Loading...
HomeMy WebLinkAboutWoodruff Construction - CO's 1-4 - Lincoln Park - 8/19/19CHANGE ORDER. El Mark Kuiper, RITLAND+KUIPHR ❑ Nate Goctsch, WoodrutTConstruction ❑ Quentin FIart, Mayor of Waterloo, Iowa 0 PROJECT: Lincoln Park OWNER: City of Waterloo, Iowa F.Y. 2019 #973 TO: Nate Geotsch Woodruff Construction 1717 Falls Avenue Waterloo, IA 50701 CO No.: 01 DATE OF ISSUANCE: 08/12/2019 FROM: RITLAND+KUIPER Landscape Architects 501 Sycamore Street, Mezzanine A Waterloo, Iowa 50.703 You are directed to make the following changes in this Contract: 1. Sheet PR-0l_L-1.1 (revisions dated 07/11/19): a. Removal of 1,803 SF of PCC pavement b.. Installation of 17 CY of modified subbase c. Installation of 148 SY of PCC Pavement, 6". 2. Sheet PR -01_L-1.3 (revisions dated 07/11/19): a. Deduction of 12 CY of modified subbase and 112 SY of PCC Pavement, G' b. Installation of 20 CY of modified subbase c. Installation of 149 LF of concrete curb for brick d. Installation of 1,560 SF of brick pavers with concrete base TOTAL ADD TO CONTRACT Attachments: 2019.08.12 Estimate from Woodruff Construction $57,507.00 Not valid until signed by both the Owner and Architect. Signature of the Contractor indicates his agreement herewith, including any adjustment in the Contract sum or Contract time. The original Contract Suni was $734,33030 Net change by previously authorized Change Orders $0.00 The Contract Sung prior to this Change Order was $734,330.30 The Contract Sum will be (increased) by this Change Order $57,507.00 The new Contract Sung including this Change Order will be $791,837.30 The Contract Time will be (unchanged) zero ( 0 ) Days RITLAND+KUIPER Landscape Architects ARCHITECT Mark Kuiper, ASLA, LEBD AP Woodruff Construction CONTRACTOR Signature Nate Goetsch City of Waterloo OWNER Signature Mayor Quentin Hart CHANGE ORDER IX Mark Kuiper, RrrLAND+KUIPER ❑ Nate Goetsch, Woodmff Construction ❑ Quentin Bart, Mayor or\waterloo, Iowa PROJECT: Lincoln Park OWNER: City of Waterloo, Iowa F.Y. 2019 #973 TO: Nate Geotsch Woodruff Construction 1717 Falls Avenue Waterloo, IA 50701 CO No.: 02 DATE OF ISSUANCE: 08/12/2019 FROM: RITLAND-1-KUIPER Landscape Architects 501 Sycamore Street, Mezzanine A Waterloo, Iowa 50703 You are directed to make the following changes in this Contract: 1. Supplemental Sheet P-1.1 (dated 07/11/19): a. Remove existing in -ground water hydrants 2. Supplemental Sheet P-1.2 (dated 07/11/19): a. Abandon existing water piping within park serving removed in -ground water hydrants. 3. Supplemental Sheet P-1.2 and Revised ME -2.1 (revisions dated 07/11/19): a. Add new water piping to serve new in -ground hydrants. 4. Revised Sheet ME -3.I (revisions dated 07/11/19): a. Add new in -ground hydrants to replace removed hydrants. TOTAL ADD TO CONTRACT Attachments: 2019.08.12 Estimate from Woodruff Construction $37,688.00 Not valid until signed by both the Owner and Architect Signature of the Contractor indicates. his agreement herewith, including any adjustment in the Contract sum or Contract lime. The original Contract Sum was $734,330.30 $0,00 $734,330.30 $37,688.00 $829,525.30 zero ( 0 ) Days Net change by previously authorized Change Orders The Contract Sum prior to this Change Order was The Contract Sulu will be (increased) by this Change Order The new Contract Sum including this Change Order and Change Order #01 will be The Contract Time will be (unchanged) RITLAND+KUIPER Landscape Architects ARCM I ICT Signatur r Mark Kuiper, ASLA, LEED AP . Woodruff Construction CONTRACTOR Signature Nate Goetsch City of