HomeMy WebLinkAboutSpahn & Rose - C.O. #1-9 - 12/10/2018 f'
i
� F " CONTRACTOR CHANGE ORDER REQUEST SUMMARY � L
Project Name: CITY OF WATERLOO C.O.R.NO: 1
Project NO: Date: 12/5/2018
Prime.Contractor. SPAHN&ROSE LBR'
Description of Change: FRED STUTZMAN ATTEMPTED TO SET COLUMNS&BUILDING INSPECTOR
WOULD NOT PASSTHE HOLES DUE TOSOILCONDITIONS
Prime Contractor Direct Costs
Additive Costs
A Labor1749
B Material
C Equipment
D Subtotal of Additive Cost 1749
Deductive Costs(Use parenthesis to denote negative figures)
E Labor
F Material
G Equipment
H Subtotal of Deductive Cost 0
1 Contractor's Total Direct Cost(D+H) 1749
1 General Contractor's Mark-up
K ITotal Prime Contractor Direct Costs+Mark-up(Line I+1) 1749
L Total Subcontractor Direct Costs
M Subcontractor Mark-up
N General Contractor's Mark-up on Subcontractor Direct Costs
O Total General Contractor Change Request(Lines K+L+M+N) 1749
To the best of my knowledge and belief,I certify that all costs listed above are correct.
-5 c5—
Customer Signature ) Date
x CONTRACTOR CHANGE ORDER REQUEST SUMMARY
3
Project Name: CITY OF WATERLOO C.O.R.NO: 2
Project NO: Date: 12/5/2018
Prime Contractor: SPAHN&ROSE'LBR
Description of Change: ROCK FOR AROUND THE POST HOLES
Prime Contractor Direct Costs
Additive Costs
A Labor
B Material 603
C Equipment
D Subtotal of Additive Cost 603
Deductive Costs(Use parenthesis to denote negative figures)
E Labor
F Material
G Equipment
H Subtotal of Deductive Cost 0
I Contractor's Total Direct Cost(D+H) 603
J General Contractor's Mark-up
K ITotal Prime Contractor Direct Costs+Mark-up(Line d+J) 603
L Total Subcontractor Direct Costs
M Subcontractor Mark-up
N General Contractor's Mark-up on Subcontractor Direct Costs
0 Total General Contractor Change Request(Lines K+L+M+N) 603
To the best of my knowledge and belief,I certify that all costs listed above are correct.
600fractorSignature Dafe
Customer Signature Date
CONTRACTOR CHANGE ORDER RECZUESTrSUMMARY �'.
Project Name: CITY OF WATERLOO C.O.R.NO: 3
Project NO: Date: 12/5/2018`
Prime"Contractor: SPAHN&ROSE LBR
Description of Change: STURDI WALL HARDWARE TO SET POST ON TOP OF THE CONCRETE
FOOTING WALLS
Prime Contractor Direct Costs
Additive Costs
A Labor
B Material 3012
C Equipment
D Subtotal of Additive Cost 3012
Deductive Costs(Use parenthesis to denote negative figures)
E Labor
F Material
G Equipment
H Subtotal of Deductive Cost 0
1 Contractor's Total Direct Cost(D+H) 3012
J General Contractor's Mark-up
K ITotal Prime Contractor Direct Costs+Mark-up(Line I+J) 3012
L Total Subcontractor Direct Costs
M Subcontractor Mark-up
N General Contractor's Mark-up on Subcontractor Direct Costs
0 Total General Contractor Change Request(Lines K+L+M+N) 3012
To the best of my knowledge and belief,I certify that all costs listed above are correct.
Co4ctorSignature Dat
y - - - -
Customer Signature Date
s ,)
CONTRACTOR CHANGE ORDER REQUEST SUMMARY
Project Name: CITY'OF WATERLOO C.O.R:NO: 4
Project NO: Dates 12/5/2018
Prime Contractor: SPAHN&ROSE LBR
Description of Change: LABOR&CONCRETE TO POUR FOOTINGS'&WALLS
Prime Contractor Direct Costs
Additive Costs
A Labor
B Material 26045.25
C Equipment
D Subtotal of Additive Cost 26045.25
Deductive Costs(Use parenthesis to denote negative figures)
E Labor
F Material
G Equipment
H Subtotal of Deductive Cost 0
I Contractor's Total Direct Cost(D+H) 26045.25
J General Contractor's Mark-up
K ITotal Prime Contractor Direct Costs+Mark-up(Une 1+J) 26045.25
L Total Subcontractor Direct Costs
M Subcontractor Mark-up
N General Contractor's Mark-up on Subcontractor Direct Casts
0 Total General Contractor Change Request(Lines K+L+M+N) 26045.25
To the best of my knowledge and belief,I certify that all costs listed above are correct.
Cont ctor Signature Date
Customer Signature 1 Date
CONTRACTOR CHANGE ORDER REC+,UEST SUMMARY `
Project Name: CITY OF WATERLOO C.O.R.NO: 5
Project NO: Date: 12/5/2018
Prime;Contractor: SPAHN&ROSE LBR
Description of Change: 3/0 STEEL WALK DOOR ADDED ON BACKSIDE OF BUILDING'
Prime Contractor Direct Costs
Additive Costs
A Labor
B Material 445.32
C Equipment
D Subtotal of Additive Cost 445.32
Deductive Costs(Use parenthesis to denote negative figures)
E Labor
F Material
G Equipment
H Subtotal of Deductive Cost 0
1 Contractor's Total Direct Cost(D+H) 445.32
1 General Contractor's Mark-up
K ITotal Prime Contractor Direct Costs+Mark-up(Une I+J) 445.32
L Total Subcontractor Direct Costs
M Subcontractor Mark-up
N General Contractor's Mark-up on Subcontractor Direct Costs
O Total General Contractor Change Request(Lines K+L+M+N) 445.32
To the best of my knowledge and belief,I certify that all costs listed above are correct.
