pavement Subbase CY 102.2 113.7 11.5 $ 12.00 $ 1,364.40 $ 138.00 3 Excavation- Paver Rock Chamber CY 456.8 393.3 -63.5 $ 10.00 $ 3,933.00 $ (635.00) 4 8" P.C.C. Pavement SF 3,310 4585 1,275.0 $ 7.50 $ 34,387.50 $ 9,562.50 5 Pavement Granular Subbase Tons 186.2 220.5 34.3 $ 18.50 $ 4,079.25 $ 634.55 6 Intake, SW -401 Each 1 1 0.0 $ 2,200.00 $ 2,200.00 $ - 7 Intake, SW -504 (Modified) Each 1 1 0.0 $ 51100.00 $ 5,100.00 $ 8 Structure Adjustments Each 7 2 -5.0 $ 400.00 $ 800.00 $ (2,000.00) 9 8"d1a. Subdrain - Solid LF 20 20 0.0 $ 6.00 $ 120.00 $ 10 8"dia. Subdrain -Slotted LF 100 100 0.0 $ 6.00 $ 600.00 $ 11 Paver Border LF 300 300 0.0 $ 99.50 $ 29,850.00 $ 12 Permeable Gravel Base (1" Clean) Tons 86.4 73.3 -13.1 $ 21.80 $ 1,597.94 $ (285.58 13 Permeable Gravel Base (3" Clean) Tons 777.0 670.0 -107.0 $ 20.75 $ 13,902.50 $ 2,220.25) 14 Permeable Pavers SF 2,475.0 2,156.308 -318.7 $ 13.00 $ 28,032.00 $ (4,143.00) 15 Geogrid - Under Pavers SF 2,600 2425 -175.0 $ 1.00 $ 2,425.00 $ (175.00 16 Geogrid- Under Rock Chamber SF 2,480 2125 -355.0 $ 0.40 $ 850.00 $ (142.00) 17 Chamber Liner SF 280.0 280.0 0.0 $ 3.00 $ 840.00 $ 18 Traffic Control LS 1.0 1.0 0.0 $ 2,000.00 $ 2,000.00 $ Alt 1-1 Chamber Uner(Entire Chamber) SF 3,850.0 3,850.0 0.0 $ 1.25 $ 4,812.50 $ Alt 1-2 8"dia. Subdrain -Solid LF 200.0 200.0 0.0 $ 6.00 $ 1,200.00 $ 1001 Fuel Oil Tank Removal LS 1.0 1.0 0.0 $ 4,000.00 $ 4,000.00 $ 1002 Fill in Building Walls LS 1.0 1.0 0.0 $ 6,700.00 $ 6,700.00 $ 1003 Backfill for Underground Vaults LS 1.0 1.0 0.0 $ 4,650.00 $ 4,650.00 $ 2001 Safe Fence LS 1.0 - 1.0 0.0 $ 825.00 $ 825.00 $ 2002 Footing Redding Stone LS 1.0 1.0 0.0 $ 6,452.63 $ 6,452.63 $ FINAL QUANTITY SUMMARY $ 165,071.72 1 $ 734.22 T�TAI PAY ESTIMATE#1 $ 44,183.79 PAY ESTIMATE#2 - $ 39,830.50 PAY ESTIMATE #3 $ 72,404.83 PAY ESTIMATE #4 $ 399.01 RETAINAGE $ 8,253.59 TOTAL PAYMENTS $ 165,071.72 CHANGE ORDER #1 ITEMS 1001, 1002, & 1003) $ 15,350.00 CHANGE ORDER #2 (ITEMS 2001 & 2002 $ 7,277.83 CHANGE ORDER TOTAL $ 22,627.63 ORIGINAL CONTRACT AMOUNT $ 141,769.87 CHANGE ORDER TOTAL $ 22,627.63 FINAL QUANTITY SUMMARY $ 734.22 FI NAL CONTRACT AMOUNT $ 165,671.72 FINAL QTY. ADJ. Cont. #905 Sheet 2 Of 2