Waterloo OWNER _ l �c 1;1 :; ( `l Signature Mayor Quentin Hart CRANGE ORDER Is] Mark Kuiper, RITLAND+KIJf't R ❑ NateGnctach, Woodruff Constriction ❑ Quentin FTart, Mayor of Waterton, Iowa PROJECT: Lincoln Park OWNER: City of Waterloo, Iowa F.Y. 2019 #973 TO: Nate Gcotsch Woodruff Construction 1717 Falls Avenue Waterloo, IA 50701 CO No.: 03 DATE OF ISSUANCE: 08/12/2019 FROM: RITLAND+KUIPER Landscape Architects 501 Sycamore Street, Mezzanine A Waterloo, Iowa 50703 You are directed to make the following changes in this Contract: 1. MidAmcrican Energy shall provide secondary feeds to within 20' of each new electrical cabinet. Electrical contractor shall make final connection between secondary feeds by MidAmerican and the electrical cabinet panel. TOTAL DEDUCTION TO CONTRACT $14,223 Attachments: 2019.08.12 Estimate from Woodruff Construction Not valid until signed by both the Owner and Architect. Signature of the Contractor indicates his agreement herewith, including any adjustment in the Contract sum or Contract time. The original Contract Sum was $734,330.30 $0.00 $734,330.30 $14,223 $815,302.30 zero ( 0 ) Days Net change by previously authorized Change Orders The Contract Sum prior to this Change Order was The Contract Sum will be (decreased) by this Change Order The new Contract Sum including this Change Order and Change Order #01 & #02 will be The Contract Time will be (unchanged) RITLAND+KU1PER Landscape Architects ARCHITECT Mark Kuiper, ASLA, LEED AP Woodruff Construction City of Waterloo CONTRACTOR OWNER Signature Signature Nate Goetsch Mayor Quentin Hart CHANGE ORDER El Mark Kuiper, RITLAND-1]'CUIPER ❑ Nate Goelsoh, woodnil7Constiuction ❑ Quentin Har, Mayor ofwatcrloo, Iowa 0 PROJECT: Lincoln Park OWNER: City of Waterloo, Iowa F.Y. 2019 #973 TO: Nate Geo tsch Woodruff Construction 1717 Falls Avenue Waterloo, IA 50701 CO 11®0.: 04 DATE OF ISSUANCE: 08/13/2019 FROM: RITLAND+KUIPER Landscape Architects 501 Sycamore Street, Mezzanine A Waterloo, Iowa 50703 You are directed to make the following changes in this Contract: 1. Revise fiber conduit locations as per supplemental sheet T-1.1. 2. Clarify fiber conduits shall be equal to the Dura -Line FuturePath Microducts. Refer to specifications for additional information. 3. Removal of existing communication cabling and handholes. Abandon existing communication conduits. 4. Add new fiber conduit locations bored under street to existing traffic control cabinets. 5. Add 72 -strand single -mode fiber and associated termination equipment anal enclosures. 6. Add 6. -strand single -mode fiber and associated termination equipment and enclosures where shown on plans. 7. Existing power feed to lighting in park sculpture shall remain. TOTAL ADD TO CONTRACT Attachments: 2019.08.12 Estimate from Woodruff Construction $88,278.00 Not valid until signed by both the Owner and Architect. Signature of the Contractor indicates his agreement herewith, including any adjustment in the Contract sum or Contract time The original Contract Sum was Net change by previously authorized Change Orders The Contract Sum prior to this Change Order was The Contract Sum will be (increased) by this Change Order The new Contract Sum including this Change Order and Change Order #01, #02 and #03 will be The Contract Time will be (unchanged) RITLAND+KUIPER Landscape Architects ARCHITECT Woodruff Construction CONTRACTOR Signature r Signature Mark K.uiper, ASLA, LEED AP Nate Goetsch $734,330.30 $0.00 $734,33030 $ 88,.278.00 $903,580.30 zero ( 0 ) Days City of Waterloo O\VNI3R Signature Mayor Quentin Hart