HomeMy WebLinkAboutAspro, Inc. - Change Order #2 - Project No. 3-19-0094-045 - 10/14/2019CHANGE ORDER NO. 2
Owner Waterloo Regional Airport, City of Waterloo, Iowa Date December 28, 2018
Project Runway 12/30 Pavement Joint Repair and Pavement Marking
Owner's Contract No. FAA AIP Project No. 3-19-0094-045 Contractor Aspro, Inc.
Date of Contract Start May 21, 2018
You are directed to make the following changes in the Contract Documents.
Description:
BASE BID
5
JOINT AND CRACK REPAIR
LF
1,202
$ 2.42
$ 2,908.84
9
HOT MIX ASPHALT
TON
(13.66)
$ 94.75
$ (1,294.28)
10
12.0 INCH PORTLAND CEMENT CONCRETE
PAVEMENT -RUNWAY 12-30
SY
(1.67)
$ 100.00
$ (167.00)
11
TEMPORARY RUNWAY AND TAXIWAY
MARKING — RUNWAY 12-30
SF
(720)
$ 1.50
$ (1,080.00)
12
GROOVING
SY
45.4
$10.00
$ 454.00
104
THRESHOLD LIGHT BAR REMOVAL
LS
1
$1,200.00
$ 1,200.00
BASE BID SUBTOTAL $ 2,021.56
ADD ALTERNATE NO. 1— RUNWAY 12/30 PAVEMENT MARKI
4
TAXIWAY REFLECTIVE MEDIA (TYPE I,
GRADATION A) TAXIWAY A (NON-AIP)
LB
(25)
$ 0.55
$ (13.75)
102
REFLECTIVE MEDIA (TYPE I, GRADATION A)
LB
(1,000)
$ 0.50
$ (500.00)
ADD ALTERNATE NO. 1 SUBTOTAL $ (513.75)
ADD ALTERNATE NO. 2 — RUNWAY 12/30 JOINT AND
1
JOINT AND CRACK REPAIR — STA 24+00 TO STA
31+00
LF
1,073
$ 2.55
$ 2,736.15
ADD ALTERNATE NO. 2 SUBTOTAL $ 2,736.15
ADD ALTERNATE NO. 3 — RUNWAY 18/36 TAXIWAYS AND APRON PAVEMENT
1
RUNWAY AND TAXIWAY MARKING
SF
6,019
$ 0.65
$ 3,912.35
2
TAXIWAY REFLECTIVE MEDIA (TYPE I,
GRADATION A)
LB
(519)
$ 0.50
$ (259.50)
103
PAVEMENT MARKING REMOVAL — TAXIWAY B
SF
808.5
$ 5.00
$ 4,042.50
ADD ALTERNATE NO. 3 SUBTOTAL $ 7,695.35
Runway 12/30 Joint Repair and
Airfield Pavement Marking
CO -2 Project No — 60550592
1
Reason for Change Order:
The purpose of this change order is to adjust quantities to reflect actual field measured quantities for the project.
The change order also reflects the removal of the abandoned threshold light bar encountered during excavation for
the pavement repairs for Runway 12/30.
BASE BID
Item 5, Joint and Crack Repair — Item adjusted to match actual field measured quantity.
Item 9, Hot Mix Asphalt - Item adjusted to match actual field measured quantity.
Item 10, 12.0 Inch Portland Cement Concrete Pavement — Runway 12-30 - Item adjusted to match actual field
measured quantity.
Item 11, Temporary Runway and Taxiway Marking — Runway 12-30 - Item adjusted to match actual field
measured quantity.
Item 12, Grooving - Item adjusted to match actual field measured quantity.
Item 104, Threshold Light Bar Removal — Item added to remove abandoned threshold light bar encountered
during pavement removal on Runway 12-30
ADD ALTERNATE NO. 1 — RUNWAY 12/30 PAVEMENT MARKING
Item 4, Taxiway Reflective Media (Type I, Gradation A) Taxiway A (NON-AIP) - Item adjusted to match actual
field measured quantity.
Item 102, Reflective Media (Type I, Gradation A) - Item adjusted to match actual field measured quantity.
ADD ALTERNATE NO. 2 — RUNWAY 12/30 JOINT AND CRACK REPAIR
Item 1, Joint and Crack Repair — Item adjusted to match actual field measured quantity.
ADD ALTERNATE NO. 3 — RUNWAY 18/36, TAXIWAYS AND APRON PAVEMENT MARKING
Item 1, Runway and Taxiway Marking - Item adjusted to match actual field measured quantity.
Item 2, Taxiway Reflective Media (Type I, Gradation A) - Item adjusted to match actual field measured quantity.
Item 103, Pavement Marking Removal — Taxiway B — Item added to remove pavement markings leading from
Runway 18-36 to the west that are not utilized.
Runway 12/30 Joint Repair and CO -2 Project No — 60550592
Airfield Pavement Marking
2
CONTRACT PRICE CONTRACT TIMES (Calendar Days)
To substantial To final
completion completion
Original: $ 575,859.35 Original: 90
Previous C.O.s (ADD): $ 64,380.00 Previous C.O.s (ADD): 0
This C.O. (ADD): $ 11,939.31 This C.O. (ADD): 0
Contract Price with all REVISED: 90
approved Change Orders: $ 652,178.66
It is agreed by the Contractor that this Change Order includes any and all costs associated with or resulting from the
change(s) ordered herein, including all impact, delays, and acceleration costs. Other than the dollar amount and time
allowance listed above, there shall be no further time or dollar compensation as a result of this Change Order.
THIS DOCUMENT SHALL BECOME AN AMENDMENT TO THE CONTRACT AND ALL
STIPULATIONS AND COVENANTS OF THE CONTRACT SHALL APPLY HERETO.
RECOMMENDED:
By: 'CY6411t °C
Engineer (Authorized Signature) Date
APPROVED:
By: L k f.
Owner (Authorized Signature) Date
ACCEPTED:
B
IL
Co �� actor (Authorized Signature) Date
Runway 12/30 Joint Repair and CO -2 Project No — 60550592
Airfield Pavement Marking
3