Loading...
HomeMy WebLinkAboutSupplemental Attachments - 10/15/2018 City of Waterloo Proposed Sewer Fund Rate Increase FYE2019 Monthly Mo Usage CCF Avg User Monthly Base Per CCF Allowance 8 CCF Total Current Rate $ 14.25 $ 2.30 3 $ 11.50 25.75 Proposed Rate $ 15.00 $ 2.40 3 $ 12.00 27.00 % Increase 5.26% 4.35% 4.35% 4.85% Commercial/Industrial Customers 2.40 3 2,250,000 225,000.00 Monthly Mo Usage CCF Avg User Monthly Base Per CCF Allowance 8 CCF Total FYE2020 Current Rate $ 15.00 $ 2.40 3 $ 12.00 27.00 Proposed Rate $ 15.50 $ 2.50 3 $ 12.50 28.00 % Increase 3.33% 4.17% 4.17% 3.70% Commercial/Industrial Customers 2.50 3 2,250,000 225,000.00 AECOM Sanitary Sewer System Master Plan Waterloo,Iowa TABLE 11-1 MASTER PLAN PROJECT LIST AND COST ESTIMATES TO MEET MINIMUM CONSENT DECREE REQUIREMENTS 00 0 Project Name Completion Service Estimated Date Areas Project Description Cost Consent Decree New lift station to supply capacity Dry Run Creek Lift Station and 2018 1 g for growth in area served,and new Interceptor interceptor to divert flows away ' "` from 9' Street corridor. CIPP and Remedial Measures, 2018 11, 15,16, Installation of+/-3,000 LF of Phase III-B 17&19 Cured-In-Place Pipe(CIPP). CIPP and Remedial Measures, 2018 11, 15,16, Installation of+/-12,000 LF of Phase III-C 17&19 Cured-In-Place Pi e CIPP. ' "" Extension of an existing interceptor to provide gravity flow sanitary sewer capacity to areas currently served by Hackett Lift Northwest Interceptor Phase 1 2018-2020 15&16 Station and Cattle Congress Lift Station. Option of replacing existing N.Hackett Rd. Lift Station with new lift station and force main also under consideration. Demolition of Hackett Lift Station Demolition of Hackett Lift Station 2018-2020 15&16 after NW Interceptor' project is complete. Replace existing Titus(Midland) Lift Station and Force Main with a Titus(Midland)Lift Station and Force new lift station and new force main Main Design 2018—2020 10 discharging to the Park Road LS. Include on-site emergency generator. Disconnect Foundation Drains Foundation Drains Removal Program 2018 15&16 Discharging to Sanitary Sewer S stem TOTAL ESTIMATED COST' MASTER PLAN REMEDIAL MEASURES TO MEET MINIMUM CONSENT DECREE REQUIREMENTS: 2018 -2020 Project Name Completion Service Estimated Cost Date Areas Project Description Consent Decree Extension of an existing interceptor to provide gravity flow sanitary sewer capacity to areas currently served by Hackett Lift Northwest Interceptor Phase II 2021 -2023 15&16 Station and Cattle Congress Lift Station. Option of replacing $3,000,000 existing N.Hackett Rd. Lift Station with new lift station and force main also under consideration. Replace existing Titus(Midland) Lift Station and Force Main with a Titus(Midland)Lift Station and Force new lift station and new force main Main Construction 2021—2023 10 discharging to the Park Road LS. Include on-site emergency t eneraor. TOTAL ESTIMATED COST—MASTER PLAN REMEDIAL MEASURES TO MEET MINIMUM CONSENT DECREE REQUIREMENTS: 2€329 -2023 ," 6053259914001401/Sanitary Sewer MasterP/aNMPText.docx 11-2 December2017 AECOM Sanitary Sewer System Master Plan Waterloo,Iowa TABLE 11-1 (Continued) a !!Pr!oje,-tName Completion Service Project Description Estimated Cost Date Areas Consent Decree TOTAL ESTIMATED COST—MASTER PLAN REMEDIAL MEASURES T MEET MINIM,UM CONSENT DECREE REQUIREMENTS: 202 2020 Project Name Completion Service Estimated Cost Date Areas Project Description Consent Decree TOTAL ESTIMATED COSI`—MASTER PLA[ REMEDIAL MEASURES TO �i MEET MINII4 UM CONSENT DECREE REQUIREMENTS: 2027-2029 'I Project Name Completion Service Estimated Cost Date Areas Project Description Consent Decree TOTAL ESTIMATED COST MASTER PLAN REMEDIAL MEASURES TO MEET MINIMUM CONSENT DECREE REQUIREMENTS: 2030 -2032 �j OVERALL COST ESTIMATE BREAKDOWN FOR COMPLETION OF MASTER PLAN PROJECTS REQUIRED TO MEET CONSENT DECREE REQUIREMENTS-2098-2032: 11111111111119N,MAXIe Estimated Cost Consent Decree TOTAL ESTIMATED COST @ ALL MASTER PLAN REMEDIAL MEASURES TO MEET MINIMUM CONSENT DECREE REQUIREMENTS: 2018 -2032 i In accordance with Section V.H of the Consent Decree, the City provides a tentative schedule for implementation of remedial measures. It is recognized that, due to the inherent uncertainties (e.g., potential delay 'due to easements and other contingencies) associated with the remedial