Loading...
HomeMy WebLinkAboutPirc-Tobin Construction - C.O. #3 - 3/18/19CITY OF WATERLOO, IOWA CHANGE or EXTRA WORK ORDER NO. 3 PROJECT: F.Y. 2019 Brock 3rd Addition Sanitary Sewer Extension, CONTRACT NO. 954 Date Prepared: March 05, 2019 AMOUNT: $ 58,031.84 Increase TO: Pirc-Tobin Construction, Inc. Contractor You are hereby ordered to make the following changes from the plans and specifications or perform the following extra work on your contract dated August 6, 2018. A. Description of change to be made or extra work to be done: 1. Provide, install, operate and maintain additional dewatering equipment, labor and materials to lower the groundwater at the bored sewer crossing area under US Highway 63 (Sergeant Road) as necessary to complete this bored and cased crossing and subsequently remove said equipment and materials and restore the disturbed area to pre -construction conditions. B. Reason for ordering change or extra work: 1. Excessive rainfall and flooding raised the groundwater level for an extended period. C. Settlement for cost of work to be made as follows: 1. A lump sum of + $58,031.84 Total Net Increase $ 58,031.84 CITY OF VVAT E R LOO PIRC-TOBIN CONSTRUCTION, INC. (CONTRACTOR) BY:1,intF.'/te. ($ ,,i BY: �— i7UrAci, 0700Quentin Hart, Mayor Date Date ATTEST: BY: Kelley, 8'8 161 Ichle, City Clerk Date CITY ENGINEER /3 PRINTED n NAME: rG• ) J. 7Lin TITLE: PMdq--ykr WAYNE CLAASSEN ENGINEERING & SU VEYING, INC. By: d 3///'ZO Jamie Knutson, PE, ate William J(C,I'aassen, PE Date (File: My Documents/Change Order/MASTER)