Loading...
HomeMy WebLinkAboutPeterson Contractors, inc. - C.O. No. 5 - 12/3/2018 CITY OF WATERLOO,IOWA CHANGE or EXTRA WORK ORDER NO. 5 PROJECT: F.Y. 2018 Waterloo Boathouse Enhancements , CONTRACT NO. 940 Date Prepared:_November 8, 2018 AMOUNT: $ 11,225.00 Increase TO: PETERSON CONTRACTORS INC., Contractor You are hereby ordered to make the following changes from the plans and specifications or perform the following extra work on your contract dated October 4, 2017. A. Description of change to be made or extra work to be done: 1. Provide and install 2 each 18" dia. and 1 each 30" dia. SW-512 area drains in the detention area south of the large parking lot. B. Reason for ordering change or extra work: 1. Correct drainage in this area. C. Settlement.for cost of work to be made as follows: 1. 18"dia. SW-512 2 each at$2,250 = $4,500.00. 2. 30" dia. SW-512, 1 each at$2,750 = $2,750.00. 3. 6" dia. RF-19 sub-drain outlet, 1 each at$375.00=$375.00 4. Remove and replace rec trail paving,8 SY at$200.00=$1,600.00 5. Mobilization of equipment, Lump Sum of$2,000.00 Total Net Increase $ 11,225.00 CITY OF WATERLOO PET CONTRACTORS, INC. CONTRACTOR BY: ac,� —� -cr, _ BY: 1 Quentin Hart, Mayor Date 11-201S Date ATTEST: PRINTED NAME: C6 rdC11 ett( SM TITLE: Pr�,(Amt- Kelley, feMlli City Clerk Date (c(�(.t WATERLOO _ VICES WAYNE CLAASSEN ENGINEERING & - SURVEYING, INC. Travis Nichols Date Facilities/Program Manager By:4' 1�4j *�� William J. C a ssen, PE Date