HomeMy WebLinkAboutLodge Construction - CO #4 - 2018 Remedial Actions Phsae IIIB, Cont No. 949 - 10/28/2019AECOM
August 9, 2019
Mr. Randy Bennett, PE
Waste Management Services
City of Waterloo
3505 Easton Avenue
Waterloo, Iowa 50702
Subject: 2018 Remedial Actions Phase IIIB
Change Order No. 4 NON -SRF
City of Waterloo, Iowa
City Contract No. 949
AECOM #60604454
Dear Mr. Bennett:
AECOM
501 Sycamore Street
Suite 222
Waterloo, Iowa 50703
www.aecom.com
319-232-6531 tel
319-232-0271 fax
The following are included in the attached Change Order Tabulation:
• Bid Item No. 101-111 — 200 Block of Halstead St. Sanitary Sewer Reconstruction (Add $79,216.00)
These bid items were added to replace the damaged sanitary sewer serving the 200 block of Halstead
Street. The existing piping was determined to be damaged to the point where it could not be repaired by
Cured -In -Place -Pipe (CIPP) lining.
The City requested that this work be added to the existing 2018 Remedial Actions Phase IIIB, City Contract No
949. This is a SRF project. This block of Halstead Street was not included in the Intended Use Plan (IUP) and
has not been made eligible by IDNR for SRF inclusion.
Therefore, the City has requested that this work be added to this project and be paid by a funding source
outside of SRF. The Contractor shall submit a separate Pay Estimate that only includes this work and no SRF
eligible work.
AECOM recommends the City of Waterloo approve Change Order No. 4 for an addition of $79,216.00 and pay
for the work with a funding source outside of SRF.
P:\60604454\600_Construction_Support\03-PH IIIB \670_Change-Orders\CO NO 4\WAT CIPP PH IIIB Change Order No 4-LTR.docx
AECOM
The following table illustrates the overall change to the project:
AECOM
501 Sycamore Street
Suite 222
Waterloo, Iowa 50703
www.aecom.com
ORIGINAL CONTRACT
$ 520,649.23
CO NO. 1
$ (26,275.04)
CO NO. 2
$ 27,244.96
CO NO. 3
$ 9,829.19
SRF - ALL CHANGE ORDERS
$ 10,799.11
SRF - REVISED CONTRACT
$ 531,448.34
SRF - PROJECT CONTRACT CHANGE
2.07%
NON -SRF CO NO. 4
$ 79,216.00
NON -SRF REVISED CONTRACT
$ 610,664.34
NON -SRF PROJECT CONTRACT
CHANGE
17.29%
Yours sincerely,
Christopher G. Oelkers, P.E.
Attachment: As Noted
Enclosures: Lodge Construction 200 block of Halstead Street Estimate
Change Order No. 4 Tabulation
P:\60604454\600_Construction_Support\03-PH IIIB\670_Change-Orders\CO NO 4\WAT CIPP PH IIIB Change Order No 4-LTR.docx
319-232-6531 tel
319-232-0271 fax
LODGE CONSTRUCTION INC.
P.O. BOX 459
CLARKSVILLE, IA 50619
Contact: JOHN SENN OR STEVE LODGE
Phone: 319-290-5767 OR 319-239-0480
Fax: 319-296-2144
EXCLUSIONS: 1.BOND
2. EROSION CONTROL
3.COMPACTION TESTING
4. SURVEY
PLEASE CALL WITH ANY QUESTIONS
Job Name: WATERLOO HALSTEAD
SANITARY SEWER
GRAND TOTAL
NOTES:
LODGE CONSTRUCTION WOULD ANTICAPATE THE WORK TAKING PLACE IN OCTOBER.
