Loading...
HomeMy WebLinkAboutAECOM - Virden Creek Floodwall - 8/20/2018 _ AECOM 319-232-6531 tel C0m Suite Sycamore Street 319-232-0271 fax Suite 222 Waterloo,Iowa 50703 www.aecom.com CITY OF WATERLOO VIRDEN CREEK FLOODWALL U.S. HIGHWAY 63 TO 4TH STREET SUPPLEMENTAL AGREEMENT NO. 2 WHEREAS, a Professional Services Agreement was entered into between City of Waterloo, Iowa, (Client), and AECOM Technical Services, Inc. (ATS), of Waterloo, Iowa, dated June 27, 2011, for increasing the flood protection level of the Virden Creek channel and earthen levee from U.S. Highway 63 to Gates Park near 4th Street in Waterloo, Iowa; and WHEREAS, the Client and ATS entered into Supplemental Agreement No. 1 on December 11, 2017, for additional design, including collecting additional stream channel data, completing a hydrologic review of the project area and preparing a hydraulic model of the stream using the new data; and WHEREAS, the Client and ATS now desire to enter into Supplemental Agreement No. 2 for additional structural design. NOW THEREFORE, it is mutually agreed to amend the original Professional Services Agreement as follows: I. Project Description AECOM completed hydraulic modeling for the Virden Creek floodwalls as part of Supplemental Agreement No. 1. This work involved recreating the FIS modeling in HEC- RAS. The recreated or corrected effective model used the same hydrology as the original model. However, based on the updated topography and hydraulic modeling outputs, there were some differences (both increases and decreases) from the published Base Flood Elevations (BFEs) shown in the FIS. The increase in the BFEs shown in the corrected effective modeling required additional structural design to the floodwalls that were initially based on the published BFE values. II. Scope of Services The Scope of Services for this supplemental agreement will encompass and include detailed work, services, materials, equipment, personnel and supplies necessary to complete the remaining structural design of the Virden Creek floodwalls. Quality control reviews are also included for this additional design work. The following identifies tasks leading to the completion of the additional work in this supplemental agreement: Task 1 - Additional Structural Design and Plan Revisions. Floodwalls will be designed using Corps of Engineers standards to accommodate the updated base flood elevations for Virden Creek. This will require structural revisions to be designed and incorporated in the plan set. Task 2 - Quality Control Review and Administration. This task includes quality control review by senior technical staff not directly involved in the updated structural design. This task also includes project coordination for the plan revisions. �com Page 2 III. Compensation Compensation for the above services will be on an hourly basis in accordance with Part VI of the original agreement and shall be integrated with the fees in the original agreement and Supplemental Agreement No. 1. The estimated fee is Twenty-Five Thousand Dollars ($25,000.00). IV. In all other respects, the obligations of the Client and the Consultant shall remain as specified in the Professional Services Agreement dated June 27, 2011. IN WITNESS WHEREOF, the parties hereto have executed this Supplemental Agreement No. 2 as of the dates shown below: AECOM TECHNICAL SERVICES, INC. L 2 By Date August 14, 2018 Douglas W. Schindel, P.E. Associate Vice President APPROVED FOR CITY OF WATERLOO By: Date �90 ao R' Quentin Hart Mayor 0:\Administration\AGREE\SUPPLE\SA2 Wat Virden Creek Floodwall.doc