HomeMy WebLinkAboutDon Gardner Constructionon
ardner
onstruction
315 La Porte Rd.
Waterloo, IA 50702
CITY OF WATERLOO
CITY CLERK'S OFFICE
AUG 29 2019 r H 12:5b:45
on
ardner
onstruction
315 La Porte Rd.
Waterloo, IA 50702
CITY OF WATERLOO
CITY 9 •Y CLER• '`J OFFICE
AUG 29 2015 PH 12 : 56:22
PROPOSAL FOR:
FY2019 YOUNG ARENA ROOF REPLACEMENT
CITY CLERK, FIRST FLOOR
715 MULBERRY ST.
WATERLOO, IA
BID BOND & OTHER DOCUMENTS FOR:
FY2019 YOUNG ARENA ROOF REPLACEMENT
CITY CLERK, FIRST FLOOR
715 MULBERRY ST.
WATERLOO, IA
CITY OF WATERLOO, IOWA
WATERLOO LEISURE SERVICES COMMISSION
BID FORM
For
FY2019 Young Arena Roof Replacement Project, Contract No. 998
BIDDER: Don Gardner Construction Co., Inc.
COMPANY NAME
ADDRESS: 315 La Porte Rd.
Waterloo, IA 50702
PHONE: ( 319 ) 234-0272
1. The undersigned, being a Corporation existing under the laws of the State of Iowa
Bariaapcgoasisikagfitfaecfollowingcpatirtaf&
having been familiarized with the existing conditions on the project area affecting the cost of the work,
and with all the Contract Documents now on file in the offices of the City Clerk, City Hall, Waterloo,
Iowa, and the Waterloo Leisure Services Commission, 1101 Campbell Ave., Waterloo, Iowa, hereby
proposes to furnish all supervision, technical personnel, labor, materials, machinery, tools,
equipment, and services, including utility and transportation services required to complete the
proposed FY2019 Young Arena Roof Replacement Project, Contract No. 998 in accordance with the
contract documents and for the total price for work in place for the following amount:
Base Bid: West Mechanical Roof Section
Tear off existing roof system down to concrete deck. Install self -adhered vapor retarder, insulation in
foam adhesive, adhere 60 -mil EPDM single -ply membrane, associated EPDM flashings and all
associated work as specified.
(Mt Ilu/tt ed 1-nenT y "Seile 1 Aotbrard 'Dor Jundrec` and S¢vendy A'e. dollars ($ PP/ L/ 734- )
Alternate Bid 01: East Mechanical Roof Section to be done concurrent with West Mechanical
Roof Section
Tear off existing roof system down to concrete deck. Install self -adhered vapor retarder, insulation in
foam adhesive, adhere 60 -mil EPDM single -ply membrane, associated EPDM flashings and all
associated a work as specified. II /) 1 ) A II j
Olehonfrat vvt �.m,4.j � 1ne 400sarrd €' W hv0)€d tLvl� 1111:(19 dollars ($ 121,930 )
Alternate Bid 02: East Mechanical Roof Section, work beginning 7/1/2020
Tear off existing roof system down to concrete deck. Install self -adhered vapor retarder, insulation in
foam adhesive, adhere 60 -mil EPDM single -ply membrane, associated EPDM flashings and all
associated work as specified.
• One, LI tot tett TwenEij-111rne 4nousand f,1JVr'f110obiru( A1
�fy dollars ($ )
Alternate Bid 03: West Mechanical Roof Section
Install 90 -mil EPDM single -ply membrane with a 30 -year warranty, in lieu of 60 -mil EPDM single -ply
membrane with a 20 -year warranty.
Add to Base Bid
Iwy LirSanet P ve 1104JTddd. and 4c firRfee.
dollars ($ 2) 5 33 )
Alternate Bid 04: East Mechanical Roof Section
Install 90 -mil EPDM single -ply membrane with a 30 -year warranty, in lieu of 60 -mil EPDM single -ply
membrane with a 20 -year warranty.
Add to Alternate Bid No. 01
4110vjJ.not -Jtrll+nr/tet( ctnd 4h: (I )'er
dollars ($ 2, s33 )
Alternate Bid 05: East Mechanical Roof Section, work beginning 7/1/2020
Install 90 -mil EPDM single -ply membrane with a 30 -year warranty, in lieu of 60 -mil EPDM single -ply
membrane with a 20 -year warranty.
Add to Alternate Bid No. 02
few, hard
11;:n t. hviota Lund ♦limy atr9ti
dollars ($ ) 31 I' g )
Alternate Bid 06:
Replace damaged louver on north enclosure of east roof (west louver section).
