Loading...
HomeMy WebLinkAbout2009-454-05/18/2009 CC tri rr1s N n Cff F- ru O N rr � his Resolution prepared by Nancy Eckert, City Clerk, 715 Mulberry greet, Waterloo, Iowa. RESOLUTION NO. 2009-454 H o hl tri RESOLUTION APPROVING AGREEMENT WITH TERRACON s trj >C X n CONSULTING ENGINEERS AND DIRECTING EXECUTION trlo s OF SAID AGREEMENT BY MAYOR. • H E� H N 3 c BE IT RESOLVED BY THE COUNCIL OF THE CITY OF WATERLOO, IOWA, t the agreement dated May 18 , 2009, at a cost of $2, 485 . 00 , 4e--r subsurface exploration and laboratory testing for the construction of the shallow foundation system and floor slab for Water Pollution Control Facility Storage Building, by and tween Terracon Consulting Engineers of Cedar Falls, Iowa and -the City of Waterloo, Iowa, be and the same is hereby approved, it the Mayor authorized to execute the same in behalf of the Cty of Waterloo, Iowa. tri m PASSED AND ADOPTED this 18th day of May, 2009 . H � _ Tim Hurley, May ATTEST: Nancy Ecker CMC City Clerk �'