Loading...
HomeMy WebLinkAboutWayne Claassen Engineering - Supp Agmnt #1 to contract No. 986 - 10/14/2019Supplemental Agreement No. 1 to the Lot 2, Brock Third Sanitary Sewer Extension, Contract 986 Professional Service Agreement between the City of Waterloo, Iowa and Wayne Claassen Engineering and Surveying, Inc. PROJECT: Lot 2, Brock Third Sanitary Sewer Extension, Contract 986 Project TO: Wayne Claassen Engineering and Surveying, Inc. FROM: City of Waterloo, Iowa You are hereby ordered to make the following changes to the existing Agreement for Professional Services for the Hammond Avenue Bridge Replacement project, dated 09/03/2019 1. Add the following to said existing Agreement: Part III. TERMS AND CONDITIONS Article 1. ENGINEERING SERVICES 1.1 Basic Services - The Engineer agrees to perform professional services in connection with the Project, as set forth below and contained within this Agreement: A. Preliminary Engineering Phase Task 5. Geotechnical Services. This task includes subcontracting two soil borings to determine soil and groundwater conditions for the Project. 2. Settlement for cost of work to be made as follows: Increase of $2,250.00 to the Basic Preliminary Engineering Phase of the Agreement. The Basic Preliminary Engineering Phase of the Agreement will be $12,250.00 with this Supplemental Agreement No. 1. 3. All other sections of said existing Agreement remain unchanged. Page 1 of 2 CITY OF WATERLOO APPROVED: BY: 1. t Quentin Hart, Mayor of Waterloo WAYNE CLAASSEN ENGINEERING AND SURVEYING, INC. BY: Wil am J. Cla en, President ATTEST BY: ATTE Kelley Felc e, City Clerk .6//(4./16\ Y: ,c0( Denise DeLeon, Secretary /0/74 7 Date Date Page 2 of 2