Add to Base Bid
/1:1 e. hot/Sand SlfvCf) `f VC. dollars ($ 1)
Alternate Bid 07:
Replace damaged louver on north enclosure of east roof (west louver section) beginning 7/1/2020.
Add to Base Bid
rine Apt/siva awe( Seven u ` riv(
dollars($ Ij07S )
Alternate Bid 08:
Replace the existing air handling unit, AHU-3, and associated temperature controls serving the locker
rooms.
Add to Base Bid
42:f4-1 ve Auudatod Seven hvnolfti GLoIIGrt
dollars ($ 16; 700
Alternate Bid 09:
Replace the existing exhaust fan serving the locker rooms. Add a VFD to the new exhaust fan and a
VFD to the AHU-3 supply fan to perform an unoccupied setback sequence.
Add to Base Bid
Unit Pricing
kW Sahel et ot
dollars
39)030 )
For changing specified quantities of work from those required by the Contract
Documents, upon written instructions of the Owner, the following unit prices shall
prevail. The proposed unit prices include all labor, overhead, profit, materials,
equipment, taxes, and freight.
Only a single unit price shall be given, and it shall apply for either more or less
than the quantity required by the Contract Documents.
Refer to Section 01 11 00 - Summary of Work for a description of stipulated
quantity allowances to be included in the bid, where applicable.
In the event of more or less units than so required, change orders shall be issued
for the increased or decreased amount.
Description
Remove and replace plywood
Install walkway as specified or as
directed by Owner
Repair concrete deck as specified (opening
Less than 12"
Repair concrete deck as specified (opening
greater than 12")
Replace broken drain clamping rings
Unit Price
$ 9C Do
Per Square Foot
$ /8.00
Per Linear Foot
$ /25-,00
Per Square Foot
$ 306:00
Per Square Foot
$ 325.• 00
Per Each
2. In submitting this bid, the Bidder understands that the right is reserved by the City of Waterloo,
Iowa, to reject any or all bids. If written notice of acceptance of this Bid is mailed or delivered to the
undersigned within thirty (30) days after Bid Opening, of at any time thereafter before this bid is
withdrawn, the undersigned agrees to execute and deliver an agreement in the prescribed form and
furnish the required bond and certificate of insurance within ten (10) days after the agreement is
presented for signature, and start work within ten (10) days after "Notice to Proceed" is issued.
3. Security in the sum of 5%dollars ($ )
In the form of a bid bond , is submitted herewith in accordance with
NOTICE TO BIDDERS.
4 Attached is a Non -Collusion Affidavit of Prime Contractor.
5. The Bidder is prepared to submit a financial and experience statement upon request.
6. The Prime Contractor and Subcontractor(s), which have performed an aggregate of $10,000.00 in
work for the City in the current calendar year, are prepared to submit an AAP or Update and an FOC,
within ten (10) days of notification that the bid submitted is lowest and acceptable.
7. The Bidder has received the following Addendum or Addenda:
Addendum No.
1
Date: 08 / 22 / 19
/ /
/ /
8. The Bidder shall list the MBE/WBE subcontractors, amount of subcontracts and bid items listed on
the City of Waterloo Minority and /or Women Business Pre-bid Contract Information Form submitted
with this Bid Form. The apparent low bidder shall submit a list of all other subcontractor(s) to be used
on this project to the City of Waterloo by 5:00 p.m. the business day following the day bids on this
project are due along with the Non -collusion Affidavits of ALL Subcontractor(s).
The subcontractors listed on this proposal and/or submitted to the Contract Compliance Officer
cannot be changed except for the following reasons.
a) The City of Waterloo does not approve the subcontractors.
b) The subcontractors submit in writing that they cannot fulfill their subcontracts
9. The Bidder has filled in all blanks on this proposal. Those blanks not applicable are marked
"none" or "NA".
10. The bidder has attached all applicable forms.
11. The owner reserves the right to select alternatives, delete line items, and/or to reduce quantities
prior to the Award of Contract due to budgetary limitations.
