Loading...
HomeMy WebLinkAboutSpahn & Rose - C.O. #1-9 - 12/10/2018 f' i � F " CONTRACTOR CHANGE ORDER REQUEST SUMMARY � L Project Name: CITY OF WATERLOO C.O.R.NO: 1 Project NO: Date: 12/5/2018 Prime.Contractor. SPAHN&ROSE LBR' Description of Change: FRED STUTZMAN ATTEMPTED TO SET COLUMNS&BUILDING INSPECTOR WOULD NOT PASSTHE HOLES DUE TOSOILCONDITIONS Prime Contractor Direct Costs Additive Costs A Labor1749 B Material C Equipment D Subtotal of Additive Cost 1749 Deductive Costs(Use parenthesis to denote negative figures) E Labor F Material G Equipment H Subtotal of Deductive Cost 0 1 Contractor's Total Direct Cost(D+H) 1749 1 General Contractor's Mark-up K ITotal Prime Contractor Direct Costs+Mark-up(Line I+1) 1749 L Total Subcontractor Direct Costs M Subcontractor Mark-up N General Contractor's Mark-up on Subcontractor Direct Costs O Total General Contractor Change Request(Lines K+L+M+N) 1749 To the best of my knowledge and belief,I certify that all costs listed above are correct. -5 c5— Customer Signature ) Date x CONTRACTOR CHANGE ORDER REQUEST SUMMARY 3 Project Name: CITY OF WATERLOO C.O.R.NO: 2 Project NO: Date: 12/5/2018 Prime Contractor: SPAHN&ROSE'LBR Description of Change: ROCK FOR AROUND THE POST HOLES Prime Contractor Direct Costs Additive Costs A Labor B Material 603 C Equipment D Subtotal of Additive Cost 603 Deductive Costs(Use parenthesis to denote negative figures) E Labor F Material G Equipment H Subtotal of Deductive Cost 0 I Contractor's Total Direct Cost(D+H) 603 J General Contractor's Mark-up K ITotal Prime Contractor Direct Costs+Mark-up(Line d+J) 603 L Total Subcontractor Direct Costs M Subcontractor Mark-up N General Contractor's Mark-up on Subcontractor Direct Costs 0 Total General Contractor Change Request(Lines K+L+M+N) 603 To the best of my knowledge and belief,I certify that all costs listed above are correct. 600fractorSignature Dafe Customer Signature Date CONTRACTOR CHANGE ORDER RECZUESTrSUMMARY �'. Project Name: CITY OF WATERLOO C.O.R.NO: 3 Project NO: Date: 12/5/2018` Prime"Contractor: SPAHN&ROSE LBR Description of Change: STURDI WALL HARDWARE TO SET POST ON TOP OF THE CONCRETE FOOTING WALLS Prime Contractor Direct Costs Additive Costs A Labor B Material 3012 C Equipment D Subtotal of Additive Cost 3012 Deductive Costs(Use parenthesis to denote negative figures) E Labor F Material G Equipment H Subtotal of Deductive Cost 0 1 Contractor's Total Direct Cost(D+H) 3012 J General Contractor's Mark-up K ITotal Prime Contractor Direct Costs+Mark-up(Line I+J) 3012 L Total Subcontractor Direct Costs M Subcontractor Mark-up N General Contractor's Mark-up on Subcontractor Direct Costs 0 Total General Contractor Change Request(Lines K+L+M+N) 3012 To the best of my knowledge and belief,I certify that all costs listed above are correct. Co4ctorSignature Dat y - - - - Customer Signature Date s ,) CONTRACTOR CHANGE ORDER REQUEST SUMMARY Project Name: CITY'OF WATERLOO C.O.R:NO: 4 Project NO: Dates 12/5/2018 Prime Contractor: SPAHN&ROSE LBR Description of Change: LABOR&CONCRETE TO POUR FOOTINGS'&WALLS Prime Contractor Direct Costs Additive Costs A Labor B Material 26045.25 C Equipment D Subtotal of Additive Cost 26045.25 Deductive Costs(Use parenthesis to denote negative figures) E Labor F Material G Equipment H Subtotal of Deductive Cost 0 I Contractor's Total Direct Cost(D+H) 26045.25 J General Contractor's Mark-up K ITotal Prime Contractor Direct Costs+Mark-up(Une 1+J) 26045.25 L Total Subcontractor Direct Costs M Subcontractor Mark-up N General Contractor's Mark-up on Subcontractor Direct Casts 0 Total General Contractor Change Request(Lines K+L+M+N) 26045.25 To the best of my knowledge and belief,I certify that all costs listed above are correct. Cont ctor Signature Date Customer Signature 1 Date CONTRACTOR CHANGE ORDER REC+,UEST SUMMARY ` Project Name: CITY OF WATERLOO C.O.R.NO: 5 Project NO: Date: 12/5/2018 Prime;Contractor: SPAHN&ROSE LBR Description of Change: 3/0 STEEL WALK DOOR ADDED ON BACKSIDE OF BUILDING' Prime Contractor Direct Costs Additive Costs A Labor B Material 445.32 C Equipment D Subtotal of Additive Cost 445.32 Deductive Costs(Use parenthesis to denote negative figures) E Labor F Material G Equipment H Subtotal of