Loading...
HomeMy WebLinkAboutPrice Industrial Electric, Inc.- Change Order #2 STP-A-8155(743)--86-07&101A/ADOT Form 031240 (01-18) Please return Oils copy to: City Clerk & Finance Dept. 715 Mulberry St. Waterloo, IA 50703 CHANGE ORDER For Local Public Agency Projects No.: Two Non -Substantial: Substantial: Administering Office Concurrence Date Accounting ID No. (5 -digit nurnber):35218 Project Number: STP -A-8155(743)--86-07 Contract Work Type: Traffic Signals Local Public Agency: City of Waterloo Contractor:Price Industrial Electric Inc. Date Prepared: November 28, 2018 You are hereby authorized to make the following changes to the contract documents. A - Description of change to be made: 0100, Handhole, Type III - Add one (I) handhole for quantity overrun and five (5) handholes required for replacement of existing 96 count fiber along West 4th Street from Kimball Avenue to Grant Avenue. (NS) 0140, Conduit, 2 In. HDPE - Delete 472 linear feet (NS) 0150 and 0170, Fiber - Quantity overrun (NS) 8001, Conduit, 2 In. HDPE - Add 4,938 linear feet at $13.68/linear foot (472 LF in original contract, 566 LF quantity overrun and 3900 LF along West 4th St.) (S) 8002, and 8003, Tracer Wire and Pull Rope - Existing conduits did not have tracer wire or pull ropes and needed to be added (NS) 8004, Extra Pull Rope - Add pull rope for future cable pulls (NS) 8005, Fiber - 96 CT SM - Additional fiber required to replaced damaged existing 96 count fiber along West 4th Street (NS) 8006, Additional Excavation - Additional excavation to address unforeseen conditions (NS) 8 - Reason for change: 0100, 0150 and 0170 - Quantity Overruns 0140, 8001 - Large increase in quantity has resulted in a decrease in the unit price 8002, 8003, 8004 - Existing conduits did not contain any pull rope or tracer wire 0100, 8001, 8002, 8004, 8005 - Existing 96 count fiber and conduit on West 4th Street from Kimball Avenue to Grant Avenue has been damaged and does not have continuity and needs to be replaced. 8006, Additional Excavation - Hand holes were buried and needed to be exposed with unforeseen HDPE run added to tie in hand holes. 5th and Bayard intersection hand hole was installed over 3" raceway that didn't connect as plans indicated, therefore additional raceway was required. Buried hand hole.had to be uncovered at Hawkeye and San Marnan. c - Settlement for cost(s) of change as follows with items addressed in Sections F and/or G: 0100, 0150, 0170 - No adjustment in the contract unit price 8001 - Proposed cost is $13.68/linear foot, a reduction of $6.32/1inear foot. 8002 - Tracer Wire - Proposed cost is $0.6709553/linear foot 8003 - Pull Rope - Proposed cost is $0.998119/linear foot 8004 - Extra Pull Rope - Proposed cost is $0.246765/linear foot 8005 - Fiber - 96 CT SM - Proposed cost is $2 75/linear foot 8006 - Additional Excavation - Proposed cost is a lump sum of $3,768.75. D - Justification for cost(s) (See I.M. 3.805, Attachment D, Chapter 2.36, for acceptable justification): 0100,0150, 0170 - Contract Unit Prices 8001 - Reduction in cost is warranted because of the increase in the total quantity of the conduit from 472 linear feet to 4,938 linear feet. 8002, 8003, 8004 - Proposed costs are considered reasonable to place tracer wire and pull ropes within existing conduits. 8005 - Proposed unit price for 96 count fiber is the same as the contract unit price for 72 count fiber. 8006 - Proposed lump sum cost includes 31 hours of labor and 3 hours of a mini -excavator plus additional supplies and is considered reasonable for the amount of work required. Page 1 of 4 E - Contract time adjustment: U No Working Days added 11 Working Days added: Justification for selection: A total of 30 additional working days is required to complete the work proposed to be added to the contract. The additional working days would increase the contract period from 55 working days to 85 working days. Accounting ID No.