measures, and the specific recognition in Paragraph 28.b that the schedule is based upon some long-term "estimate[d] dates," this schedule provides for the rescheduling of remedial measures as the City deems necessary. In no event shall the rescheduling of remedial measures provide for master plan completion later than December 31, 2032, unless the schedule is extended pursuant to Paragraphs 29 or 30 of the Consent Decree. I 60532599/400/401/SandarySewer master P/aNMPTextdocx 11-3 December2017 - AECOM Sanitary Sewer System MasterPlan Waterloo,Iowa TABLE 11-2 PASTER PLAID PROJECT LIST AND COST ESTIMATES IN ACCORDANCE WITH CMOM PROGRAM Project Name Completion Service Estimated Cost CMOM Date Areas Project Description Program Smoke Testing Identified Elimination of storm water inflow Deficiencies—Service 2018-2020 18 sources.Field work conducted by Area 18 WMSD staff. $265,000 Removal of Storm Sewer Intakes Connected To Sanitary sewers: Disconnection of storm sewer o Kingbard Blvd. 2018 19 intakes from sanitary sewer o Woodstock Rd. system included with 2018-2020 $807,000 City Engr.Projects Street Reconstruction projects. Removal of Storm Sewer Intakes ' Connected To Sanitary Sewers: Disconnection of storm sewer West Mitchell Ave.(at 2020 19 cross connection from sanitary Derbyshire) sewer system,performed by $68,000 WMSD Projects WMSD staff. Replace Douglas Lift Station and Douglas Lift Station and Force Main Force Main with a new lift station Replacement 2018-2020 11 and force-main. $875,000 Include provisions for hookup of portable emer enc generator. Additional Study/Field Assessments: East and West Side Interceptor 2018 99 Internal/CCTV inspection and Sewers external pipe structural testing. $300,000 TOTAL ESTIMATED COST—MASTER PLAN REMEDIAL MEASURES IN ACCORDANCE WITH CMOM PROGRAM: 2018 -2020 $2,315,000 T111 EFRAME., e2023 Project Name Completion Service Estimated Cost East Side Interceptor Sewer, Date Areas Project Description CMOM Program Phase 1-Wet Side to Dry Side 2021-2023 99 5,625 LF of new 54-inch dia. $8,400,000 prestressed concrete pipe. Installation of+/-50,000 LF of CIPP and Remedial Measures, Cured-In-Place Pipe(CIPP)and Phase IV-A 2021-2023 12&19 rehabilitation+/-250 manholes to $3,000,000 restore condition of deteriorated Removal of Storm Sewer Intakes sewer segments and manholes. Connected To Sanitary Sewers: Disconnection of storm sewer e2021-2023 12 intakes from sanitary sewer Courtland St. system included with 2021-2023 $905,000 City Engineering Project Street Reconstruction projects. Removal of storm Sewer Intakes Connected To Sanitary Sewers: e Drexel Ave.&Reber Ave. Disconnection of storm sewer o Kothe Ave. cross connections from sanitary a West Parker St. 2021-2023 10, 11, 18 sewer system,performed by $1,322,000 m Marlin Ct. WMSD staff or by low bid contractor. WMSD Projects 6053259914001401/Sandary Sewer Masfer Plan/MP Text.docx 1-4 December 2017 AECOM Sanitary Sewer System Master Plan Waterloo,Iowa TABLE 11-2(Continued) s -e Project Name Completion Service Project Description Estimated Cost Date Areas CMOM Program Replace the existing Cattle Congress Lift Station and Force Main with a new,smaller lift station Cattle Congress Lift Station and 2021—2023 16 and force main after completion of Force Main Replacement the NW Interceptor. $1,304,000 Include provisions for hookup of portable emergency enerator. Rehabilitate the existing Park Road Lift Station with new pumps Park Road Lift Station and Force and controls. Provide anew force Main Rehabilitation 2021—2023 10 main. $1,782,000 Include on-site emergency generator. TOTAL ESTIMATED COST-MASTER ELAN REMEDIAL MEASURES IN $16,713,000 ACCORDANCE WITH CMOM PROGRAM: 2021 -2023 7777- TIMEMANIE. 2024-=6' Project Name Completion Service Project Description Estimated Cost Date Areas CMOM Program Installation of+/-50,000 LF of CIPP and Remedial Measures, Cured-In-Place Pipe(CIPP)and Phase IV-B 2024-2026 12&19 rehabilitation+/-250 manholes to $3,000,000 restore condition of deteriorated sewer segments and manholes. East Side Interceptor Sewer, 2024—2026 gg 51625 LF of 54-inch dia. $8,400,000 Phase 11-Wet Side to Dry Side prestressed concrete pipe. Removal of Storm Sewer Intakes Connected To Sanitary Sewers: f Dearborn Ave.(at Indiana St.) o State St. (Archer Ave.to Disconnection of storm sewer Butler Ave.) cross connections from sanitary o Blowers Ave.