CONTACT PERSON: Casey Gardner, VP
Please Print
PHONE (319) 234-0272
SIGNED:
DATE. 08 / 29 / 19
BID BOND
KNOW ALL MEN BY THESE PRESENTS, that we, Don Gardner Construction Company
as Principal and
IMT Insurance Company
As Surety are held and firmly bound unto the City of Waterloo, Iowa, hereinafter called "OWNER". In the penal
Sum
Five Percent of Amount Bid dollars
($ 5% ) lawful money of the United States, for the payment of which sum will and truly be made,
we bind ourselves, our heirs, executors, administrators, and successors, jointly and severally, firmly by these
presents. The condition of this obligation is such that whereas the Principal has submitted the accompanying
bid dated the 29thday of August , 20 19 , for
FY 2019 Young Arena Roof Replacement Project, Contract No. 998
NOW, THEREFORE,
a) If said Bid shall be rejected, or in the alternate,
b) If said Bid shall be accepted and the Principal shall execute and deliver a contract in the form specified and
shall furnish a bond for his faithful performance of said contract, and for the payment of all persons performing
labor or furnishing materials in connection therewith, and shall in all other respects perform the agreement
created by the acceptance of said Bid,
Then this obligation shall be void, otherwise the same shall remain in force and effect; it being expressly
understood and agreed that the liability of the Surety for any and all claims hereunder shall, in rio event,
exceed the penal amount of this obligation as herein stated.
By virtue of statutory authority, the full amount of this bid bond shall be forfeited to the Owner in liquidation of
damages sustained in the event that the Principal fails to execute the contract and provide the bond as
provided in the specifications or by law.
The Surety, for value received, hereby stipulates and agrees that the obligations of said Surety and its bond
shall be in no way impaired or affected by any extension of the time within which the Owner may accept such
Bid or execute such contract; and said Surety does hereby waive notice of any such extension.
IN WITNESS WHEREOF, the Principal and the Surety have hereunto set their hands and seals, and such of
them as are corporations, have caused their corporate seals to be hereto affixed and these presents to be
signed by their proper officers this 29th ria,v of August �`. d7 e2S' 2019
;3)-YLICSa(tCt-(4:51r2ttS
(Title)
Witness
Don Gardner Construction C•mman (Seal)
Principal
By
Casey Gardner, Vice President
IMT Insurance Company
Surety
By
Attorney -I - e ct Nancy D. Baltutat
(Seal)
INSURANCE
POWER OF ATTORNEY
Know All Persons By These Presents, that IMT Insurance Company a corporation duly organized under the laws of the State of Iowa,
and having its principal office in the City of West Des Moines, County of Polk, State of Iowa, hath made, constituted and appointed, and does by
these presents make, constitute and appoint
Jeffrey R. Baker, Nancy D. Baltutat, Patrick K Duff, Mark E. Keairnes,
Greg T. LaMair, Joseph I. Schmit, Christopher R. Seiberling, and Jill Shaffer
of West Des Moines and State of Iowa its true and lawful Attorney -in -Fact, with full power and
authority hereby conferred in its name, place and stead, to sign, execute, acknowledge and deliver in its behalf as surety any and all bonds, under-
takings, recognizanccs or other written obligations in the nature thereof, subject to the limitation that any such instrument shall not exceed the
amount of:
*****Unlimited Amounts*****
and to bind IMT Insurance Company thereby as fully and to the same extent as if such bond or undertaking was signed by the duly authorized
officers of IMT Insurance Company, and all such acts of said Attorney -in -Fact, pursuant to the authority herein given, are hereby ratified and
confirmed.
This Power -of -Attorney is made and executed pursuant to and by authority of the following By -Laws adopted by the Board of
Directors of IMT Insurance Company on December 18, 1998.
ARTICLE VIII, SECTION 4. - The President or any Vice President or Secretary shall have the authority to appoint Attorneys In Fact and
to authorize them to execute on behalf of the Company, and attach thereto the Corporate Seal, bonds, undertakings, recognizances, con-
tracts of indemnity or other obligatory writings, excluding insurance policies and endorsements.
ARTICLE VIII, SECTION 5. - The signature of any authorized officer and the Corporate Seal may be affixed by facsimile to any Power
of Attorney authorizing the execution and delivery of any of the instruments described in Article VIII, Section 4 of the By -Laws. Such
facsimile signature and seal shall have the same force and effect as though manually affixed.
In Witness Whereof, IMT Insurance Company has caused these presents to be signed by its President and its corporate seal to
be hereto affixed, this 29th day of August , 2019 ,..^"""' -.
C
r^n-1 .4,
STATE OF IOWA
COUNTY OF POLK
}
ss:
IMT Insurance Company
Sean Kennedy, President
On this 29th day of August , 2019 before me appeared Sean Kennedy, to me personally known,
who being by me duly sworn did say that he is President of the IMT Insurance Company, the corporation described in the foregoing
instrument, and that the Seal affixed to the said inst .ument is the Corporate Seal of the said Corporation and that the said instrument was signed
and sealed in behalf of said Corporation by, authority of its Board of Directors.
