HomeMy WebLinkAboutKWS, Inc. CO#1 - 9/17/2018 CITY OFWATERLOO, IOWA
CHANGE ORDER NUMBER I
Project
-Y Lmprovements Traffic Operations Project Number: TDF-252
Project No: CS-TGF-81
Kind ofVVmric Traffic Signals Date Prepared. 09/10/2018
Contractor: KVVS |nc.
The above referenced project's cost is hereby modified as described in this Change Order document.
A-Description u[change hobomade orextra work tobedone�
Connecting trafffic signal controller cabinet to railroad cabinet and adding 2 programmable visibility signal heads.
8-Reason for change urextra work:
Railroad preemption system must bncompleted before the - my�nbe-oonm|sm/oned' They are currentour ly
Omahing. / oznnmc^ion is needed between signal cabinet and railroad cabinet. -m'are now change ordering
contract with KVS so they performLhe worktomake the connection. Due toacute angle ofthe intersection
streets 2more programmable vimibiUb/signal heads are needed so that each approach sees their own signal
indication only,
'
C-Settlement for cost ofwork babamade mofollows:
$20,0OU.0Ufor total and final cost ofthis change order.
D-Fina|Cmoim[theConbac ��
$208,000.00 total including this change order.
Recommend For Appnovat
Project ngineer
Receipt is acknowledged of this change order and terms of settlement are hereby agreed to.
For City mfWaterloo:
aqtmin lL For Contractor.
"m'=`=° /mm'
��------- ~/ 8ign~^~' //on'
Data l )I-/