Loading...
HomeMy WebLinkAboutPeterson Contractors, Inc. - FY 19 Cattle Congress Sanitary Sewer Force Main Emergency Bypass RepairCITY OF WATERLOO, IOWA ENGINEERING DEPARTMENT 715 Mulberry St. • Waterloo, IA 50703 • Phone (319) 291-4312 Fax (319) 291-4262 City Engineer • email: city.engineer`a)watcrloo-ia.org May 21, 2019 Chris Fleshner Peterson Contracting, Inc. 104 Black Hawk Street PO Box A Reinbeck, IA 50669 RE: FY 2019 Cattle Congress Sanitary Sewer Force Main Emergency Bypass Repair Dear Chris: This letter serves as your "Notice to Proceed" with construction under the FY 2019 Cattle Congress Sanitary Sewer Force Main Emergency Bypass Repair effective Tuesday, May 21, 2019. As this project is to effect emergency repairs to a leaking sanitary sewer, time is of the essence. Please proceed with ordering the necessary materials immediately. Sincerely, fri/ Wayne Castle, PLS, PE Associate Engineer cc: Jamie Knutson, PE, City Engineer Dennis Gentz, PE, Assistant City Engineer Steve Hoambrecker, PE, Waste Management Pauline Closson, Engineering Clerk Doug Schindel, PE, AECOM Technical Services Michelle Sweeney, PE, AECOM Technical Services WE'RE WORKING FOR YOU! An Equal Opportunity/Affirmative Action Employer FORM OF BID OR PROPOSAL F.Y. 2019 CATTLE CONGRESS SANITARY SEWER FORCE MAIN EMERGENCY BYPASS REPAIR CITY OF WATERLOO, IOWA Honorable Mayor and City Council Waterloo, Iowa 1. The undersigned, being a Corporation existing under the laws of the State of Iowa , a Partnership consisting of the following partners: , having familiarized (himself) (themselves) (itself) with the existing conditions on the project area affecting the cost of the work, and with the General Specifications and Project Specifications, hereby proposes to furnish all supervision, technical personnel, labor, materials, machinery, tools, appurtenances, equipment, and services, including utility and transportation services required to construct and complete this F.Y. 2019 CATTLE CONGRESS SANITARY SEWER FORCE MAIN EMERGENCY BYPASS REPAIR, all in accordance with the General Specifications and Project Specifications and for the unit prices for work in place for the following items: BID ITEM SUDAS SECTION DESCRIPTION UNIT EST QTY UNIT BID PRICE TOTAL BID PRICE 1 4010, 1.08, C DUCTILE IRON PIPE (DIP), 10 IN, INTEGRAL RESTRAINED JOINTS LF 227 2 5010, 1.08, C, 1 FITTINGS BY COUNT, DUCTILE IRON, 10 IN X 12 IN, REDUCER EACH 2 3 5010, 1.08, C, 1 FITTINGS BY COUNT, DUCTILE IRON, 10 IN, 90° ELBOW EACH 8 4 HIGH PRESSURE HOSE, 12 IN LF 600 5 BYPASS CONNECTION LS 1 6 ONE MONTH EXTENSION EACH 1 Please see the attached Itemized Cost Report for Unit Prices. SUBMITTED BY: Peterson Contractors, Inc. SIGNED BY: (Bidder) 104 Black Hawk St., P.O. Box A TOTAL BID $262,420.00 Contractor's Estimated Completion Date for Bypass Connection: May 21 Reinbeck, IA 50669 C,2 Project Estimator 5-21-19 (Title) ACCEPTED BY CITY OF WATERLOO: SIGNED BY: z2,44.-44...--,./6 (Date) (Title) BID PROPOSAL ( ate) ,2019. F.Y. 2019 CATTLE CONGRESS SANITARY SEWER PAGE 1 OF 1 FORCE MAIN EMERGENCY BYPASS REPAIR www.petersoncontractors.com PETERSON CONTRACTORS, INC. 104 Blackhawk Street P.O. BoxA Reinbeck, Iowa 50669 Phone: 319-345-2713 Fax: 319-345-2991 QUOTE PROPOSAL FOR: Cattle Congress Sanitary Sewer Force Main Emergency Bypass Repair 2019 SPECIAL PROVISIONS: 1. Please refer questions to Chris Fleshner at (319) 415-5212. 2. PCI will be using HPDE Rigid Pipe for the High Pressure Hose Item. PCI plans on Salvaging this pipe for future use. 3. PCI assumes the maintenance of the pipe. If the pipe is damaged due to vandalism PCI will expect payment from the Contracting Authority for this repair on a T & M Basis. 4. PCI excludes all Engineering Surveying & Soils Testing. 5. PCI assumes a minor amount of loss during the By Pass Operation is acceptable. 6. PCI will Pump and Haul the By Pass material at the Cattle Congress Lift Station. The City will Pump and PCI will Haul at the Hackett St. Lift Station. 7. PCI is providing a Tee and Valves for future By Passing for the Permanent situation. This is per the engineer. 8. PCI will use Certa LOK for item #1. 9. PCI expects that the City will work with us to reduce the flow of water as much as possible by contacting major users and requesting shut downs during the By Pass Connection. THE FOLLOWING ITEMS AND PRICES ARE QUOTED: ITEM # DESCRIPTION 1 10" RESTRAINED PIPE 2 10" X 12" REDUCER FITTINGS 3 10" ELBOWS 4 HIGH PRESSURE HOSE 5 BY PASS CONNECTION 6 MONTHLY EXTENSION 7 10" X 10" TEE 8 10" VALVE TOTAL QUOTED AMOUNT PETERSON CONTRACTORS, INC. Chris D. Fleshner Digitally signed by Chris D. Fleshner DN: cn=Chris D. Fleshner, o=Peterson Contractors, Inc., ou, email=cfleshner@pcius.com, c=US Date: 2019.05.21 15:04:45 -05'00' May 21,2019 UNIT TYPE LF EA EA LF LS EA EA EA QUANTITY 227.000 2.000 8.000 600.000 1.000 1.000 2.000 4.000 UNIT PRICE $360.00 $2,250.00 $3,500.00 $62.00 $73,000.00 $6,000.00 $3,000.00 $6,500.00 TOTAL AMOUNT $81,720.00 $4,500.00 $28,000.00 $37,200.00 $73,000.00 $6,000.00 $6,000.00 $26,000.00 $262,420.00