HomeMy WebLinkAboutSupplemental Attachments - 7/30/2018 kr f� 1' ,..iN.r• ''
University Avenue Reconstruction
snit
Construction & Design Update
d �
CONSTRUCTION
rf.$. ]IN
IN :z
PROGRESS
_0
• Construction Update
— Phase 1 — Middle Section
• Design Updates
— Proposed Change in Phasing
— East Section Design Considerations
— West Section Design Considerations
— Proposed Enhancements
a
A=COM
1
b +
• Pavement
— Roadway
— Shared Use Paths
— Decorative Concrete
Shared Use -
ath
� c
r
n
• Utility
— Water Main
— Storm Sewer '�Il�f�'�k r,
— Traffic Signals '
— Street Lights �s
-
AECOM
--------------
2
y „ sv
t%-
wit
• Target Completion for Roadway - November 16th , 2018
- Includes roadway paving, storm sewer, water main.
• Target Final Completion — May 31 st , 2019
- Includes landscaping, shared use path, sidewalk, roadway, medians.
• Upcoming Major Traffic Switches
— Mid-August—Shift head-to-head traffic to the newly constructed eastbound lanes
(south side) of University Ave from Falls Ave to Dundee Ave.
— Mid-September— Shift head-to-head traffic entirely to the eastbound (south side) of
University Ave from Greenhill Rd to Dundee Ave.
A=COM
i • •
A=COM
3
u
a
Design Updates
A=COM
k�
WestSection
2020
Middle Section East Section Mwrss
2018 2019
0
A=COM
4
h:
East Section
Design Considerations
AiCOM
I
s
Y i
p+v
t{ tR
I ROUNDABOUt,P
UNIVERSITY AVENUE
AND FLETCHER AVENUE
5
Midway Drive B/10.;, B/12.7 Minimal Severe None Severe
Progress Drive C/26.5 C/23.7 Minimal Severe None Minimal
Tunis Drive B/13 C/17.0 Minimal Severe(?) None Moderate
Greenhill West Ramp N/A B/11.5 Minimal Minimal None Improved
Greenhill East Ramp N/A�jj B/11.3 Minimal Severe None Moderate
Casey's/Becks A/6.44C/15.3 Minimal Severe None Severe
Falls Avenue B/16.7"mm C/21.1 Minimal Severe(?) None Severe
Sager Avenue A/7.3 B/12.0 Minimal Minimal None Severe
Ansborough Avenue C/36.9 C/23 d "''' Minimal Moderate None Minimal
Wallgate Avenue A/1.6 C/18.0 Minimal Moderate None None
Fletcher Avenue B/19.7 C/16.6 Minimal Minimal None None
0 Source:2011 Traffic Study
A=COM
q
i-9
" � shy r., � ,"F� •Sp ,,/ $`�
ST
i sy " AYE. .•-
�9
r
OA—
w-wASNp� oH sr
...t.... W WASHINGTON ST
Ilk�.
c"
'; .. 213 ,,;•
s
— UNi1lERStTY AYE.
a
RANOALL
m ••••Existing Trait Route
ail s Proposed University Ave Trail Route ;, .ti' q'6p N sr
Possible Additional Trail Route Ni
GTON ST.
� Possible Additional Trail Raute#2 (EIWN � dp
QGti Possible Additional Trail Route ff3 w ag
6
It
Pon
West Section
Design Considerations
AECOM
• Evaluation for At-Grade • Bridge Enhancements
Intersection — Greenhill Road Bridge
— Developable Parcels with Enhancement
Excess ROW • Pedestrian Lighting
— Enhancements • Decorative Handrailing
— Roundabout / Signalized • Decorative Bridge Treatments
Intersection — Estimated Additional
— Reduces Long Term Construction Costs $750,000
Maintenance
Estimated Additional
Construction Costs $6.5M
A=COM
7
F
frill °' • '
SOus
POTENTIAL DEVEyLOPMENT
iii —.>'a .r wY. �w .w. �,.�„ �•e AiROf)R7
Q,
POTENTIALDEVELOPMENT "
r
�Q
:r X `
Signalized Intersection
A=COM
Nr
y�
4� • Z
9r¢ou3 ".gyp q p+ °S
YMCA
POTENTIAL DEVELOP ;
ma
.,.u..„,.. •a r, s s s a s
i:.
POTENTIAL DEVELOPMENT
40
Roundabout Intersection
A=COM
8
R
f
w
04 Conceptual Bridge Enhancements
A=COM
y
v
<x
�' Amt*� ff�"'s�a"x•..r
Conceptual Bridge Enhancements
A=COM
9
Enhancements
A=COM
W
e ;N ;
AECOM University Avenue Median looking Towards Falls Avenue A=COM
10
�i ///�r eryti/, f✓C,
;. "..
University Avenue&Falls Avenue Intersection AECOM
JAZ—COM
5
;t
'a
a
� r
z
COMUniversity Avenue&Ansborough Avenue Intersection ®ate
11
Intersection
Mark
Malar Intereec[bn Mxker�pestan AtternNive t
u.vw brtwvxemuerhw.eenu ttnn•rnei 3100 _
t �
I
c
in M..n.S:xnles>Sxael Leltnrs
I ,
A=COM
•
t2i i r iv
z
�e.tensrr£1�mttmn
i
o Ht.S-1-1 Stee
t�tter�
10'Mt.(.._iter C.— � � 5"Ht sI.IN—steel Letters
I
Corten steal
(i corten steel column
2'r—terae
R. sl—
c.[—
t v..E.
v V s✓
A=COM
12
Placement Option 1:Bus Stop
A Ilk7
r y
Placement Option 2:Behind Walk at Intersection Corner
CO-
ASCO
v,
r
• Middle Segment Enhancements • Intersection Markers
(Already Completed)
• Wayfinding Signage
• Greenhill Road & University
Avenue Intersection Evaluation • Median Treatments
• Bridge Enhancements • Landscaping / Plantings
— Greenhill Road Bridge Enhancement • Enhanced Crosswalks
— Black Hawk Creek Enhancements
• Box Culvert Enhancements • Drone Video
— For Recreational Trail Crossing
A=COM
13
Public Information Meeting
Tentative Date: August 16th
A=COM
IBM
Questions/Comments
A=COM
14