Loading...
HomeMy WebLinkAboutShive-Hattery - Supplemental Agmnt #1 - 5/6/2019Contract No. 2182080 Owner Project No. TOF-284-R Iowa DOT Project No. STP -U-8155(755)--70-07 Standard Consultant Contract For Local Public Agency Consultant Contracts with Federal -aid Participation Supplemental Agreement No. 1 This SUPPLEMENTAL AGREEMENT NO. 1, made as of the date of the last party's signature below, is by and BETWEEN City of Waterloo, Iowa, the Owner, located at: 625 Glenwood Street Waterloo, Iowa 50703 Phone: (319) 291-4440 FAX: (319) 291-4094 and Shive-Hattery, Inc., the Consultant, located at: 316 2nd Street SE Cedar Rapids, Iowa 52403 Phone: (319) 364-0227 FAX: (319) 364-4251 For the following Project: City of Waterloo Traffic Control Center Remodel Project. The Owner and Consultant entered into an agreement executed September 6, 2019 for Preliminary Engineering Services, in which the Consultant agreed to provide professional design and engineering services, to assist with the development of design. Per an email from Iowa DOT — dated January 3, 2019 at 01:24PM — Iowa DOT informed the project will now be locally let instead of being let by the Iowa DOT. This amendment is to modify our original agreement to incorporate limited Letting Services. Now therefore, the Owner and Consultant request to amend the contract value of the original agreement, based upon a change in the anticipated scope of services. 6/itlfiR TABLE OF CONTENTS Article Number And Description 1 Initial Information 1.2 Financial Parameters 1.4 Time Parameters Attachment SA -A - Scope of Services Attachment SA -B - Specifications Attachment SA -C - Fees and Payments Attachment SA -C-1 - Cost Analysis Worksheet ARTICLE 1 INITIAL INFORMATION This SUPPLEMENTAL AGREEMENT NO. 1 is based an the following information and assumptions. 1.2 Financial Parameters 1.2.1 Amount of the Owner's budget for the Consultant's compensation under this SUPPLEMENTAL AGREEMENT is: 1. Preliminary Engineering (PE) to increase by $4,572.00 from $12,977.00 to $17,549 Note: ■ PE 'To Increase By' — $4,572.00— is related to the increase in Preliminary Engineering Scope of Services as described in SA -A, the adjustment of wage rates to be reflective of 2019 (in lieu of 2018) and the costs of reimbursable expenses related to printing the documents (see SA -C-1 for details). 1.4 Time Parameters 1.4.1 The Consultant shall begin work under this Agreement upon receipt of a written notice to proceed from the Owner. 1.4.2 Milestones for completion of the work under this Agreement as follows: 1. Completion of all work under this agreement shall be on or before December' 31, 2019 unless extended by written approval of the Contract Administrator or adjusted by supplemental agreement. The original completion date was on or before December 31, 2018. The reason for the schedule extension is related to the timeframe it took to receive approval to let the project locally. Additionally, the professional services previously included only design phase services and now have been increased to include services through construction engineering as described within this Supplemental Agreement. IN WITNESS WHEREOF, the parties hereto have caused this Agreement to be executed by their proper officials thereunto duly authorized as of the dates below. Shive-Hattery, In B Jord _ l reyer Proj _ anager City of Waterloo Date: 61 - 30 —1 1 Date: o4I?1101\ By k- Date: -CL !a IOWA DEPARTMENT OF TRANSPORTATION Accepted for FHWA Authorization* By ) Date: (L' 6 -29/9 Name UMO /44 At x1Y Title P! /�G%�/ R / Yi f ��f "' ;-i o x1,44 * The Iowa DOT is not a party to this agreement. However, by signing this agreement, the Iowa DOT is indicating the work proposed under this Agreement is acceptable for FHWA authorization of Federal funds. ATTACHMENT SA -A Scope of Services Scope of Services have been amended to include the following items. Preliminary Engineering E Local Letting E.01 Answer Contractor and Client Questions Receive and respond to questions through the bid advertisement period up to the letting date. E.02 Prepare and Issue Addenda, If