HomeMy WebLinkAboutFailor Hurley Construction - Final Quantity Summary - 2018 Restroom Renovation project - 3/4/19!AIAa� Document G7O4TM Certificate of Substantial Completion PROJECT: (Name and address) 17113 Waterloo Center for the Arts 2018 Toilet Renovation 225 Commercial Street Waterloo, IA 50701 TO OWNER: (Name and address) City of Waterloo 715 Mulberry Street Waterloo, IA 50703 PROJECT NUMBER: 17113/ CONTRACT FOR: General Construction CONTRACT DATE: April 10, 2018 TO CONTRACTOR: (Name and address) Failor Hurley Construction 3337 Mamie Ave Waterloo, IA 50701 2000 PROJECT OR PORTION OF THE PROJECT DESIGNATED FOR PARTIAL OCCUPANCY OR USE SHALL INCLUDE: OWNER: 5 ARCHITECT: ❑ CONTRACTOR: ❑ FIELD: ❑ OTHER: ❑ The Work performed under this Contract has been reviewed and found, to the Architect's best knowledge, information and belief, to be substantially complete. Substantial Completion is the stage in the progress of the Work when the Work or designated portion is sufficiently complete in accordance with the Contract Documents so that the Owner can occupy or utilize the Work for its intended use. The date of Substantial Completion of the Project or portion designated above is the date of issuance established by this Certificate, which is also the date of commencement of applicable warranties required by the Contract Documents, except as stated below: Warranty INVISION Architecture, LTD ARCHITECT Date of Commencement September 14, 2018 DATE OF ISSUANCE A list of items to be completed or corrected is attached hereto. The failure to include any items on such list does not alter the responsibility of the Contractor to complete all Work in accordance with the Contract Documents. Unless otherwise agreed to in writing, the date of commencement of warranties for items on the attached list will be the date of issuance of the final Certificate of Payment or the date of final payment. Cost estimate of Work that is incomplete or defective: $o.00 The Contractor will complete or correct the Work on the list of items attached hereto within thirty (30) days from the above date of Substantial Completion. Failor Hurley Construction CONTRACTOR BY DATE ii /3 J1& The Owner accepts the Work or designated portion as substantially complete and will assume full possession at 5:00 (time) on September 14, 2018 (date). City of Waterloo ri't� 3 /`/ OWNER BY DATE The responsibilities of the Owner and Contractor for security, maintenance, heat, utilities, damage to the Work and insurance shall be as follows: (Note: Owner's and Contractor's legal and insurance counsel should determine and review insurance requirements and coverage.) Both Owner and Contractor to carry such insurance as will protect them for the occupancy and work remaining to be completed. AIA Document G704T® — 2000. Copyright ® 1963, 1978, 1992 and 2000 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 15:26:11 on 09/19/2018 under Order No. 2215063383 which expires on 06/27/2019, and is not for resale. User Notes: (3B9ADA22) PUNCH LIST Project: Waterloo Center for the Arts 2018 Toilet Room Renovation Project#: 17113 Inspection Date 9.10.2018 This punchlist indicates observed items to be corrected or completed in compliance with the Construction Documents. This list is not all-inclusive and does not alleviate the Contractor from correcting and completing items which may have been overlooked and which are required to provide a complete building. Please proceed immediately as specified in the Construction Documents to fully complete the work and correct the items listed. Please indicate by placing your initials in the "corrected" column after each item that has been completed and forward a copy of the initialed list to us. We wit then arrange for a final review for acceptance of the work. Name Roland Ganter Angie Nees Jake Connor Bill Failor Todd Borwig Company INVISION INVISION MODUS Failor-Hurley Failor-Hurley Attendance Phone Email 319.233-8419 rolandgtu�invisionarch.com 319.233-8420 angien(a�invisionarch.com Room Number(Const Punchlist item Corrected Accepted 1 General Note 2 General Note 3 General Note 4 General Note 5 General Note 6 General Note 7 8 108 Reception 9 10 11 12 13 14 15 16 106 Reception Storac Add rubber base 17 Move light switch/outlet into theater shop space as discussed Final cleaning to be completed Touch up walls, marks and paint — some areas are marked with blue tape, instances are typically not noted separately on the specific punch list items. All Wall and Floor Tile: There are many sports of where grout is missing. This includes many grout voids in the accents tile, as well as inconsistent grout depth at the large wall tile grout. Fill all voids and provide consistent joints. Replace tiles that, are obviously installed out of plane. Clean grout. Thoroughly all wall and floor tile of any contamination including grout residue and dirty or hard water residue in all tiled rooms Clean all stainless steel sinks. Clean all Faucets, Toilet Valves Clean all Schluter trim off grout Acid Clean Floor and Brick Base Install floor tile at old water supply location Install grommets in desk, coordinate exact location with owner Add missing light above desk Adjust light track to be perfectly level Can something be done so curvature is more continuous at track splices? It would have been better to get 12' lengths of track to minimize splices. Add rubber base at inside of desk 18 19 101 Storage 20 21 22 23 102 Family Toilet Add rubber base Add flange at duct penetration Paint J -box Straighten diffuser 1 of 2 24 Outside corners of quartz counter look unfinished. Polish or fill as need to create clean corner. 25 26 109 Alcove Add men/women stencil signs 27 Coordinate installation of code required braille signage with owner 28 Change device plate in wood wall to stainless steel plate 29 30 107 Corridor Paint the block course above sheetrock to match the white wall color. 31 Replace ivory colored device 32 Touch up paint above corner guard 33 34 104 Women Seal at top of wall tile at joint with ceiling. 35 Glue on end caps of cove light to sit flush. Straighten out cover light diffusers to align at seams. 36 37 103 Men Seal at top of wall tile at joint with ceiling. 38 Glue on end caps of cove light to sit flush. Straighten out cover light diffusers to align at seams. 39 Replace white cover plate near urinals with steel plate 40 41 Foyer Repaint existing door & frame to storage 106 as noted on elevation drawings. 42 Touch up overpaint on wall below upstairs display case, across from reception desk. Seal joint between existing drywall fascia and new wall below where there is a visible uneven gap. 43 44 Toilet Rooms on 2nd General notes about tile and cleaning apply to both restrooms upstairs. 45 46 Basement 47 48 49 Take signage off wall next to elevator door. Paint over elevator button plates to match wall color/make them disappear.