PROJECT: Lincoln Park
OWNER: City of Waterloo, Iowa
F.Y. 2019 #973
TO: Nate Geotsch
Woodruff Construction
1717 Falls Avenue
Waterloo, IA 50701
CO No.: 01
DATE OF ISSUANCE: 08/12/2019
FROM:
RITLAND+KUIPER Landscape Architects
501 Sycamore Street, Mezzanine A
Waterloo, Iowa 50.703
You are directed to make the following changes in this Contract:
1. Sheet PR-0l_L-1.1 (revisions dated 07/11/19):
a. Removal of 1,803 SF of PCC pavement
b.. Installation of 17 CY of modified subbase
c. Installation of 148 SY of PCC Pavement, 6".
2. Sheet PR -01_L-1.3 (revisions dated 07/11/19):
a. Deduction of 12 CY of modified subbase and 112 SY of PCC Pavement, G'
b. Installation of 20 CY of modified subbase
c. Installation of 149 LF of concrete curb for brick
d. Installation of 1,560 SF of brick pavers with concrete base
TOTAL ADD TO CONTRACT
Attachments: 2019.08.12 Estimate from Woodruff Construction
$57,507.00
Not valid until signed by both the Owner and Architect.
Signature of the Contractor indicates his agreement herewith, including any adjustment in the Contract sum or Contract time.
The original Contract Suni was $734,33030
Net change by previously authorized Change Orders $0.00
The Contract Sung prior to this Change Order was $734,330.30
The Contract Sum will be (increased) by this Change Order $57,507.00
The new Contract Sung including this Change Order will be $791,837.30
The Contract Time will be (unchanged) zero ( 0 ) Days
RITLAND+KUIPER
Landscape Architects
ARCHITECT
Mark Kuiper, ASLA, LEBD AP
Woodruff Construction
CONTRACTOR
Signature
Nate Goetsch
City of Waterloo
OWNER
Signature
Mayor Quentin Hart
CHANGE ORDER
IX Mark Kuiper, RrrLAND+KUIPER
❑ Nate Goetsch, Woodmff Construction
❑ Quentin Bart, Mayor or\waterloo, Iowa
PROJECT: Lincoln Park
OWNER: City of Waterloo, Iowa
F.Y. 2019 #973
TO: Nate Geotsch
Woodruff Construction
1717 Falls Avenue
Waterloo, IA 50701
CO No.: 02
DATE OF ISSUANCE: 08/12/2019
FROM:
RITLAND-1-KUIPER Landscape Architects
501 Sycamore Street, Mezzanine A
Waterloo, Iowa 50703
You are directed to make the following changes in this Contract:
1. Supplemental Sheet P-1.1 (dated 07/11/19):
a. Remove existing in -ground water hydrants
2. Supplemental Sheet P-1.2 (dated 07/11/19):
a. Abandon existing water piping within park serving removed in -ground water hydrants.
3. Supplemental Sheet P-1.2 and Revised ME -2.1 (revisions dated 07/11/19):
a. Add new water piping to serve new in -ground hydrants.
4. Revised Sheet ME -3.I (revisions dated 07/11/19):
a. Add new in -ground hydrants to replace removed hydrants.
TOTAL ADD TO CONTRACT
Attachments: 2019.08.12 Estimate from Woodruff Construction
$37,688.00
Not valid until signed by both the Owner and Architect
Signature of the Contractor indicates. his agreement herewith, including any adjustment in the Contract sum or Contract lime.
The original Contract Sum was $734,330.30
$0,00
$734,330.30
$37,688.00
$829,525.30
zero ( 0 ) Days
Net change by previously authorized Change Orders
The Contract Sum prior to this Change Order was
The Contract Sulu will be (increased) by this Change Order
The new Contract Sum including this Change Order and Change Order #01 will be
The Contract Time will be (unchanged)
RITLAND+KUIPER
Landscape Architects
ARCM I ICT
Signatur
r
Mark Kuiper, ASLA, LEED AP .
