HomeMy WebLinkAboutLodge Construction - CO #4 - 2018 Remedial Actions Phsae IIIB, Cont No. 949 - 10/28/2019AECOM August 9, 2019 Mr. Randy Bennett, PE Waste Management Services City of Waterloo 3505 Easton Avenue Waterloo, Iowa 50702 Subject: 2018 Remedial Actions Phase IIIB Change Order No. 4 NON -SRF City of Waterloo, Iowa City Contract No. 949 AECOM #60604454 Dear Mr. Bennett: AECOM 501 Sycamore Street Suite 222 Waterloo, Iowa 50703 www.aecom.com 319-232-6531 tel 319-232-0271 fax The following are included in the attached Change Order Tabulation: • Bid Item No. 101-111 — 200 Block of Halstead St. Sanitary Sewer Reconstruction (Add $79,216.00) These bid items were added to replace the damaged sanitary sewer serving the 200 block of Halstead Street. The existing piping was determined to be damaged to the point where it could not be repaired by Cured -In -Place -Pipe (CIPP) lining. The City requested that this work be added to the existing 2018 Remedial Actions Phase IIIB, City Contract No 949. This is a SRF project. This block of Halstead Street was not included in the Intended Use Plan (IUP) and has not been made eligible by IDNR for SRF inclusion. Therefore, the City has requested that this work be added to this project and be paid by a funding source outside of SRF. The Contractor shall submit a separate Pay Estimate that only includes this work and no SRF eligible work. AECOM recommends the City of Waterloo approve Change Order No. 4 for an addition of $79,216.00 and pay for the work with a funding source outside of SRF. P:\60604454\600_Construction_Support\03-PH IIIB \670_Change-Orders\CO NO 4\WAT CIPP PH IIIB Change Order No 4-LTR.docx AECOM The following table illustrates the overall change to the project: AECOM 501 Sycamore Street Suite 222 Waterloo, Iowa 50703 www.aecom.com ORIGINAL CONTRACT $ 520,649.23 CO NO. 1 $ (26,275.04) CO NO. 2 $ 27,244.96 CO NO. 3 $ 9,829.19 SRF - ALL CHANGE ORDERS $ 10,799.11 SRF - REVISED CONTRACT $ 531,448.34 SRF - PROJECT CONTRACT CHANGE 2.07% NON -SRF CO NO. 4 $ 79,216.00 NON -SRF REVISED CONTRACT $ 610,664.34 NON -SRF PROJECT CONTRACT CHANGE 17.29% Yours sincerely, Christopher G. Oelkers, P.E. Attachment: As Noted Enclosures: Lodge Construction 200 block of Halstead Street Estimate Change Order No. 4 Tabulation P:\60604454\600_Construction_Support\03-PH IIIB\670_Change-Orders\CO NO 4\WAT CIPP PH IIIB Change Order No 4-LTR.docx 319-232-6531 tel 319-232-0271 fax LODGE CONSTRUCTION INC. P.O. BOX 459 CLARKSVILLE, IA 50619 Contact: JOHN SENN OR STEVE LODGE Phone: 319-290-5767 OR 319-239-0480 Fax: 319-296-2144 EXCLUSIONS: 1.BOND 2. EROSION CONTROL 3.COMPACTION TESTING 4. SURVEY PLEASE CALL WITH ANY QUESTIONS Job