Loading...
HomeMy WebLinkAboutBoomerang Corp. C.O. #1 - Cont. 880 - 2/4/2019CHANGE ORDER NO. 1 Owner City of Waterloo. Iowa Date January 22, 2019 Project Flow Equalization Facility Overflow Connection t4 Satellite WPCF Owner's Contract No. City Contract No. 880 Contractor Boomerang Corporation Date of Contract Start November 27, 2017 $ 693,700.00 You are directed to make the following changes in the Contract Documents. Description: Contractor to provide labor, materials and equipment necessary to provide water main alterations per the drawing titled "Proposed Modification Water Main Conflict" and dated 12113/18. Materials for this will comply with the American Iron and Steel (AIS) provisions stated within the project SRF requirements. For this change: 1. Materials •.... 0.00..0........... .. $13,450.49 2. Labor 20,000.00 3. Profit and Overhead 5,017.57 4, Increase to Bond ....................................... 769.36 Total ADD .::::::0000. $39,237.42 Reason for Change Order: During excavation for installation of the 24 -inch FEQ Basin Overflow line, it was discovered that there was a conflict of the existing 8 -inch and 12 -inch water lines. This required a design of alterations to the water mains to avoid a conflict with the 24 inch pipe installations. This Change Order will include excavation„ installing new water main materials (including hydrants) for the alterations, thrust blocks, installation of 24 -inch FEQ under adjusted water mains, leak inspection of alterations, backfill and hushing of system. This will require coordination with the City staff and Contractor to ensure minimal downtime to plant operations. CONTRACT PRICE CONTRACT TIMES (Calendar Days) To substantial To final completion completion Original: $693,700.00 Original Completion Date: May 31. 2018 Previous C.O.'s (ADD1DEDUCT) $ This C.O. (ADD/DEDUCT): $3947.42 Contract Price with all approved Change Orders: $732.937.42 REVISED Completion Date: To be Determined It is agreed by the Contractor that this Change Order includes any and alt costs associated with or resulting from the change(s) ordered herein, including all impact, delays, and acceleration costs. Other than the dollar amount and time allowance listed above, there shalt be no further time or dollar compensation as a result of this Change Order. THIS DOCUMENT SHALL BECOME AN AMENDMENT TO THE CONTRACT AND ALL STIPULATIONS AND COVENANTS OF THE CONTRACT SHALL APPLY HERETO. APPROVED: By: OWNER (Authorized Si ACCE ED: By: c Date /-."7-/e uthorized Signature) Date AECOM 60507078 / 1 Project Change Number Order No CAUsersthillernanADocumentatwaterlao - CO 1 - FEQ Overflow 1-16-19 (3).docx AECOM January 16, 2019 Mr. Steve Hoambrecker Waste Management Services 3505 Easton Avenue Waterloo, Iowa 50702 AECOM 501 Sycamore Street Suite 222 Waterloo, Iowa 50703 www.aecom.com Subject: Change Order No. 1 Flow Equalization Facility Overflow Connection to Satellite WPCF Waterloo, Iowa City Contract No. 880 AECOM #60507078 Dear Mr. Hoambrecker: 319-232-6531 tel 319-232-0271 fax Enclosed please find Change Order No. 1 for the above -referenced project. This change order is in regard to an existing conflict of the 8 -inch and 12 -inch water lines, which requires alterations to avoid a conflict with the 24 - inch pipe installations. This Change Order No. 1 covers costs for the excavation, installation of new water main materials (including hydrants) for the alterations, thrust blocks, installation of 24 -inch FEQ under the adjusted water mains, leak inspection of alterations, backfill and flushing of the system. Coordination between City staff and the contractor is required to ensure minimal downtime to plant operations. It is recommended to move forward with this Change Order No. 1 in the amount of $39,237.42. If you have any questions or need additional information, please let us know. Thank you. Yours sincerely, Ross A. Hillsman, PE Enclosure: As Noted c: Boomerang Corporation P:160507078\600_Construction_Support1670_Change-Orders\2019-01-16 Tmsmtl to SH - CO #1 docx