Woodruff Construction
CONTRACTOR
Signature
Nate Goetsch
City of Waterloo
OWNER
_
l �c 1;1 :; ( `l
Signature
Mayor Quentin Hart
CRANGE ORDER
Is] Mark Kuiper, RITLAND+KIJf't R
❑ NateGnctach, Woodruff Constriction
❑ Quentin FTart, Mayor of Waterton, Iowa
PROJECT: Lincoln Park
OWNER: City of Waterloo, Iowa
F.Y. 2019 #973
TO: Nate Gcotsch
Woodruff Construction
1717 Falls Avenue
Waterloo, IA 50701
CO No.: 03
DATE OF ISSUANCE: 08/12/2019
FROM:
RITLAND+KUIPER Landscape Architects
501 Sycamore Street, Mezzanine A
Waterloo, Iowa 50703
You are directed to make the following changes in this Contract:
1. MidAmcrican Energy shall provide secondary feeds to within 20' of each new electrical cabinet.
Electrical contractor shall make final connection between secondary feeds by MidAmerican and
the electrical cabinet panel.
TOTAL DEDUCTION TO CONTRACT $14,223
Attachments: 2019.08.12 Estimate from Woodruff Construction
Not valid until signed by both the Owner and Architect.
Signature of the Contractor indicates his agreement herewith, including any adjustment in the Contract sum or Contract time.
The original Contract Sum was $734,330.30
$0.00
$734,330.30
$14,223
$815,302.30
zero ( 0 ) Days
Net change by previously authorized Change Orders
The Contract Sum prior to this Change Order was
The Contract Sum will be (decreased) by this Change Order
The new Contract Sum including this Change Order and Change Order #01 & #02 will be
The Contract Time will be (unchanged)
RITLAND+KU1PER
Landscape Architects
ARCHITECT
Mark Kuiper, ASLA, LEED AP
Woodruff Construction
City of Waterloo
CONTRACTOR OWNER
Signature Signature
Nate Goetsch Mayor Quentin Hart
CHANGE ORDER
El Mark Kuiper, RITLAND-1]'CUIPER
❑ Nate Goelsoh, woodnil7Constiuction
❑ Quentin Har, Mayor ofwatcrloo, Iowa
0
PROJECT: Lincoln Park
OWNER: City of Waterloo, Iowa
F.Y. 2019 #973
TO: Nate Geo tsch
Woodruff Construction
1717 Falls Avenue
Waterloo, IA 50701
CO 11®0.: 04
DATE OF ISSUANCE: 08/13/2019
FROM:
RITLAND+KUIPER Landscape Architects
501 Sycamore Street, Mezzanine A
Waterloo, Iowa 50703
You are directed to make the following changes in this Contract:
1. Revise fiber conduit locations as per supplemental sheet T-1.1.
2. Clarify fiber conduits shall be equal to the Dura -Line FuturePath Microducts. Refer to specifications for
additional information.
3. Removal of existing communication cabling and handholes. Abandon existing communication conduits.
4. Add new fiber conduit locations bored under street to existing traffic control cabinets.
5. Add 72 -strand single -mode fiber and associated termination equipment anal enclosures.
6. Add 6. -strand single -mode fiber and associated termination equipment and enclosures where shown on
plans.
7. Existing power feed to lighting in park sculpture shall remain.
TOTAL ADD TO CONTRACT
Attachments: 2019.08.12 Estimate from Woodruff Construction
$88,278.00
Not valid until signed by both the Owner and Architect.
Signature of the Contractor indicates his agreement herewith, including any adjustment in the Contract sum or Contract time
The original Contract Sum was
Net change by previously authorized Change Orders
The Contract Sum prior to this Change Order was
The Contract Sum will be (increased) by this Change Order
The new Contract Sum including this Change Order and Change Order #01, #02 and #03 will be
The Contract Time will be (unchanged)
RITLAND+KUIPER
Landscape Architects
ARCHITECT
Woodruff Construction
CONTRACTOR
Signature r Signature
Mark K.uiper, ASLA, LEED AP Nate Goetsch
$734,330.30
$0.00
$734,33030
$ 88,.278.00
$903,580.30
zero ( 0 ) Days
City of Waterloo
O\VNI3R
Signature
Mayor Quentin Hart