CHANGE ORDER NO.4
Owner City of Waterloo Date: 9/27/2018
Project University Avenue Reconstruction-Phase 1
Owner's Contract No. 933 Contractor: Peterson Contractors,Inc.
Date of Contact Start 3/12/2018 Contract Amount: $ 8,709,078.89
You are directed to make the following changes in the Contract Documents. Description:
4-1 Sanitary Sewer Pipe,Trenched,Truss 8" $ 60.00 /LF x 333 LF $ 19,980.00
4-2 Sanitary Sewer Pipe,Trenched,DIP 8" $ 95.00 /LF x 41 LF $ 3,895.00
4-3 Sanitary Sewer Manhole,SW-301,48" $ 6,250.00 /EA x 1 EA $ 6,250.00
4-4 Sanitary Sewer Connection to Existing MH $ 4,000.00 /EA x 1 EA $ 4,000.00
4-5 Sanitary Sewer Temp Connection $ 2,000.00 /EA x 1 EA $ 2,000.00
4-6 Sanitary Sewer Pipe Removal $ 18.50 /LF x 374 LF $ 6,919.00
4-7 Sanitary Sewer Mobilization $ 3,000.00 /EA x 1 EA $ 3,000.00
4-8 Fittings by Count,Ductile Iron,6 in,Elbow $ 400.00 /EA x 1 EA $ 400.00
4-9 Mast Arm Mounted Signage $ 550.00 /EA x 4 EA $ 2,200.00
4-10 Jointing,Expansion Temp Concrete $ 1.25 /LF x 1000 LF $ 1,250.00
TOTAL ADDITIONS $ 49,894.00
Reason for Change Order
4-1 Existing pipe needed reconstruction due to condition and flow issues found during construction.
4-2 Existing pipe needed reconstruction with DIP due to minimal separation of storm found during construction.
4-3 Existing manhole was paved over and condition unknown until construction exposed manhole.
4-4 Connection of new sanitary sewer to existing.
4-5 Connection of new sanitary sewer to existing.
4-6 Removal of existing sanitary sewer due to existing condition.
4-7 Additional cost of mobilization for sanitary sewer work.
4-8 The specific elbow size was needed since the existing water main was found during construction to be a 6 inch water main.
4-9 Signage needed on existing mast arm due to lane reconfiguration on Ansborough Avenue.
4-10 Expansion jointing of temporary concrete is less expensive option than saw cutting for removals.Estimated quantity.
CONTRACT PRICE CONTRACTTIME
To Substantial To Final
Completion Completion
Original: $8,709,078.89 Original Completion Date: 11/16/20181 5/31/2019
Previous C.O.s(ADD/DEDUCT) $ 26,177.87
This C.O.(ADD/DEDUCT) $ 49,894.00 Revised Completion Date: 11/16/20181 5/31/2019
Contract Price with all approved
Change Orders: $8,785,150.76
It is agreed by the Contractor that this Change Order includes any and all costs associated with or resulting from the change(s)ordered herein,
including all impact,delays,and acceleration costs. Other than the dollar amount and time allowance listed above,there shall be no further
time or dollar compensation as a result of this Change Order.
THIS DOCUMENT SHALL BECOME AN AMENDMENT TO THE CONTRACT AND ALL
STIPULATIONS AND COVENANTS OF THE CONTRACT SHALL APPLY HERETO.
APPROM.
BY: ` I 0
Owner(Authorized Signature) Date
ACCEPTED: J
Contractor(Authorized Signa re) Date
ACCEPTED:
BY: 10/1/2018
AECOM Date
AECO M
60569973 4
Project No. C.O.No.
PETERSON CONTRACTORS, INC. �
104 Btackhawk Street
P.O.Box A
Reinbeck, Iowa 50669
www.petersoncontractors.com Phone: 319-345-2713 Fax: 319-345-2991
QUOTE
PROPOSAL FOR: J7539 Sanitary Sewer Replacement
THE FOLLOWING ITEMS AND PRICES ARE QUOTED:
ITEM# DESCRIPTION UNIT TYPE QUANTITY UNIT PRICE TOTAL AMOUNT
1 MOB LS 1.000 3,000.00 3,ODO.00
2 8"TRUSS PIPE LF 333.000 60.00 19,980.00
3 8"DIP SANITARY SEWER LF 41.000 95.00 3,895,00
4 48"SANITARY MANHOLE EA 1.000 6,250.00 6,250.00
5 MANHOLE CONNECTION EA 1.000 4,000.00 4,000.00
6 TEMPORARY CONNECTION EA 1.000 2,000.00 2,000.00
7 SANITARY PIPE REMOVAL LF 374.000 18.50 6,919.00
8 MANHOLE REMOVAL EA 1.000 600.00 600.00
TOTAL QUOTED AMOUNT: S LL 46,644.00
PETERSON CONTRACTORS, INC.
