HomeMy WebLinkAboutIDOT City Bridge Federal Aid Swap Funding - 9/10/2018 Please return this caPY to:
City Clerk & Finance Dept.
715 Mulberry St.
June 2018
Waterloo, IA 50703
IOWA DEPARTMENT OF TRANSPORTATION
AGREEMENT FOR CITY BRIDGE FEDERAL-AID SWAP FUNDING
CITY: Waterloo
PROJECT NO. : BROS-SWAP-8155(759)--SE-07
AGREEMENT NO. : 2-18-HBP-SWAP-009
This is an agreement between the City of Waterloo, Iowa (hereinafter referred to as the Recipient) and the Iowa
Department of Transportation (hereinafter referred to as the Department) , for funding through the Federal-aid Swap City
Highway Bridge Program (HBP) under 761 Iowa Administrative Code (IAC) Chapter 161 .
The parties agree as follows:
1 . The Recipient shall be the lead local governmental agency for carrying out this agreement.
2. All notices required under this agreement shall be in writing to the Department and the Recipient's contact person .
The Department's contact person shall be the District 2 Local Systems Engineer. The Recipient's contact person
shall be the City Engineer.
3. The Recipient shall be responsible for the development and completion of the following bridge project:
A. FHWA Structure Number: 501680
B. Location: Hammond Avenue over Sink Creek
C. Preliminary Estimated Total Eligible Costs: $835,000
4. The eligible project construction limits shall include the bridge plus grading and paving to reach a "touchdown
point" determined by the Department. Eligible project costs include construction costs. Non-construction costs
incurred for engineering, inspection, and right-of-way, may be applied towards the local match for Construction.
Certain activities necessary to comply with Federal or State environment or permit requirements, including studies
and mitigation of the project's environmental impacts, are also eligible. Costs associated with permitting and
studies may be applied towards the local match for Construction. With prior approval of the Department utility
relocations, construction of items related to mitigation activities, and Railroad activities that are associated with
work inside the eligible project construction limits, but performed outside of the Prime Contractor's contract may
be reimbursed as construction costs.
5 . Costs associated with work outside the eligible project construction limits, routine maintenance activities,
operations, and monitoring expenses are not eligible. In addition, administrative costs, and fees or interest
associated with bonds or loans are not eligible.
6. 80% of the eligible construction project costs incurred after the effective date of this agreement shall be paid from
Federal-aid Swap funds up to a maximum of $ 1 ,000,000. At no time will the reimbursed amount exceed
$1 , 000, 000. Non-construction costs related to the development of the construction project may be applied toward
the 20% match required for the Recipient. Non-construction costs are identified in paragraph 4. Eligible non-
construction costs may be used to decrease the 20% local match for Construction . Any reduction in the 20% local
match for Construction will be reimbursable after the Prime Contractor's retainage is paid and the local
Construction contract is closed. The maximum amount paid to the Recipient will be the total actual construction
cost after non-construction costs are applied to the 20% match or $1 , 000, 000 whichever is less. The Recipient
shall pay 100% of the non-eligible project costs. Reimbursed costs will be limited to state funds that are made
available to cities through the County and City Bridge Construction Funds outlined in 761 Iowa Administrative
Code, Chapter 161
7. The Recipient shall conduct project development and implementation in compliance with applicable laws,
ordinances, and administrative rules. For projects which also include Farm-to-Market funds, the Recipient shall
follow all administrative and contracting procedures required for Farm-to-Market projects.
June 2018
8. The Recipient shall pay for all project costs not reimbursed with City Bridge Program funds.
9. The project shall be let to contract within 3 years of the date this agreement is signed by the Department. If not,
the Recipient may be in default, for which the Department may revoke funding commitments. This agreement may
be extended for a period of 6 months upon receipt of a written request from the Recipient at least 30 days prior to
the 3-year deadline.
10. If any part of this agreement is found to be void and unenforceable then the remaining provisions of this
agreement shall remain in effect.
11 . This agreement is not assignable without the prior written consent of the Department.