(5-digit number): Change Order No.:Two (2) Unknown at this time Page 2 of 4 C4IOWADOT Form 831240 (01-18) F - Items included in contract: Accounting ID No.(5-digit number):35218 Change Order No.:Two (2) G - Items not included in contract: Participating For deductions enter as "-x xx" Federal- aid State- aid Line Number Item Description Unit Price xx Quantity xxx Amount xx X Amount .xx 0100 Handhole, Type 111 $1,000.00 6.000 $6,000.00 X 4,938.000 0140 Conduit, 2 In. HDPE -$20.00 472.000 -$9,440.00 X $0.67 0150 Fiber -12 CI- SM $0.00 283.000 $0.00 X 2599-9999009 0170 Fiber - 72 CT SM $0.00 718.000 $0.00 X 8004 2599-9999009 Extra Pull Rope $0 25 17,181.000 $4,239 67 X 8005 2599-9999009 Fiber -96 CT SM $2.75 4,600.000 $12,650.00 X 8006 2599-9999010 Additional Excavation $3,768.75 1.000 $3,768.75 Add Row Delete Row TOTAL -$3,440.00 G - Items not included in contract: Page 3 of 4 Participating For deductions enter as Federal- aid State- aid Change Number Item Number Item Description Unit Price .xx Quantity .xxx Amount .xx X 8001 2599-9999009 Conduit, 21n. HDPE $13.68 4,938.000 $67,551.84 X 8002 2599-9999009 Tracer Wire $0.67 16,183.000 $10,858.07 X 8003 2599-9999009 Pull Rope $1.00 17,181.000 $17,148.68 X 8004 2599-9999009 Extra Pull Rope $0 25 17,181.000 $4,239 67 X 8005 2599-9999009 Fiber -96 CT SM $2.75 4,600.000 $12,650.00 X 8006 2599-9999010 Additional Excavation $3,768.75 1.000 $3,768.75 Page 3 of 4 Federal- aid State- aid Change Number Item Number Item Description U gebb ¢ung "xx D NO)(fawdtitynum3er):11CR3i}tt xxx ChannOiJetVe..Two(2) 115,965.79 115,858.472404 116,217.0116239 116,217.0116239 Add Row TOTAL $116,217.01 I Delete Row 1 H. Signatures Agreed: Recommended: Approved: Person in Responsible Charge Contracting Authority (optional) 091j -l1 Date Date 2710 ij1 Date Other (optional) Title Date Date Other (optional) Title Date Iowa DO 1 Administering Office Dale Approval is contingent upon funds being available under the existing project agreement or upon additional Federal -aid funds being made available by a modified project agreement. FH WA Concurrence: Federal Highway Division Administration Date (if required) DISTRIBUTION (after fully executed on LPA projects): Original - Finance; Copies - Contractor, Project Engineer, Contracting Authority, Administering Office. Date distributed: Initials: Page 4 of 4 Project: Project No.: Contractor: Waterloo Adaptive Traffic Signals & Fiber Optics Communications STP -A-8155(743)--86-07 Price Electric Change Order No. 2 Unit Price Calculations Item Units Est. Qty. Unit Cost Total Price Item No.: 8002 - Tracer Wire Pull Rope LF 16183 $0.290 $ 4,693.07 Labor Supervisor Hour 45 $75.00 $ 3,375.00 Journeyman Hour 45 $62.00 $ 2,790.00 Total $ 10,858.07 Unit Cost 50.6709553 Item No.: 8003 - Pull Rope Pull Rope LF 17181 $0.175 $ 3,006 68 Labor Hour 46 $ $75.00 3,450.00 Supervisor Journeyman Hour 46 $62.00 $ 2,852.00 Laborers Hour 120 $50.00 $ 6,000.00 Additional Trucks with/Rodder Hour 92 $20.00 $ 1,840.00 Total $ 17,148.68 Unit Cost $0.998119 Item No.: 8004 - Extra Pull Rope Pull Rope LF 17181 $0.175 $ 3,006.68 Labor u + $75.00 N $ 300.00 Supervisor Hour 4 Journeyman Hour 4 $62.00 $ 248.00 Laborers Hour 10.5 $50.00 $ 525 00 Additional Trucks with/Rodder Hour 8 $20.00 $ 160.00 Total $ 4,239 68 Unit Cost $0.246765 Item No.: 8006 - Additional Excavation 2 -inch Dia. Sch 80 PVC LF 70 $1.30 $ 91.00 2 -inch Dia. PVC Couplings EA 8 $1.70 $ 13.60 2 -inch Dia. PVC 90 degree EA 2 $15.00 $ 30.00 PVC Glue Quart EA 1 $15.15 $ 15.15 Labor..n.r. i Excavator Operator Hour 25 $75.00 $ 1,875.00 Laborers Hour 16.5 $50.00 $ 825.00 Mini -Excavator Rental LS 1 $919.00 $ 919.00 Total $ 3,768.75 Lump Sum Cost $3,768.75