September 27,2018
EZERSaH PETERSON CONTRACTORS, INC.
o�tRat�oR� �
11t.
EXTRA WORK AUTHORIZATION
PtIIItECK IOWA
PO Box A Phone: 319-345-2713
Reinbeck,Iowa 50669 Fax: 319-345-2991 www.petersoncontractors.com
Project Name: University Ave. Phase 1-Waterloo, IA PCI Job# J7539
Date:
Extra Work Autorization#
Remarks or Description of Extra Work:
Cost to add a 6"Tee to the water system.
Item# Description QuantityUnits Base Unit Adjusted Unit
Rate %Mark Up %Discount Rate Total Amount
6"Elbow 1.00 EA $400.00 0.00% 0.00% $400.00 $400.00
0.00% 0.00% $0.00 $0.00
0.00% 0.00% $0.00 $0.00
0.00% 0.00% $0.00 $0.00
0.00% 0.00% $0.00 $0.00
Mo% 0.00% $0.00 $0.00
0.00% 0.00% $0.00` $0.00
0.00% 0.00% $0.00 $0.00
0.00% 0.00% $0.00 $0.00
0.00% 0.00% $0.00 $0.00
0.00% 0.00% $0.00 $0.00
Total Amount $400.00
The work covered by this authorization shall be performed in accordance with the same terms and conditions as included in the original contract.
Work Authorized and Changes Approved by:
Prime Contractor or Owner:
Peterson Contractors,Inc.
By By: Chris D. Reshner
Title:
Date: Date:. 7/30/2018
QEZTtRS®11 PETERSON CONTRACTORS, INC.
XIV�
1M RIKIMS EXTRA WORK AUTHORIZATION
\1C.
N E I N B E e N - - IOWA �•rc.,�i�+ '
PO Box A Phone: 319-345-2713
Reinbeck,Iowa 50669 Fax: 319-345-2991 WWW,petersoncontractors.com
Project name: University Ave. Phase I-Waterloo, IA PCI Job# J7539
Date: 09/17/18 Extra Work Autorization#
Remarks or Description of Extra Work:
Additional Signing on Ansborough Ave.
Item# Description Quantity Units Unit Rate %Mark Up %Discount Total Amount
Lane Control Signing 4.00 EAo 0
$500.00 10.00% 0.00% $2,200.00
0.00% 0.00% $0.00
0.00% 0.00%. $0.00
0.00% 0.00% $0.00
0.00% 0.00% $0.00
0.00% 0.00% $0.00
0.00% 0.00% $0.00
0.00% 0.00% $0.00
0.00% 0.00% $0.00
0.00% 0.00% $0.00
0.00% 0:00% $0.00
Total Amount: $2,200.00
The work covered by this authorization shall be performed in accordance with the same terms and conditions as included in the original contract.
Work Authorized and Changes Approved by:
Prime Contractor or Owner:
Peterson Contractors, Inc.
By: By: Chris Fleshner
Title:
Date: Date 9/17/2018
E�ERSati PETERSON CONTRACTORS, INC.
r
EXTRA WORK AUTHORIZATION `
•F(Nfh�
N E I N B E C K ' IOWA
PO Box A Phone: 319-345-2713
Reinbeck,Iowa 50669 Fax: 319-345-2991 wWW.DeterSOtlCOntraCYOES.COR1
Project Name: University Ave. Phase l7Waterloo, IA PCI Job# J7b39
Date: -
Extra Work Autorization#
Remarks or Description of Extra Work:
Expansion Joint for Temporary Paving.
Item# Description Quantity Units Base Unit %Mark Up %Discount Adjusted Unit Total Amount
Rate Rate
*" Expansion Joint for Temporary Paving 1.00 LF $1.25 0.00% 0.00% $0.00 $1.25
0.00% 0.00% $0.00 $0.00
0.00% 0.00% $0.00 $0.00
0.00% 0.00% $0.00 $0.00
0.00% 0.00% $0.00 $0.00
0.00% 0.00% $0.00 $0.00
0.00% 0.00% $0.00 $0.00
0.00% 0.00% $0.00 $0.00
0.00% 0.00% $0.00 $0.00
0.00% 0.00% $0.00 $0.00
0.00% 0.00% $0.00 $0.00
Total Amount: $1.25
The work covered by this authorization shall be performed in accordance with the same terms and conditions as included in the original contract.
Work Authorized and Changes Approved by:
Prime Contractor or Owner:
Peterson Contractors, Inc.
By. By: Chris D. Fleshner
Title: