Loading...
HomeMy WebLinkAboutCroell, Inc. - Change Order #4 - Project No. 3-19-0094-045 - 10/14/2019CHANGE ORDER NO. 4 (FINAL) Owner Waterloo Regional Airport, City of Waterloo, Iowa Date September 21, 2019 Project Reconstruct Taxiway C - North of Runway 12/30, Reconstruct Taxiway C - South of Runway 12/30 Owner's Contract No. FAA AIP Project No. 3-19-0094-045 Contractor Croell, Inc. Date of Contract Start July 17, 2017 You are directed to make the following changes in the Contract Documents. Description: Item No. Description Unit Unit Price Quantity Amount 6 Subbase Course CY $ 80.00 (53.74) ($ 4,299.20) 7 Installation and Removal of Silt Fence LF $ 2.65 (184.0) ($ 487.60) 8 Installation and Removal of Inlet Protection EA $ 295.00 (2.0) ($ 590.00) 10 Aggregate Base Course CY $ 81.00 66.47 $ 5,384.07 11 8 -Inch Portland Cement Concrete Pavement SY $ 45.82 44.44 $ 2,036.44 13 Reflective Media (Type I, Gradation A) LB $ 0.50 (20.40) ($ 10.20) 14 Temporary Runway and Taxiway Marking SF $ 1.00 (8800.0) ($ 8,800.00) 15 18 -Inch Reinforced Concrete Pipe (RCP) LF $ 61.00 (1.0) ($ 61.00) 21 Seeding AC $ 2,150.00 (1.18) ($ 2,537.00) 23 Mulching AC $ 3,500.00 4.28 $ 14,980.00 24 No. 8 AWG, 5KV, L-824 Type C Cable, Installed in Trench Bank or Conduit LF $ 0.71 137.00 $ 97.27 25 No. 6 AWG, 5KV, L-824 Type C Cable, Installed in Trench Bank or Conduit LF $ 1.21 150.00 $ 181.50 26 No. 6 AWG Bare Copper Counterpoise Wire, Installed in Trench, above the Ductbank or Conduit including Ground Rods and Ground Connectors LF $ 0.94 470.00 $ 441.80 27 Concrete Encased Electrical Duct Bank, 2 -Way, 4 -Inch Schedule 40 PVC LF $ 25.39 (50.0) ($ 1,269.50) 28 Non -Encased Electrical Conduit, 2 -inch Schedule 40 PVC LF $ 2.30 470.0 $ 1,081.00 29 Electrical Handhole, L-868 EA $ 712.02 (1) ($ 712.02) 104 Full Depth Saw Cut LF $ 8.00 (41.50) ($ 332.00) 108 Hot Mix Asphalt (P-401) Including Tack Coat TON $ 220.00 (4.73) ($1,040.60) Reconstruct Taxiway C - North of Runway 12/30 CO -4 Reconstruct Taxiway C - South of Runway 12/30 1 Project No - 60550592 Item No. Description P Unit Unit Price Quantity Amount 109 I Runway Edge Marking including Reflective Media SF $ 2.10 (98.90) ($ 207.69) 110 Directional Bore for 2 — 2 inch Conduits LF $ 13.20 5 $ 66.00 111 2 -inch Schedule 40 HDPE LF $ 0.94 10.0 $ 9.40 Total Change Order $ 3,930.67 I Reason for Change Order: The purpose of this change order is to adjust all quantities to reflect final field measured quantities. 6. Subbase Course — adjust to match field measured quantity. 7. Installation and Removal of Silt Fence - adjust to match field measured quantity. 8. Installation and Removal of Inlet Protection - adjust to match field measured quantity. 10. Aggregate Base Course - adjust to match field measured quantity. 11. 8 -Inch Portland Cement Concrete Pavement - adjust to match field measured quantity. 13. Reflective Media (Type I, Gradation A) - adjust to match field measured quantity. 14. Temporary Runway and Taxiway Marking — item not used as pavement was closed until 30 day curing time was achieved and allowed for placement of permanent markings. 15. 18 -Inch Reinforced Concrete Pipe (RCP) - adjust to match field measured quantity. 21. Seeding - adjust to match field measured quantity. 23. Mulching — item was used for temporary erosion control as grading was completed outside of permanent seeding season - adjust to match field measured quantity. 24. No. 8 AWG, 5KV, L-824 Type C Cable, Installed in Trench Bank or Conduit - adjust to match field measured quantity. 25. No. 6 AWG, 5KV, L-824 Type C Cable, Installed in Trench Bank or Conduit - adjust to match field measured quantity. 26. No. 6 AWG Bare Copper Counterpoise Wire, Installed in Trench, above the Ductbank or Conduit including Ground Rods and Ground Connectors — adjust to match field measured quantity. 27. Concrete Encased Electrical Duct Bank, 2 -Way, 4 -Inch Schedule 40 PVC — adjust to match field measured quantity. 28. Non -Encased Electrical Conduit, 2 -inch Schedule 40 PVC — adjust to match field measured quantity. 29. Electrical Handhole, L-868 — adjust to match field measured quantity. 104. Full Depth Saw Cut — adjust to match field measured quantity. 108. Hot Mix Asphalt (P-401) Including Tack Coat — adjust to match field measured quantity. 109. Runway Edge Marking including Reflective Media — adjust to match field measured quantity. 110. Directional Bore for 2 — 2 -inch Conduits — adjust to match field measured quantity. 111. 2 -Inch Schedule 40 HDPE — adjust to match field measured quantity. Reconstruct Taxiway C — North of Runway 12/30 Reconstruct Taxiway C — South of Runway 12/30 CO -4 Project No — 60550592 2 CONTRACT PRICE Original: $ 2,128,833.19 Previous C.O.s (ADD): $ 15,582.12 This C.O. (ADD): $ 3,930.67 Contract Price with all approved Change Orders: $ 2,148,349.98 CONTRACT TIMES (Calendar Days) To final completion Original: Previous C.O.s (ADD): This C.O. (ADD): REVISED: To substantial completion 150 4 4 158 It is agreed by the Contractor that this Change Order includes any and all costs associated with or resulting from the change(s) ordered herein, including all impact, delays, and acceleration costs. Other than the dollar amount and time allowance listed above, there shall be no further time or dollar compensation as a result of this Change Order. THIS DOCUMENT SHALL BECOME AN AMENDMENT TO THE CONTRACT AND ALL STIPULATIONS AND COVENANTS OF THE CONTRACT SHALL APPLY HERETO. RECOMMENDED: By: L.) A\, - Engineer (Authorized Signature) APPROVED: Date By: f, rr;E Owner (Authorized Signature) Date ACCEPTED: By: -- Con ctor (Authorized Signature) Date Reconstruct Taxiway C — North of Runway 12/30 CO -4 Project No — 60550592 Reconstruct Taxiway C — South of Runway 12/30 3