Loading...
HomeMy WebLinkAboutAspro FY18 Street Reconstruction, C.O. #1 Cont 944 - 5/29/2018 CITY OF WATERLOO, IOWA CHANGE or EXTRA WORK ORDER NO. 1 PROJECT: F.Y. 2018 STREET RECONSTRUCTION PROGRAM CONTRACT NO. 944 Date Prepared: May 23, 2018 AMOUNT: $ 2,475.00 INCREASE TO- ASPRO, INC. , Contractor You are hereby ordered to make the following changes from the plans and specifications or perform the following extra work on your contract dated Aril 16 2018 A. Description of change to be made or extra work to be done: 1001 Install three steel guardrail posts at the box culvert on E. San Marnan Access Road with IDOT Standard Road Plan BA-210 Adaptor B. Reason for ordering change or extra work: 1001 Proposed guardrail posts located on box culvert need to be steel posts with adaptor unit as per BA-210 C. Settlement for cost of work to be made as follows- 1001. Guardrail posts, Steel, w/ BA-210 Adaptor 3 Each @ $825.00 Each = $2,475.00 TOTAL INCREASE $2,475.00 ASPRO, INC. CONTRACTOR BY: y Date APPROVED: nterim CNIrrigineer r Date i f Change Order No. 1 Contract No. 944 Page 1/1