Name: WATERLOO HALSTEAD SANITARY SEWER GRAND TOTAL NOTES: LODGE CONSTRUCTION WOULD ANTICAPATE THE WORK TAKING PLACE IN OCTOBER. $79,216.00 Page 1 of 1 ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE AMOUNT 1 TOPSOIL 4" IMPORT 361.00 SY 10.00 3,610.00 2 PAVEMENT REMOVAL STOCK AND RESPREAD 867.00 SY 9.00 7,803.00 3 SANITARY SEWER 8" 334.00 LF 89.00 29,726.00 4 SANITARY SEWER SERVICE 6" 111.00 LF 39.00 4,329.00 5 STORM SEWER RCP 24" 314.00 LF 51.00 16,014.00 6 REMOVE STORM SEWER 314.00 LF 10.00 3,140.00 7 REMOVE MANHOLE 1.00 EA 600.00 600.00 8 R.A.P. PER LOAD 10.00 EA 200.00 2,000.00 9 TRAFFIC CONTROL 1.00 LS 2,750.00 2,750.00 10 SEED HYDRO 361.00 SY 4.00 1,444.00 12 MOBILIZATION 1.00 LS 7,800.00 7,800.00 GRAND TOTAL NOTES: LODGE CONSTRUCTION WOULD ANTICAPATE THE WORK TAKING PLACE IN OCTOBER. $79,216.00 Page 1 of 1 Project Change Order No. 4 - NON -SRF FUNDING 2018 Remedial Actions Phase IIIB City of Waterloo City Contract No. 949 AECOM Project Na: 60904454 Friday. August 09, 2019 NON -SNF ORIGINAL CONTRACT DATES REVISED CONTRACT DATES REVISED CONTRACT DATES EVBED CONTRACT DATES REVISED CONTRACT OATES SUBSTANTIAL COMPLETION FINAL COMPLETTION NONE 09127119 SUBSTANTIAL COMPLETION FNAL COMPLETTION NONE 09/27119 SUBSTANTIAL COMPLETION FINAL COMPLETTION No Change No Change SUBSTANTIAL COMPLETION FINAL COMPLETTION Ne Change No Change SUBSTANTIAL COMPLETION FINAL COMPLETTION No CM1ar. No Change Pi 28 3 �Ow Mon 661 6 00 00 500 00 91 00 07 CO 60600 5100.00 2.40 17520 50600 2.00 23.400 65900. 50000 17540 600.00 /20000 21..5.110 SO JO re pp 235 0 0002 0202.312 001.00 010 c 6..N.21w 1011 DWG 06.n pme 12 wo Pm. 90 D AI 06 1.33 00 3121 360 9 200 200 8 48 2.00 00 DWG 10 6 Con OW6 6. 2 I16162 op 610 WO 0 0.06 MOO 6 Plop 28 OW 1.21 70 000 0.1610 SI OP 0. 0 00 10111 Swei SI 00 4.1 51 .00 610 0 00 30 DWG 311.0.7 62°PPlo 033 1000 0 612 0 10 .61.4644 11.0111.04 61 811102. 71-102 m 280 48003 40 1101000 50000 41361.0 ADO 100 On 01000 00 1610 .73.70 20112 00200 • AD 111 P60126 �_--Nsr►i-.�►...t..".""-..=1.2..../M.1+ei0ma� ,55, +x�eMIBN... -his- ---5--54611a--5-.55501...5-5'".. te.nlM11.h..wa9B�.... ...nye .. .....ea�Me, _eMM�a_.. .n_MII �•-Li..,, `- ,.-wwe..--`N9�IP CS 6.6 1110 3166 232120 1gncw MOP 10.0 S 520,649.23 OR NAL CONTRAC i 6111 CO NO 1 5 REVISED CONTRACT i 97416k AALL CHANGE S 6 PROJECT CONTRACT CHANGE CO 1 CO ALL CHANGE ORO 6 2a.nsae CO 20 649. 3 25. 15.04 244.96 OR CANAL COSTl5 6.20 6403 CO Q36 2/6.04 CO NO. 6 211244.101 CO 19 REVISE° COMM 621.616. ALL CHANGE ORM ROWSE) CONTR.. P EC CONTRACT CNA.° 10 199.11 631 41.6,34 AS i 113799.11 SRF REPINED CONTRACT 6021,443.34 SR P OJ CT CONTRACT C Art. 07 f a11 00 SA REVISED TRACT f st0.6 SW PROJECT CONTRACT CHANGE