12. It is the intent of both (all) parties that no third party beneficiary be created by this agreement.
13. This agreement and the attached Exhibit 1 constitute the entire agreement between the Department and the
Recipient. No representations, promises, or warranties have been made by either party that are not fully
expressed in this agreement. Any change or alteration to the terms of this agreement must be made in the form of
an addendum to this agreement which shall be effective only upon written acceptance of the Department and the
Recipient.
June 2018
IN WITNESS WHEREOF, each of the parties hereto has executed this agreement as of the date shown opposite its
signature below.
City Signature Black 4
By L 1 1 oM 15n ! Date 20 �U
Title of city official
I , i clyttn -Vewc , certify that I am the City Clerk of Waterloo, and
that &>Je A-fid,+- , who signed said Agreement for and on behalf of the city was duly authorized to
execute the same by virtue of a formal resolution duly passed and adopted by the city on the 11b ti day of
S�e-p It-h��a� 20 1
Signed Date 1 ` l 20Z
City Clerk of Wate o, Iowa
IOWA DEPARTMENT OF TRANSPORTATION
Highway Division
By Date 120
Robert A. Welper, P. E.
Local Systems Engineer
District 2
June 2018
EXHIBIT 7
General Agreement Provisions for use of Federal-aid Swap Funds on Non-primary Projects
Unless otherwise specified in this agreement, the Recipient shall be responsible for the following :
1. General Requirements.
a . The Recipient shall take the necessary actions to comply with applicable State and Federal laws and
regulations. To assist the Recipient, the Department has provided guidance in the Instructional
Memorandums to Local Public Agencies (I . M. $), available on-line at:
httos://iowadot.gov/local systems/publications/im/Ioa-ims. The Recipient shall follow the applicable
procedures and guidelines contained in the I.M.s in effect at the time project activities are conducted .
b. In accordance with Iowa Code Chapter 216 and associated subsequent nondiscrimination laws and
regulations, the Recipient shall not discriminate against any person on the basis of race, color, creed, age,
sex, sexual orientation, gender identity, national origin, religion, pregnancy, or disability.
c. The Recipient shall comply with the requirements of Title II of the Americans with Disabilities Act of 1990
(ADA), Section 504 of the Rehabilitation Act of 1973 (Section 504), the associated Code of Federal
Regulations (CFR) that implement these laws, and the guidance provided in I . M. 1 .080, ADA Requirements.
When pedestrian facilities are constructed, reconstructed , or altered, the Recipient shall make such facilities
compliant with the ADA and Section 504.
d. The Recipient agrees to indemnify, defend, and hold the Department harmless from any action or liability
arising out of the design, construction , maintenance, placement of traffic control devices, inspection, or use
of this project. This agreement to indemnify, defend , and hold harmless applies to all aspects of the
Department's application review and acceptance process, plan and construction reviews, and funding
participation.
e. Termination of funds. Notwithstanding anything in this agreement to the contrary, and subject to the
limitations set forth below, the Department shall have the right to terminate this agreement without penalty
and without any advance notice as a result of any of the following: 1 ) The Federal government, legislature
or governor fail in the sole opinion of the Department to appropriate funds sufficient to allow the Department
to either meet its obligations under this agreement or to operate as required and to fulfill its obligations
under this agreement; or 2) If funds are de-appropriated, reduced , not allocated , or receipt of funds is
delayed, or if any funds or revenues needed by the Department to make any payment hereunder are
insufficient or unavailable for any other reason as determined by the Department in its sole discretion; or 3)
If the Department's authorization to conduct its business or engage in activities or operations related to the
subject matter of this agreement is withdrawn or materially altered or modified. The Department shall
provide the Recipient with written notice of termination pursuant to this section.
2 Programming
a The Recipient shall be responsible for including the project in the appropriate Regional Planning Affiliation
(RPA) or Metropolitan Planning Organization (MPO) Transportation Improvement Program (TIP). The
Recipient shall also ensure that the appropriate RPA or MPO, through their TIP submittal to the Department,
includes the project in the Statewide Transportation Improvement Program (STIP). If the project is not
included in the appropriate fiscal year of the STIP, funds cannot be obligated.
b. Before beginning any work for which funding reimbursement will be requested, the Recipient shall submit
a written request for acceptance to the Department. The Department will notify the Recipient when
acceptance is granted. The cost of work performed prior to acceptance will not be reimbursed . The turning
in of plans for letting by the Department's administering office shall be considered acceptance for
construction. The Department will notify the Recipient when acceptance is granted.