$79,216.00
Page 1 of 1
ITEM
DESCRIPTION
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1
TOPSOIL 4" IMPORT
361.00
SY
10.00
3,610.00
2
PAVEMENT REMOVAL STOCK AND RESPREAD
867.00
SY
9.00
7,803.00
3
SANITARY SEWER 8"
334.00
LF
89.00
29,726.00
4
SANITARY SEWER SERVICE 6"
111.00
LF
39.00
4,329.00
5
STORM SEWER RCP 24"
314.00
LF
51.00
16,014.00
6
REMOVE STORM SEWER
314.00
LF
10.00
3,140.00
7
REMOVE MANHOLE
1.00
EA
600.00
600.00
8
R.A.P. PER LOAD
10.00
EA
200.00
2,000.00
9
TRAFFIC CONTROL
1.00
LS
2,750.00
2,750.00
10
SEED HYDRO
361.00
SY
4.00
1,444.00
12
MOBILIZATION
1.00
LS
7,800.00
7,800.00
GRAND TOTAL
NOTES:
LODGE CONSTRUCTION WOULD ANTICAPATE THE WORK TAKING PLACE IN OCTOBER.
$79,216.00
Page 1 of 1
Project Change Order No. 4 - NON -SRF FUNDING
2018 Remedial Actions Phase IIIB
City of Waterloo
City Contract No. 949
AECOM Project Na: 60904454
Friday. August 09, 2019
NON -SNF
ORIGINAL CONTRACT DATES
REVISED CONTRACT DATES
REVISED CONTRACT DATES
EVBED CONTRACT DATES
REVISED CONTRACT OATES
SUBSTANTIAL COMPLETION
FINAL COMPLETTION
NONE
09127119
SUBSTANTIAL COMPLETION
FNAL COMPLETTION
NONE
09/27119
SUBSTANTIAL COMPLETION
FINAL COMPLETTION
No Change
No Change
SUBSTANTIAL COMPLETION
FINAL COMPLETTION
Ne Change
No Change
SUBSTANTIAL COMPLETION
FINAL COMPLETTION
No CM1ar.
No Change
Pi
28 3
�Ow
Mon
661
6 00
00
500 00
91 00
07 CO
60600
5100.00
2.40
17520
50600
2.00
23.400
65900.
50000
17540
600.00
/20000
21..5.110
SO JO
re pp
235 0
0002
0202.312
001.00
010
c 6..N.21w 1011
DWG 06.n pme
12 wo Pm.
90 D
AI 06
1.33 00
3121
360
9 200
200
8 48
2.00 00
DWG 10 6 Con
OW6 6. 2 I16162 op 610
WO 0
0.06 MOO
6 Plop
28 OW 1.21
70
000
0.1610
SI OP
0.
0 00
10111 Swei
SI 00
4.1
51
.00
610
0 00
30 DWG 311.0.7 62°PPlo
033
1000
0 612
0 10
.61.4644
11.0111.04
61
811102.
71-102
m
280
48003
40
1101000
50000
41361.0
ADO
100 On
01000
00
1610
.73.70
20112
00200
•
AD
111 P60126
�_--Nsr►i-.�►...t..".""-..=1.2..../M.1+ei0ma�
,55, +x�eMIBN... -his- ---5--54611a--5-.55501...5-5'".. te.nlM11.h..wa9B�.... ...nye .. .....ea�Me,
_eMM�a_.. .n_MII �•-Li..,, `- ,.-wwe..--`N9�IP
CS
6.6
1110
3166
232120
1gncw
MOP
10.0
S
520,649.23
OR NAL CONTRAC
i 6111
CO NO 1 5 REVISED CONTRACT i 97416k
AALL CHANGE S 6
PROJECT CONTRACT CHANGE
CO 1
CO
ALL CHANGE ORO
6 2a.nsae
CO
20 649. 3
25. 15.04
244.96
OR CANAL COSTl5 6.20 6403
CO Q36 2/6.04
CO NO. 6 211244.101
CO
19
REVISE° COMM
621.616.
ALL CHANGE ORM
ROWSE) CONTR..
P EC CONTRACT CNA.°
10 199.11
631 41.6,34
AS i 113799.11
SRF REPINED CONTRACT 6021,443.34
SR P OJ CT CONTRACT C Art. 07
f a11 00
SA REVISED TRACT f st0.6
SW PROJECT CONTRACT CHANGE