Loading...
HomeMy WebLinkAboutBoulder Contracting, LLC - C.O. #4 - 6/10/19OWIF r City of Waterloo 0j,-ir. FY 2019 Bridge Repairs CHANGE ORDER NO. 4 Date: lune 6, 2019 osvner's Cunttact ter 959 Contractor Boulder Contracting. LLC te of Contact Start May 1, 2019 Contract Amount: $ 334,269.00 act, are directed to make the fo lowang chargers in the Contract Dor urnents. Description 4 1 Add ItPrn: 44001; Shallow Derr( Repairs 4-2 Add Item 44001, Regular Deck Rebairr, 4 3 Add rtem, 44J07, P.egrilar Deck Repaas with VON! & Anchor 4-4 Add item. #4004 rrrar k Avenue Bridge Deck Repairs Mobilization 101AI AM. -ill -IONS Rvd$Cn for Change Order the Engineering Department was recenty notified of a concrete deter icraticen issue of the Park Avecrict tr-dge .tenr reriew toy frigiticorna, ACCOM staff noticed approximately 10 locations witt various stages of the same concrete rasa o rArnile trrot.,* tktir slaTed f0,t N'tr t replacement is strIl sever ar pia 5 away and (my staff would like to ensure that the berrige deckr ran; r it r tr-;0 ' I t 0,!-1 Coottactur revrewert the croposed repri r with AECOM staff and provided the unit prices based LrPre csr rt,rite reharrk lat raw The rtr: riot to be mace In accordance with Sectior 2420 of trie Iowa DOT Specifications. The Contractor estimates rept r ra take 7 ccs' days t cry—triere Park Avenue bridge will be closed to all tratt,c during the repairs with the WaterrOo Street lep:ftrnent tt ;0 aro! 4-1 Shadow Deck Repairs are est:mated a'. 150 SF with a dna price of 5142/SE 4 2 'Regular Peck Repairs are estimated at 50 SF with a unit price of S133iSF 3 Regular 1)e e pa r s wat, WW1 Anchors are estimated at 50 SF with a unit price uf 5742/Sr: 4 4 Park Acitotre Bridge Deck Repairs Mohrlicatern is a I unip Sum item with a unit price of tr.2,30,71 S 21300 00 5 1: ,0,150 Ofr 12 10000 S 2 303.00 5 4 (-OW riALT1 PRIO- Ortgiral Previous L.O.s (ADD/DEDUCT) This 0 (1 (ADD/DEDUCT) Contract Price with all approved Charge Orders: 5 334,269.00 Original coeltaation Date: 5 12,025,00 1Ncrking, Days Added: 5 41,350.00 Revised Corripletror, Date: 5 393,644.00 CONTRACT TMC ,Ornpie,IOn f:inttt Curnpletror It grind by Iho Contractor that this Change Order includes any and all costs associated wilt Of rry.JITing from the charger ir orderer; hetatir, :t'c'udati di frpda delays dOO deceleration costs Other than the dollar amount and time alrowarcr atrove. tnert, 0,11 he no fGrttrel .74 dollar rumpenrarron aS. result of trer. Change Order I HIS DOCUMENT SrIALL BECOME AN AMENDMENT TO THE CONTRACT AND A t STIPULA DONS AND COVFNAN IS 01 Thb CON IRA( I SrlAl I AP't.t l,FR[ TO APPRO D: Owner Author; tore? ACCEPTED' ontrac r -AJthOIZCd SagnatLrie) ACCEPTED. 0'0 AECO te Date acom 6,05131804 4 Project No. C.O. No