Loading...
HomeMy WebLinkAboutKWS, Inc. CO#1 - 9/17/2018 CITY OFWATERLOO, IOWA CHANGE ORDER NUMBER I Project -Y Lmprovements Traffic Operations Project Number: TDF-252 Project No: CS-TGF-81 Kind ofVVmric Traffic Signals Date Prepared. 09/10/2018 Contractor: KVVS |nc. The above referenced project's cost is hereby modified as described in this Change Order document. A-Description u[change hobomade orextra work tobedone� Connecting trafffic signal controller cabinet to railroad cabinet and adding 2 programmable visibility signal heads. 8-Reason for change urextra work: Railroad preemption system must bncompleted before the - my�nbe-oonm|sm/oned' They are currentour ly Omahing. / oznnmc^ion is needed between signal cabinet and railroad cabinet. -m'are now change ordering contract with KVS so they performLhe worktomake the connection. Due toacute angle ofthe intersection streets 2more programmable vimibiUb/signal heads are needed so that each approach sees their own signal indication only, ' C-Settlement for cost ofwork babamade mofollows: $20,0OU.0Ufor total and final cost ofthis change order. D-Fina|Cmoim[theConbac �� $208,000.00 total including this change order. Recommend For Appnovat Project ngineer Receipt is acknowledged of this change order and terms of settlement are hereby agreed to. For City mfWaterloo: aqtmin lL For Contractor. "m'=`=° /mm' ��------- ~/ 8ign~^~' //on' Data l )I-/