HomeMy WebLinkAboutPirc-Tobin - FY2019 Brock 3rd Addition, Cont No. 954 CO #5 - 7/8/2019CITY OF WATERLOO, IOWA CHANGE or EXTRA WORK ORDER NO. 5 PROJECT: F.Y. 2019 Brock 3rd Addition Sanitary Sewer Extension, CONTRACT NO. 954 Date Prepared: March 05, 2019 AMOUNT: $ 4,155.03 Decrease TO: Pirc-Tobin Construction, Inc. Contractor You are hereby ordered to make the following changes from the plans and specifications or perform the following extra work on your contract dated August 6, 2018. A. Description of change to be made or extra work to be done: 1. Adjust original construction quantities to actual construction quantities. B. Reason for ordering change or extra work: 1. As -built quantities varied for some bid items. C. Settlement for cost of work to be made as follows: 1. Compensation already made to contractor through original bid items. See attached summary. CITY OF WATERLOO Quentin Hart, Mayor ATTEST: BY: -7A f Date Kelley, Felchl-` City Clerk Date CITY ENGINEER mie Knut on, PE, (File: My Documents/Change Order/MASTER) Total Net Decrease $ 4,155.03 PIRC-TOBIN CONSTRUCTION, INC. (CONTRACTOR) BY: C ? PRINTED NAME: C._ j TITLE: /, W 0(7. (U )0 I Date WAYNE CLAASSEN ENGINEERING & SURV,EYII , IN By: William J. ssen, PE 6/Zifii Date FY2019 BROCK 3RD ADDITION SANITARY CITY OF WATERLOO Waterloo, Iowa FINAL QTY ADJUSTMENT SUMMARY Item No. DESCRIPTION 1 MOBILIZATION Contract 1 1 Final 1 Quantity I Bid Unit Increase/ Quantity 1 Unit 1 Quantity 1 Difference 1 Price Decrease 1 1 LS 1 1.00 1 0.00 1 $85,000.00 $0.00 2 CLEARING AND GRUBBING 1.0 1 LS 1 1.00 1 0.00 1 $6,500.00 $0.00 3 SEEDING, FERTILIZING AND MULCHING 4 MULCH 2.0 1 AC 1 2.00 1 0.00 1 $1,500.00 $0.00 2.0 1 AC 1 2.00 1 0.00 1 $1,000.00 5 9" DIA., 10' LONG, STRAW FILLED WATTLES 6 SILT FENCE 7 TRAFFIC CONTROL $0.00 450.0 1 LF 1 450.00 1 0.00 1 $3.50 $0.00 1,350 1 LF 1 1,430.00 1 80.00 1 $2.25 8 MAINTENANCE BOND, 2 -YEAR $180.00 1 1 LS 1 1.00 1 0.00 1 $2,000.00 $0.00 1 1 LS 1 1.00 1 0.00 1 $4,000.00 $0.00 9 SWPPP COMPLIANCE 10 REMOVE AND REPLACE EXISTING 24" HDPE DRIVEWAY CULVERT 11 CLASS A ROADSTONE 101 SANITARY SEWER MANHOLE, STANDARD 1 1 LS 1 1.00 1 0.00 1 $4,500.00 $0.00 124 1 LF 1 30.00 1 -94.00 1 $65.00 -$6,110.00 40 1 TON 1 43.23 1 3.23 1 $32.50 $104.98 5 1 EACH 1 5.00 1 0.00 1 $10,000.00 $0.00 102 SANITARY SEWER, 8 -INCH DIA. 1 1,678 1 LF 1 1,718.00 1 39.80 1 $50.00 $1,990.00 103 SANITARY SEWER, CASED 1 1 1 LS 1 1.00000 1 0.00 1 $250,000.00 CROSSING OF SERGEANT ROAD 104 SANITARY SEWER, CROSSING OF MARTIN ROAD 105 16" DIA., WATER MAIN LOWERING $0.00 1 1 LS 1 1.00 1 0.00 1 $8,500.00 $0.00 1 1 LS 1 1.00 1 0.00 1 $6,500.00 $0.00 106 SANITARY SEWER INSULATION DRIVEWAY CULVERT CHANGES COI AND MARTIN RD CROSSING PAVEMENT COLD WEATHER 32 1 LF 1 16.00 1 -16.00 1 $20.00 -$320.00 1 1 LS 1 1.00 1 0.00 1 $1,754.44 $0.00 CO2 TEMPORARY MULCH 2 1 ACRE 1 2.00 1 0.00 1 $1,265.00 $0.00 ADDITIONAL DEWATERING FOR CO3 SERGEANT ROAD SEWER CROSSING C04 REMOVE SILT FENCE FINAL QTY ADJUSTMENT AMOUNT Original Contract Amount Change Order 1 signed by City of Waterloo Change Order 2 signed by City of Waterloo Change Order 3 signed by City of Waterloo Change Order 4 signed by City of Waterloo Final QuantityAdjustment Final Contract Amount 1 1 LS 1 1.00 l 0.00 1 $58,031.84 $0.00 1,430 1 LF 1 1,430.00 1 0.00 1 $0.82 $0.00 44,155.03 $520,522.50 $1,754.44 $2,530.00 $58,031.84 $1,172.60 -$4,155.03 $579,856.35