3. Design and Consultant Services
a The Recipient shall be responsible for the design of the project, including all necessary plans, specifications,
and estimates (PSBE). The project shall be designed in accordance with the design guidelines provided or
referenced by the Department in the Guide and applicable I . M .s.
EXHIBIT 1
Page 2
A Environmental Requirements and other Agreements or Permits.
a The Recipient shall obtain project permits and approvals, when necessary, from the Iowa Department of
Cultural Affairs (State Historical Society of Iowa; State Historic Preservation Officer) , Iowa Department of
Natural Resources, U .S. Coast Guard, U. S. Army Corps of Engineers, the Department, or other agencies
as required. The Recipient shall follow the applicable procedures in the Instructional Memorandums to
Local Public Agencies Table of Contents, Section 3. 1 -- Environmental Reviews and Permits.
S Right-of-Way, Railroads, and Utilities.
a The Recipient shall acquire the project right-of-way, whether by lease, easement, or fee title, and shall
provide relocation assistance benefits and payments in accordance with the procedures set forth in I . M.
3.600, Right-of-Way Acquisition, and the Department's Office of Right of Way Local Public Agency Manual.
The Recipient shall contact the Department for assistance, as necessary, to ensure compliance with the
required procedures.
b. If a railroad crossing or railroad tracks are within or adjacent to the project limits, the Recipient shall obtain
agreements, easements, or permits as needed from the railroad. The Recipient shall follow the procedures
in I.M . 3.670, Work on Railroad Right-of-Way.
c The Recipient shall obtain agreements from utility companies as needed . The Recipient shall comply with
the " Policy for Accommodating Utilities on the County and City a Non-Primary Federal-aid Road System'
for projects on non-primary Federal-aid highways. For projects connecting to or involving some work inside
the right-of-way for a primary highway, the Recipient shall follow the Department's " Policy for
Accommodating and Adjustment of Utilities on the Primary Road System" The Recipient should also use
the procedures outlined in I . M. 3.640, Utility Accommodation and Coordination, as a guide to coordinating
with utilities.
6. Contract Procurement.
a The following provisions apply only to projects involving physical construction or improvements to
transportation facilities:
b. The project plans, specifications, and cost estimate (PS&E) shall be prepared and certified by a professional
engineer or architect, as applicable, licensed in the State of Iowa.
c The Recipient shall be responsible for the following:
i . Prepare and submit the PS&E and other contract documents to the Department for review and
acceptance in accordance with I .M. 3.700, Check and Final Plans and I .M . 3. 500, Bridge or Culvert
Plans, as applicable.
ii. The contract documents shall use the Department's Standard Specifications for Highway and Bridge
Construction. Prior to their use in the PS&E, specifications developed by the Recipient for individual
construction items shall be approved by the Department.
iii. Follow the procedures in I . M. 5.030, Iowa DOT Letting Process, to analyze the bids received; make a
decision to either award a contract to the lowest responsive bidder or reject all bids; and if a contract is
awarded, execute the contract documents and return to Department.
Note: The Department may not be able to allow a project to be let in the scheduled letting due to possible
issues with cash flow availability.
d The Recipient shall forward a completed Project Development Certification (Form 730002) to the
Department in accordance with I . M. 5.050, Project Development Certification Instructions. The project will
not be turned in for bid letting until the Department has reviewed and approved the Project Development
Certification.
a If the Recipient is a city, the Recipient shall comply with the public hearing requirements of the Iowa Code
section 26. 12.
EXHIBIT 1
Page 3
f. The Recipient shall not provide the contractor with notice to proceed until after receiving written notice that
the Department has concurred in the contract award.
7. Construction.
a. The Recipient shall follow the procedures in I .M. 6 . 000, Construction Inspection , and the Department's
Construction Manual , as applicable, for conducting construction inspection activities. The Recipient's
engineer shall at all times be responsible for inspection of the project.
b. A full-time employee of the Recipient shall serve as the person in responsible charge of the construction
project. For cities that do not have any full time employees, the mayor or city clerk will serve as the person
in responsible charge, with assistance from the Department.
c. Traffic control devices, signing , or pavement markings installed within the limits of this project shall conform
to the "Manual on Uniform Traffic Control Devices for Streets and Highways" per 761 IAC Chapter 130.