Contra 'or S nature 0 to
Customer Signature Date
CONTRACTOR CHANGE ORDER REQUEST SUMMARY
Project Name: CITY OF WATERLOO C.O.R."N0: 6
Project NO: bate: 12/5/2018
Prime Contractor: SPAHN&ROSE LBR
Description of Change: JESUP LAND IMPROVEMENTTO BACKFILL&FURNISHED FILL
Prime Contractor Direct Costs
Additive Costs
A Labor
B Material 5354
C Equipment
D Subtotal of Additive Cost 5354
Deductive Costs(Use parenthesis to denote negative figures)
E Labor
F Material
G Equipment
H Subtotal of Deductive Cost 0
I Contractor's Total Direct Cost(D+H) 5354
J General Contractor's Mark-up
K Total Prime Contractor Direct Costs+Mark-up(Line I+J) 5354
L Total Subcontractor Direct Costs
M Subcontractor Mark-up
N General Contractor's Mark-up on Subcontractor Direct Costs
O Total General Contractor Change Request(Lines K+L+M+N) 5354
To the best of my knowledge and belief,I certify that all costs listed above;are correct.
Contra(or Signature Da e
Customer Signature Date
CONTRACTOR CHANGE ORDER REQUESTSUMMARY � '"
Project Name: CITY OF WATERLOO C.O.R._NO: 7
Project NO: Date: 12/5/2018
Prime Contractor: SPAHN&'ROSE LBR
Description of Change: 12 PCS OF 4"X8"X2"STYROFOAM INSULATION FOR AROUND THE FROST
FOOTINGS IN THE OFFICE-&MECHANICAL ROOM
Prime Contractor Direct Costs
Additive Costs
A Labor
B Material 359.76
C Equipment
D Subtotal of Additive Cost 359.76
Deductive Costs(Use parenthesis to denote negative figures)
E Labor
F Material
G Equipment
H Subtotal of Deductive Cost 0
1 Contractor's Total Direct Cost(D+H) 3S9.76
J General Contractor's Mark-up
K ITotal Prime Contractor Direct Costs+Mark-up(Line I+J) 359.76
L Total Subcontractor Direct Costs
M Subcontractor Mark-up
N General Contractor's Mark-up on Subcontractor Direct Costs
O Total General Contractor Change Request(Lines K+L+M+N) 359.76
To the best of my knowledge and belief,I certify that all costs listed above are correct.
Contr Lor Signature Date
Customer Signature Date
ri
CONTRACTOR CHANGE ORDER REQUEST.SUMMARY
Project Name: CITY OF WATERLOO C.O.R.NO: 8
Project NO: Date: 12/5/2018
Prime Contractor: SPAHN&ROSE LBR
Description of Change:_ ENGINEERING SERVICES FOR THE FOOTINGS,REQUIRED BY BUILDING INSTPECTOR
Prime Contractor Direct Costs
Additive Costs
A Labor 224
B Material
C Equipment
D Subtotal of Additive Cost 224
Deductive Costs(Use parenthesis to denote negative figures)
E Labor
F Material
G Equipment
H Subtotal of Deductive Cost 0
1 Contractor's Total Direct Cost(D+H) 224
1 General Contractor's Mark-up
K ITotal Prime Contractor Direct Costs+Mark-up(Line I+1) 224
L Total Subcontractor Direct Costs
M Subcontractor Mark-up
N General Contractor's Mark-up on Subcontractor Direct Costs
0 Total General Contractor Change Request(Lines K+L+M+N) 224
To the best of my knowledge and belief,I certify that all costs listed above are correct.
rj-
Contra&r Signature Date
Customer Signature Date
CONTRACTOR CHANGE,,ORDER'REQUEST SUMMARY
Project Name: CITY OF WATERLOO C.O.R.NO: 9
Project NO Date: 12/5/2018
Prime Contractor: SPAHN`&ROSE LBR
Description of Change: CONCRETE FOR THE FOOTINGS
EXTRA MATERIAL ADDED FOR POURING IN COLD WEATHER
Prime Contractor Direct Costs
Additive Costs
A Labor
B Material 3168
C Equipment
D Subtotal of Additive Cost 3168
Deductive Costs(Use parenthesis to denote negative figures)
E Labor
F Material
G Equipment
H Subtotal of Deductive Cost p
I Contractor's Total Direct Cost(D+H) 3168
J General Contractor's Mark-up
K ITotal Prime Contractor Direct Costs+Mark-up(Line I+J) 3168
L Total Subcontractor Direct Costs
M Subcontractor Mark-up
N General Contractor's Mark-up on Subcontractor Direct Costs
0 Total General Contractor Change Request(Lines K+L+M+N) 3168
To the best of my knowledge and belief,I certify that all costs listed above are correct.
Contr for signature Date
Customer Signature Date