HomeMy WebLinkAboutPeterson Contractors, CO#1 - FY19 Cattle Congress Sanitary Sewer Main Repair Cont No. 985 - 6/17/19CHANGE ORDER NO. 1 Owner City of Waterloo Date: 6/11/2019 Project FY19 Cattle Congress Sanitary Sewer Force Main Repair 0-8238 Owner's Contract No. Contract No. 985 Contractor: Peterson Contractors, Inc. Date of Contact Start 5/21/2019 Contract Amount: $ 262,420.00 You are directed to make the following changes in the Contract Documents, Description: 1 DIP, 10 IN, INTEGRAL RESTRAINED JOINTS $ 360.00 /LF x -227 LF $ (81,720.00) 2 FITTINGS, DUCTILE IRON, 10" X 12", REDUCER $ 2,250.00 /EA x -2 EA $ (4,500.00) 3 FITTINGS, DUCTILE IRON, 10 IN, 90' ELBOW $ 3,500.00 /EA x -8 EA $ (28,000.00) 4 HIGH PRESSURE HOSE, 12 IN $ 62.00 /LF x -600 LF $ (37,200.00) 5 BYPASS CONNECTION $ 73,000.00 /LS x -1 LS $ (73,000.00) 6 ONE MONTH EXTENSION $ 6,000.00 /EA x -1 EA $ (6,000.00) 7 FITTINGS, DUCTILE IRON, 10" X 10", TEE $ 3,000.00 /EA x -2 EA $ (6,000.00) 8 FITTINGS, DUCTILE IRON, 10" VALVE $ 6,500.00 /EA x -4 EA $ (26,000.00) 1-1 Mobilization $ 27,500.00 /15 x 1 LS $ 27,500.00 1-2 Traffic Control $ 2,500.00 /LS x 1 LS $ 2,500.00 1-3 Topsoil, Strip & Respread $ 12.50 /CY x 265 CY $ 3,312.50 1-4 Suitable Backfill Material for Levee (Off-site) $ 17.50 /CY x 2907 CY $ 50,872.50 1-5 Stockpile & Removal of Existing Material $ 12.50 /CY x 2907 CY $ 36,337.50 1-6 Pipe Removal & Abandonment $ 20.00 /LF x 310 LF $ 6,200.00 1-7 10 -Inch Sanitary Sewer PVC Force Main $ 100.00 /LF x 223.2 LF $ 22,320.00 1-8 10 -Inch Sanitary Sewer DIP Force Main $ 125.00 /LF x 124.4 IF $ 15,550.00 1-9 10 -Inch 11-1/4 Degree Bend $ 3,500.00 /EA x 1 EA $ 3,500.00 1-10 10 -Inch 22-1/2 Degree Bend $ 3,500.00 /EA x 2 EA $ 7,000.00 1-11 10 Inch 45 Degree Bend $ 3,500.00 /EA x 2 EA $ 7,000.00 1-12 10 -Inch PVC to DIP Coupler $ 3,500.00 /EA x 2 EA $ 7,000.00 1-13 Connection to Existing Force Main $ 75,000.00 /LS x 1 LS $ 75,000.00 1-14 Removal of Structures$ 2,500.00 /EA x 1 EA $ 2,500.00 1-15 84 -Inch Diameter Manhole $ 50,000.00 /EA x 2 EA $ 100,000.00 1-16 Removal Shared Use Path $ 10.00 /SY x 179.4 SY $ 1,794.00 1-17 PCC, 6" Shared Use Path $ 60.00 /SY x 179.4 SY $ 10,764.00 1-18 Seeding, Fertilizing and Mulching $ 7,500.00 /AC x 0.S AC $ 3,750.00 1-19 Rip Rap Removal $ 8.00 /SY x 380 SY $ 3,040.00 1-20 Rip Rap - Class E $ 35.00 /TON x 613.2 TON $ 21,462.00 1-21 12 -Inch Wattle Installation & Removal $ 5.00 /LF x 1570 LF $ 7,850.00 TOTAL ADDITIONS $ 152,832.50 Reason for Change Order 1-8 The temporary repair was deleted because the material for the temporary repair was not readily available and the permanent repair design had been completed. 1-1 -1-21 The permanent repair was will be completed to save the costs of the temporary repair. CONTRACT PRICE CONTRACT TIME To Substantial To Final Completion Completion Original: $ 262,420.00 Original Completion Date: 6/14/20191 7/12/2019 Previous C.O.s (ADD/DEDUCT) $ This C.O. (ADD/DEDUCT) $ 152,832.50 Revised Completion Date: 7/12/20191 7/31/2019 Contract Price with all approved Change Orders: $ 415,252.50 It is agreed by the Contractor that this Change Order includes any and all costs associated with or resulting from the change(s) ordered herein, including all impact, delays, and acceleration costs. Other than the dollar amount and time allowance listed above, there shall be no further time or dollar compensation as a result of this Change Order. THIS DOCUMENT SHALL BECOME AN AMENDMENT TO THE CONTRACT AND ALL STIPULATIONS AND COVENANTS OF THE CONTRACT SHALL APPLY HERETO. APPR BY: ED: Owner (Authorized Signature) ACCEPTED Contractor (Authorized Signature) ACCEPTED: / BY: /'G>✓/c ///' :514t/fl[,. AECOM Date Date ll 6/12/2019 Date AECOM 60443479 1 1 Project No. C.Q. No.