Proper protective measures and devices such as fences, barricades, signs, flood lighting, and warning
lights as needed.
d. The project shall be constructed under the Department's Standard Specifications for Highway and Bridge
Construction and the Recipient shall comply with the procedures and responsibilities for materials testing
according to the Department's Materials I . M .s. Available on-line at: https://www.iowadot.gov/erl/index. html.
e. If the Department provides any materials testing services to the Recipient, the Department will bill the
Recipient for such testing services according to its normal policy as per Materials I .M. 103.
8. Reimbursements.
a. The Recipient will be initially responsible for all project costs. After costs have been incurred, the Recipient
shall submit to the Department periodic itemized claims for reimbursement for eligible project costs.
Requests for reimbursement shall be made at least semi-annually but not more than bi-weekly.
b. To ensure proper accounting of costs, reimbursement requests for costs incurred prior to June 30 shall be
submitted to the Department by August 1 , if possible, but no later than August 15.
c. Reimbursement claims shall include a certification that all eligible project costs, for which reimbursement is
requested , have been reviewed by an official or governing board of the Recipient, are reasonable and
proper, have been paid in full, and were completed in substantial compliance with the terms of this
agreement.
d. The Department will reimburse the Recipient for properly documented and certified claims for eligible
project costs. The Department may withhold up to 5% of the total funds available for the project.
Reimbursement will be made either by State warrant or by crediting other accounts from which payment
was initially made. If, upon final review or audit selected by the Administering Office, the Department
determines the Recipient has been overpaid, the Recipient shall reimburse the overpaid amount to the
Department. After the final review is complete and after the Recipient has provided all required paperwork,
the Department will release the funds withheld .
e. The total funds collected by the Recipient for this project shall not exceed the total project costs. The total
funds collected shall include any funds received; for example, Federal funds not received through FHWA,
any special assessments made by the Recipient (exclusive of any associated interest or penalties) pursuant
to Iowa Code Chapter 384 (cities) or Chapter 311 (counties), proceeds from the sale of excess right-of-
way, and any other revenues generated by the project. The total project costs shall include all costs that
can be directly attributed to the project. In the event that the total funds collected by the Recipient do exceed
the total project costs, the Recipient shall either:
L in the case of special assessments, refund to the assessed property owners the excess special
assessments collected (including interest and penalties associated with the amount of the excess), or
ii . refund to the Department all funds collected in excess of the total project costs (including interest and
penalties associated with the amount of the excess) within 60 days of the receipt of any excess funds.
EXHIBIT 1
Page 4
9. Project Close-out.
a. Acceptance of the completed construction shall be with the concurrence of the Department. Within 30 days
of completion of construction or other activities authorized by this agreement, the Recipient shall provide
written notification to the Department. The Recipient shall follow and request a final review, in accordance
with the procedures in I . M. 6. 110, Final Review, Audit, and Close-out Procedures for Federal-aid Projects.
Failure to comply with the procedures may result in loss of funds and the ability to let future projects through
the Department; reimbursed funds shall be returned and a possible suspension may be placed on the
Recipient from receiving funds from the Department on future projects until the Recipient has demonstrated
responsible management of funds on roadway projects.
b. For construction projects, the Recipient shall provide a certification by a professional engineer, architect, or
landscape architect as applicable, licensed in the State of Iowa, indicating the construction was completed
in substantial compliance with the project plans and specifications.
c. Final reimbursement of funds shall be made only after the Department accepts the project as complete.
d. The Recipient shall maintain all books, documents, papers, accounting records, reports, and other evidence
pertaining to costs incurred for the project. The Recipient shall also make this documentation available at
all reasonable times for review by the Department. Copies of this documentation shall be furnished by the
Recipient if requested. Such documentation shall be retained for at least 3 years from the date of the
Department's signature of the Department's Statement of Completion and Final Acceptance of Work (Form
830435) or the Certificate of Completion and Final Acceptance of Agreement Work (Form 640003) .
e. The Recipient shall maintain, or cause to be maintained, the completed improvement in a manner
acceptable to the Department.