(at Wyoming St.) 2024-2026 13 sewer system,performed by $2,172,000 ® Blowers Ave.(at California St.) WMSD staff or by low bid 0 300 Block Indiana St. contractor. 300 Block Butler Ave. WMSD Projects Rehabilitate the existing Garden Avenue Lift Station with pumps Garden Ave.Lift Station and and controls. Provide a new force Force Main Rehabilitation 2024-2026 16 main. $1,625,000 Include on-site emergency generator. Replace the existing Highway 63 South Lift Station and Force Main Highway 63 South Lift Station and with a new lift station and force Force Main Replacement 2024—2026 18 main. $1,380,000 Include on-site emergency generator. TOTAL ESTIMATED COST—DIASTER FLAN REMEDIAL MEASURES IN $16,577,000 ACCORI�A�4CE WITH CMOM PROGRAM: 2024-2026 60532599/400/401/Sanitary SewerMaster PWIMP Text.docx 11-5 December 2017 AECOM Sanitaty Sewer System MasterPlan waterloo,Iowa TABLE 11-2(Continued) A / Project Name Completion Service Estimated Cost Date Areas Project Description CMOM Program Installation of+/-60,000 LF of CIPP and Remedial Measures, 10, 11 & Cured-In-Place Pipe(CIPP)and Phase V-A 2027-2029 13 rehabilitation+/-250 manholes to $5,000,000 restore condition of deteriorated sewer se ments and manholes. Removal of Storm Sewer Intakes Disconnection of storm sewer Connected To Sanitary Sewers: cross connections from sanitary 6 Columbia Cr. 2027-2029 19 sewer system,performed by $1,051,000 City Engr.Projects WMSD staff or by low bid contractor. Removal of Storm Sewer Intakes Disconnection of storm sewer Connected To Sanitary Sewers: cross connections from sanitary 6 Cornwall Ave. 2027—2029 19 sewer system,performed by $108,000 i WMSD Projects WMSD staff or by low bid contractor. Rehabilitate existing Hawkeye Lift Station and Force Main with new Hawkeye Lift Station and Force 2027-2029 23 pumps,HVAC,electrical and $3,114,000 Main Rehabilitation controls. Include on-site emergency generator. Rehabilitate existing Webster Lift ie Station with pumps and controls. l� Webster Lift Station and Force 2027—2029 11 Provide a new force main. Main Rehabilitation $1,463,000 Include provisions for hookup of ;I portable emergency enerator. Replace the existing Cedar Terrace Lift Station and Force Cedar Terrace Lift Station and 2027—2029 23 Main with a new lift station and Force Main Replacement force main. $1,910,000 �I Include provisions for hookup of portable emergency generator. TOTAL ESTIMATED COST—MASTER PLAN REMEDIAL MEASURES IN $12,646,000 ACCORDANCE WITH CMOM PROGRAM: 2027-2029 2030 -2032 Project Name Completion Service Estimated Cost Date Areas Project Description CMOM Program Installation of+/-60,000 LF of CIPP and Remedial Measures, 2030-2032 10'131 & Cured-In-Place Pipe(CIPP)and Phase V-13rehabilitation+/-250 manholes to $5,000,000 restore condition of deteriorated sewer se ments and manholes. Replace existing Greenbrier Lift Greenbrier Lift Station and Force Station and Force Main with a 2030—2032 10 new lift station and force main. Main Replacement $1,361,000 Include provisions for hookup of portable emergency generator. TOTAL ESTIMATED COST—MASTER FLAN REMEDIAL MEASURES III ACCORDANCE WITH CI�OM PROGRAM: 2030-2032 $6,36,,000 i 60532599/400/401/Sanitary Sewer Master Plan/MP Text.docx 11-6 December 2017 f i AECOM Sanitary Sewer System Master Plan Waterloo,Iowa TABLE 11-2(Continued) OVERALL COST ESTIMATE BREAKDOWN FOR COMPLETION OF MASTER PLAN PROJECTS IN ACCORDANCE WITH CMOM PROGRAM-2018-2032: a o Estimated Cost IMATED COSH`—ALL MASTER PLAN, REMEDIAL.MEASURES IN MOM Pro ram ICE WITH CIA010 PROGRAM. 2018 --2032 $54,612,000 In accordance with Section V.H of the Consent Decree, the City provides a tentative schedule for implementation of remedial measures. It is recognized that, due to the inherent uncertainties (e.g., potential delay due to easements and other contingencies) associated with the remedial measures, and the specific recognition in Paragraph 28.b that the schedule is based upon some long-term "estimate[d] dates," this schedule provides for the rescheduling of remedial measures as the City deems necessary. In no event shall the rescheduling of remedial measures provide for master plan completion later than December 31, 2032, unless the schedule is extended pursuant to Paragraphs 29 or 30 of the Consent Decree. 60532599/400/401/Sanitary Sewer Master P/anIMP Text.docx 11-7 December 2017