HomeMy WebLinkAboutCroell, Inc. - CO #3 - Reconstruct Taxiway C - 7/9/2018 CHANGE ORDER NO. 3 Owner Waterloo Reeional Airport City of Waterloo Iowa Date June 26,2018 Project Reconstruct Taxiway C—North of Runway 12/30 Reconstruct Taxiway C South of Runway 12/30 Owner's Contract No.FAA AIP Project No 3-19-0094-045 Contractor Croell,Inc. Date of Contract Start July 17,2017 You are directed to make the following changes in the Contract Documents. Description: Item No. Description Unit Unit Price Quantity Amount 29 Electrical Handhole,L-868 EA $712.02 1 $ 712.02 110 Directional Bore for 2-2 Inch Conduits LF $ 13.20 190 $2,508.00 111 2-Inch Schedule 40 HDPE LF $0.94 400 $376.00 112 Equipment Mobilization for Directional Bore LS $550.00 1 $550.00 113 Manhole Adjustment EA $3,500.00 1 $3,500.00 Total Change Order $ 7,646.02 Reason for Change Order: The existing conduit under Runway 12-30 was found to be filled with sand. New conduit installed adjacent to existing conduit will be used to convey new electrical cable. Existing manhole containing FAA cable located in pavement taper of Taxiway C requires adjustment to final paving grade. Reconstruct Taxiway C—North of Runway 12/30 CO-3 Project No—60550592 Reconstruct Taxiway C—South of Runway 12/30 1 CONTRACT PRICE CONTRACT TIMES(Calendar Days) To substantial To final completion completion Original: $_ 2,128,833.19 Original: 150 Previous C.O.s(DEDUCT):$-----7,.940.10 Previous C.O.s(ADD): 4 This C.O. (ADD): $ 7,642.02 This C.O. (ADD): 4 Contract Price with all REVISED: 158 approved Change Orders: $ 2,144,415.31 It is agreed by the Contractor that this Change Order includes any and all costs associated with or resulting from the change(s)ordered herein,including all impact,delays,and acceleration costs. Other than the dollar amount and time allowance listed above,there shall be no further time or dollar compensation as a result of this Change Order. THIS DOCUMENT SHALL BECOME AN AMENDMENT TO THE CONTRACT AND ALL STIPULATIONS AND COVENANTS OF THE CONTRACT SHALL APPLY HERETO. REC MENDED: M o B 1/115 Engi er(Authorized 'gnature) Date APPROVED: Owner(Authorized Signature) Date AC;ontractor((AAuthhoriiz,.e.,di T By: I lol Signature) Date Reconstruct Taxiway C—North of Runway 12/30 CO-3 Project No—60550592 Reconstruct Taxiway C—South of Runway 12/30 2