CITY OF WATERLOO, IOWA
CHANGE or EXTRA WORK ORDER NO. 4
PROJECT: F.Y. 2018 Waterloo Boathouse Enhancements ,CONTRACT NO. 940
Date Prepared: November 22,2017 AMOUNT: $_3,000.00 Increase
TO: PETERSON CONTRACTORS INC.,Contractor
You are hereby ordered to make the following changes from the plans and specifications or perform
the following extra work on your contract dated October 4, 2017.
A. Description of change to be made or extra work to be done:
1. Provide and install 1" road stone at west end of west parlking lot for access to overflow
parking.
B. Reason for ordering change or extra work:
1. There was insufficient existing granular material onsite to provide this access after this
parking area was enlarged.
C. Settlement for cost of work to be made as follows:
Add$20.00/installed ton and an estimated 150 ton= $3,000.00.
Total Net Increase $3,000.00 '
CITY OF WATERLOO PETCONTRACT S, INC. CONTRACTOR
f
BY: BY. L �i 11 27 I
Quentin Hart, Mayor Date Date
ATTEST: PRINTED NAME: C d d e I I L ftitru n
�°Z�3� I TITLE: Vre�ict/h�'
Kelley, , ity Clerk Date
WATERLO R ICES
WAYNE CLAASSEN ENGINEERING & \ ! Za I
SURVEYING, INP. Travis ichols Date
Facilities/Program Manager
By:
William J. CI sen, PE Date
(Flies My Documents/Change Order/MASTER)