Necessary Document changes to the design through updating the Construction Documents and issuing addenda. ATTACHMENT SA -B Specifications Plans and specifications per Public Bidding Laws for the City of Waterloo Traffic Control Center Remodel Project. A digital copy of the plans and specifications will be provided in pdf format. ATTACHMENT SA -C Lump Sum 3.1.1 FEES AND PAYMENTS 3.1.1.1 Fees. For full and complete compensation for all work, materials, and services furnished under the terms of this Agreement, the Consultant shall be paid fees on a lump sum basis and payment of this amount shall be considered as full and complete compensation for all work, materials and services furnished under the terms of this Agreement. The lump sum amount shall be $ 4.572.00. The estimated staff hours and fees are shown in Attachment SA -C-1. The lump sum amount will not be changed unless there is a substantial change in the magnitude, scope, character, or complexity of the services from those covered in this Agreement. Any change in the lump sum amount will be by Supplemental Agreement. 3.1.1.2 Reimbursable Costs. Reimbursement of costs is limited to those that are attributable to the specific work covered by this Agreement and allowable under the provisions of the Code of Federal Regulations (CFR), Title 48, Federal Acquisition Regulation System, Subchapter E., Part 30 (when applicable), and Part 31, Section 31.105 and Subpart 31.2. In addition to Title 48 requirements, for meals to be eligible for reimbursement, an overnight stay will be required. 3.1.1.3 Premium Overtime Pay. Not applicable. 3.1.1.4 Payments. Monthly payments for work completed shall be based on the percentage of work completed and substantiated by monthly progress reports. The Contract Administrator will check such progress reports and payment will be made for the proportional amount of the lump sum fee. The Owner shall retain from each monthly payment for construction inspection or construction administration services 0% of the amount due. Invoices shall clearly identify the beginning and ending dates of the prime's and subconsultant's billing cycles. All direct and indirect costs incurred during the billing cycle shall be invoiced. Costs incurred from prior billing cycles and previously not billed, will not be allowed for reimbursement unless approved by the Contract Administrator. Upon completion, delivery, and acceptance of all work contemplated under this Agreement, the Consultant shall submit one complete invoice statement for the balance of the lump sum fee. Payment of 100% of the total cost claimed, inclusive of retainage, if applicable, will be made upon receipt and review of such claim. The Consultant agrees to reimburse the Ownerfor possible overpayment determined by final audit. Page7of7 ATTACHMENT C-1 Cost Analysis Worksheet Contract No. 2082080, Supplemental Agreement No. 1 Iowa DOT Project No. STP -U-8155(755)--70-07 I. Direct Labor Cost (Prime Only) Category Hours Rate/Hour Amount Project Manager 1.00 50.00 $ 50.00 Office Assistant 1.00 27.25 $ 27.25 Project Leader 0.00 49.28 $ - Architect 4.00 50.00 $ 200.00 Interior Designer 8.00 17,79 $ 142.32 Electrical Engineer 2.00 48.56 $ 97.12 Electrical Designer 2.00 35.58 $ 71.16 Payroll Total: $ 588 IL Combined Overhead (COH) & Facilities Capital Cost of Money (FCCM) Costs (Prime Only) HA. Indirect Cost Factor: ( 170.56% X I) $ 1,002.64 III. Direct Project Expenses (Prime Only) Phone/Fax Travel Reproductions Postage 242.85 2,500.00 Combined Overhead total: 445.60 miles @ 0.545 Total Direct Project Expenses: IV. Estimated Actual Costs (EAC) (Prime Only) (I+ II + 111) V. Fixed Fee (Prime Only) ( 15% X (I + IIA)) $ 238.57 Fix Fee Total: $ 1,003 $ 2,742.85 $ 4,333 (Rounded) $ 239 VI. Contingency (Prime Only) 0% X (I + 0 + III) $ VII. Subconsultant Expenses (Designage if Cost Plus Fixed Fee (CP), Lump Sum (LS), etc. and include appropriate number of Attachment "I's" as necessary) No Subconsultants Total Subcontractor Costs: $ (Rounded) (Rounded) (Rounded) VIII. Lump Sum Agreement Total (IV + V + VI + VII) $ 4,572 (Rounded)