Loading...
HomeMy WebLinkAboutWoodruff Construction, LLC - C.O. #5 - #7 - 10/7/2019CHANGE ORDER ® Mark Kuiper, RITLAND+KUIPER ❑ Nate Goetsch, Woodruff Construction ❑ Quentin Hart, Mayor of Waterloo, Iowa 0 PROJECT: Lincoln Park OWNER: City of Waterloo, Iowa F.Y. 2019 #973 TO: Nate Geotsch Woodruff Construction 1717 Falls Avenue Waterloo, IA 5070I CO No.: 05 DATE OF ISSUANCE: 09/11/2019 FROM: RITLAND+KUIPER Landscape Architects 501 Sycamore Street, Mezzanine A Waterloo, Iowa 50703 You are directed to make the following changes in this Contract: 1. Contractor reimbursement for removal and disposal of fountain basin in Lincoln Park. TOTAL INCREASE TO CONTRACT Attachments: 2019.09.06 Estimate from Woodruff Construction $3,650.00 Not valid until signed by both the Owner and Architect. Signature of the Contractor indicates his agreement herewith, including any adjustment in the Contract sum or Contract time. The original Contract Sum was $734,330.30 $169,250.00 $903,580.30 $3,650.00 $907,230.30 zero ( 0 ) Days Net change by previously authorized Change Orders The Contract Sum prior to this Change Order was The Contract Sum will be (increased) by this Change Order The new Contract Sum including this Change Order and Change Order #01 & #02 will be The Contract Time will be (unchanged) RITLAND+KUIPER Landscape Architects Woodruff Construction City of Waterloo ARCHITECT CONTRACTOR OWNER //741 Signatur Signature Signature Mark Kuiper, ASLA, LEED AP Nate Goetsch Mayor Quentin Hart CHANGE ORDER ® Mark Kuiper, RITLAND+KUIPER ❑ Nate Goetsch, Woodruff Construction ❑ Quentin Hart, Mayor of Waterloo, Iowa 0 0 0 PROJECT: Lincoln Park OWNER: City of Waterloo, Iowa F.Y. 2019 #973 TO: Nate Geotsch Woodruff Construction 1717 Falls Avenue Waterloo, IA 50701 CO No.: 06 DATE OF ISSUANCE: 09/19/2019 FROM: RITLAND+KUIPER Landscape Architects 501 Sycamore Street, Mezzanine A Waterloo, Iowa 50703 You are directed to make the following changes in this Contract: 1. Deduction of 288 SF of porous pavement 2. Deduction of 180 SF of PCC pavement, 6" 3. Installation of 3 Thornless Honeylocust `Skyline' 2" caliper trees, B & B and planting soil as per plan note 13. 4. Installation of 360 SF of shredded hardwood mulch as per plan note 5. TOTAL DEDUCT TO CONTRACT Attachments: 2019.09.17 Estimate from Woodruff Construction ($294.27) Not valid until signed by both the Owner and Architect. Signature of the Contractor indicates his agreement herewith, including any adjustment in the Contract sum or Contract time. The original Contract Sum was ... $734,330.30 Net change by previously authorized Change Orders $169,250.00 The Contract Sum prior to this Change Order was $903,580.30 The Contract Sum will be (decreased) by this Change Order ($294.27) The new Contract Sung including this Change will be $903,286.03 The Contract Time will be (unchanged) zero ( 0 ) Days RITLAND+KUIPER Landscape Architects ARCHITECT Signatu Mark Kuiper, ASLA, LEED AP Woodruff Construction CONTRACTOR Sig rature Nate Goetsch City of Waterloo OWNER Signature Mayor Quentin Hart CHANGE ORDER ® Mark Kuiper, RITLAND+KUIPER ❑ Nate Goetsch, Woodruff Construction ❑ Quentin Hart, Mayor of Waterloo, Iowa 0 0 PROJECT: Lincoln Park OWNER: City of Waterloo, Iowa F.Y. 2019 #973 TO: Nate Geotsch Woodruff Construction 1717 Falls Avenue Waterloo, IA 50701 CO No.: 07 DATE OF ISSUANCE: 09/25/2019 FROM: RITLAND+KUIPER Landscape Architects 501 Sycamore Street, Mezzanine A Waterloo, Iowa 50703 You are directed to make the following changes in this Contract: I. In an effort to protect as many subsurface tree roots as possible, the City has asked that all concrete pavements (colored and plain) be installed with 6" of concrete (with steel reinforcement as per the construction documents) but that all modified subbase not be installed to keep excavation as minimal as possible. Some excavation has taken place beyond the 6" depth required for pavement already. In those areas, the Contractor shall use modified subbase (compacted as per the specifications) to reach the required subgrade depth for installation of the 6" pavement. All other areas shall be excavated to the 6" depth for pavement installed in-situ soils (some rolling and compaction may be necessary for these soils to provide adequate bearing for the pavements). Please provide quantities and price adjustments for the decreased soil excavation and decreased modified subbase required to accommodate this change. TOTAL (DEDUCT) TO CONTRACT ($5,719.00) Attachments: 2019.09.25 Estimate from Woodruff Construction Not valid until signed by both the Owner and Architect. Signature of the Contractor indicates his agreement herewith, including any adjustment in the Contract sum or Contract time. The original Contract Sum was $734,330.30 Net change by previously authorized Change Orders $169,250.00 The Contract Sum prior to this Change Order was $903,580.30 The Contract Sum will be (decreased) by this Change Order ($5,719.00) The new Contract Sum including this Change Order will be $897,861.30 The Contract Time will be (unchanged) zero ( 0 ) Days RITLAND+KUIPER Landscape Architects Woodruff Construction ARCHITECT Mark Kuiper, ASLA, LEED AP CONTRACTOR Signature Nate Goetsch City of Waterloo OWNER Signature Mayor Quentin Hart