In Testimony Whereof, I have hereunto set my hand and affixed my Official Seal at the City of West Des Moines, Iowa, the day and year
first above written.
COMMISSION NO. Mang
SETH CARP
MY WOOS ? ?o?o
Notary Public, Polk County, Iowa
CERTIFICATE
I, Dalene Holland, Secretary of the IMT Insurance Company do hereby certify that the above and foregoing is a true and correct copy
of the POWER-OF-ATTORNEY, executed by said the IMT Insurance Company, which is still in force and effect.
In Witness Whereof, I have hereunto set my hand and affixed the Seal of the Company on 29th day of
August , 2019
SY 06 06 (01/19)
Dalene Holland, Sec etary
t' • ':
CI :`i_ ...a -
I.
%
T <s irk' 2 1
nN:
r
MBE/VVBE BUSINESS ENTERPRISE
PRE-BID CONTACT INFORMATION FORM
Prime Contractor Name: Don Gardner Construction Co., Inc. Project: FY Young Arena Roof Replacement
NO MBEIWBE SUBCONTRACTORS: If you are NOT using any MBE/VVBE subcontractors to complete this project, sign below.
Attach a brief explanation as to why subcontracting was not feasible with this project. If any MBE/VVBE subcontractors will be used,
please use bottom portion of this form.
Contractor's Signature:
Casey Gardner
Letting Date: 08/29/19
Title: Vice President Date: 08/29/19
SUBCONTRACTORS APPLDCABLE: You are required, in order for your bid to be considered responsive, to provide the information
on this form showing ALL of your MBE/VVBE subcontractor contacts made for your bid submission. This information is subject to verification.
Any questions should be directed to Contract Compliance Office (319) 291-4429.
You are required, in order for your bid to be considered responsive, to provide the information on this Form showing your MBE/WBE Business
Enterprise contacts made prior to your bid submission. This information is subject to verifications and confirmation.
If you are unable to identify MBE/WBE firms to perform portions of the work, please contact Rudy Jones, Contract Compliance Officer,
for assistance at (319) 291-4429.
In the event it is determined that the MBE/VVBE Business Enterprise goals are not met, then before awarding the contract the
City of Waterloo will make a determination as to whether or not the apparent successful low bidder made good faith efforts to meet the goals.
Subcontractor
Quotes Received
Quotes used in Bid
Dates Contacted
Yes or
No
Date
Received
Yes or
No
Dollar Amount
to be Subcontracted
Atlas Painting
08/23/19
No
911 Sycamore
Waterloo, IA 50703
Carter Electric
08/23/19
No
P.O. Box 2032
Waterloo, IA 50704
Culpepper Electric
08/23/19
No
1731 Cottage Grove
Waterloo, IA 50707
NON -COLLUSION AFFIDAVIT OF PRIME BIDDER
State of Iowa
County Of Black Hawk
Casey Gardner
, being first duly sworn, deposes and says that:
1. He is $keit), ( reit), (Officer), (R a hit , or (Agent) of Don Gardner constructigihhe
Bidder that has submitted the attached Bid;
2. He is fully informed respecting the preparation and contents of the attached Bid and of all
pertinent circumstances respecting such Bid;
3. Such Bid is genuine and is not a collusive or sham Bid;
4. Neither the said Bidder nor any of its officers, partners, owners, agents, representatives,
employees, or parties in interest, including this affiant, has in any way colluded, conspired,
connived or agreed, directly or indirectly, with any other Bidder, firm or person to submit a
collusive or sham Bid in connection with the Contract for which the attached Bid has been
submitted or to refrain from bidding in connection with such Contract, or has in any manner,
directly or indirectly, sought by agreement or collusion or communication or conference with any
other Bidder, firm or person to fix the price or prices in the attached Bid or of any other Bidder, or,
to fix any overhead, profit or cost element of the bid price or the bid price of any other Bidder, or to
secure through any collusion, conspiracy, connivance, or unlawful agreement any advantage
against the City of Waterloo, Iowa, or any person interested in the Proposed Contract; and
5. The price or prices quoted in the attached Bid are fair and proper and are not tainted by any
collusion, conspiracy, connivance or unlawful agreement on the part of the Bidder or any of its
agents, representativ- _+Wner employees, or parties in interest, including this affiant.
Vice President
Signature
Casey Gardner
Title
Subscribed and sworn to before me this
29th Day of August
Saikkm(
Signature Title
My commission expires 03/03/21
Office Manager