Deductive Cost 0 1 Contractor's Total Direct Cost(D+H) 445.32 1 General Contractor's Mark-up K ITotal Prime Contractor Direct Costs+Mark-up(Une I+J) 445.32 L Total Subcontractor Direct Costs M Subcontractor Mark-up N General Contractor's Mark-up on Subcontractor Direct Costs O Total General Contractor Change Request(Lines K+L+M+N) 445.32 To the best of my knowledge and belief,I certify that all costs listed above are correct. Contra 'or S nature 0 to Customer Signature Date CONTRACTOR CHANGE ORDER REQUEST SUMMARY Project Name: CITY OF WATERLOO C.O.R."N0: 6 Project NO: bate: 12/5/2018 Prime Contractor: SPAHN&ROSE LBR Description of Change: JESUP LAND IMPROVEMENTTO BACKFILL&FURNISHED FILL Prime Contractor Direct Costs Additive Costs A Labor B Material 5354 C Equipment D Subtotal of Additive Cost 5354 Deductive Costs(Use parenthesis to denote negative figures) E Labor F Material G Equipment H Subtotal of Deductive Cost 0 I Contractor's Total Direct Cost(D+H) 5354 J General Contractor's Mark-up K Total Prime Contractor Direct Costs+Mark-up(Line I+J) 5354 L Total Subcontractor Direct Costs M Subcontractor Mark-up N General Contractor's Mark-up on Subcontractor Direct Costs O Total General Contractor Change Request(Lines K+L+M+N) 5354 To the best of my knowledge and belief,I certify that all costs listed above;are correct. Contra(or Signature Da e Customer Signature Date CONTRACTOR CHANGE ORDER REQUESTSUMMARY � '" Project Name: CITY OF WATERLOO C.O.R._NO: 7 Project NO: Date: 12/5/2018 Prime Contractor: SPAHN&'ROSE LBR Description of Change: 12 PCS OF 4"X8"X2"STYROFOAM INSULATION FOR AROUND THE FROST FOOTINGS IN THE OFFICE-&MECHANICAL ROOM Prime Contractor Direct Costs Additive Costs A Labor B Material 359.76 C Equipment D Subtotal of Additive Cost 359.76 Deductive Costs(Use parenthesis to denote negative figures) E Labor F Material G Equipment H Subtotal of Deductive Cost 0 1 Contractor's Total Direct Cost(D+H) 3S9.76 J General Contractor's Mark-up K ITotal Prime Contractor Direct Costs+Mark-up(Line I+J) 359.76 L Total Subcontractor Direct Costs M Subcontractor Mark-up N General Contractor's Mark-up on Subcontractor Direct Costs O Total General Contractor Change Request(Lines K+L+M+N) 359.76 To the best of my knowledge and belief,I certify that all costs listed above are correct. Contr Lor Signature Date Customer Signature Date ri CONTRACTOR CHANGE ORDER REQUEST.SUMMARY Project Name: CITY OF WATERLOO C.O.R.NO: 8 Project NO: Date: 12/5/2018 Prime Contractor: SPAHN&ROSE LBR Description of Change:_ ENGINEERING SERVICES FOR THE FOOTINGS,REQUIRED BY BUILDING INSTPECTOR Prime Contractor Direct Costs Additive Costs A Labor 224 B Material C Equipment D Subtotal of Additive Cost 224 Deductive Costs(Use parenthesis to denote negative figures) E Labor F Material G Equipment H Subtotal of Deductive Cost 0 1 Contractor's Total Direct Cost(D+H) 224 1 General Contractor's Mark-up K ITotal Prime Contractor Direct Costs+Mark-up(Line I+1) 224 L Total Subcontractor Direct Costs M Subcontractor Mark-up N General Contractor's Mark-up on Subcontractor Direct Costs 0 Total General Contractor Change Request(Lines K+L+M+N) 224 To the best of my knowledge and belief,I certify that all costs listed above are correct. rj- Contra&r Signature Date Customer Signature Date CONTRACTOR CHANGE,,ORDER'REQUEST SUMMARY Project Name: CITY OF WATERLOO C.O.R.NO: 9 Project NO Date: 12/5/2018 Prime Contractor: SPAHN`&ROSE LBR Description of Change: CONCRETE FOR THE FOOTINGS EXTRA MATERIAL ADDED FOR POURING IN COLD WEATHER Prime Contractor Direct Costs Additive Costs A Labor B Material 3168 C Equipment D Subtotal of Additive Cost 3168 Deductive Costs(Use parenthesis to denote negative figures) E Labor F Material G Equipment H Subtotal of Deductive Cost p I Contractor's Total Direct Cost(D+H) 3168 J General Contractor's Mark-up K ITotal Prime Contractor Direct Costs+Mark-up(Line I+J) 3168 L Total Subcontractor Direct Costs M Subcontractor Mark-up N General Contractor's Mark-up on Subcontractor Direct Costs 0 Total General Contractor Change Request(Lines K+L+M+N) 3168 To the best of my knowledge and belief,I certify that all costs listed above are correct. Contr for signature Date Customer Signature Date