HomeMy WebLinkAboutWRH, Inc. - Satellite Wet Well Rehab, COnt No. 907 - 10/28/19AECOM October 23, 2019 Mr. Randy Bennett Waste Management Services 3505 Easton Avenue Waterloo, Iowa 50702 Subject: Change Order No. 5 Satellite Wet Well Rehabilitation Waterloo, Iowa City Contract No. 907 AECOM #60488465 Dear Mr. Bennett: AECOM 501 Sycamore Street Suite 222 Waterloo, Iowa 50703 www.aecom.com Please return this copy to: City Clerk & Finance Dept. 715 Mulberry St. Waterloo, IA 50703 319-232-6531 tel 319-232-0271 fax Enclosed please find Change Order No. 5 for the above -referenced project. As part of the original Contract, there are a number of pipes to be coated in the Raw Wastewater Pumping Station Building. At some of the pipe joints, there appears to be excessive corrosion occurring, and the integrity of some of the bolts at the joints are in question. This Change Order would include providing a media blast at the joints and replacement of bolts that have deteriorated. It is recommended to move forward with this Change Order No. 5 in the amount of $56,439.00. If you have any questions or need additional information, please let us know. Thank you. Yours sincerely, Ross A. Hillsman, PE Enclosure: As Noted c: WRH, Inc. P:\604884651600_Construction_Support\670_Change-Orders\2019-10-23 CO #5- Trnsmtl to Randy Bennett Waterloo Satellite Wet Wet Rehab (003).docx CHANGE ORDER NO. 5 Owner: City of Waterloo Date: October 23, 2019 Project: Satellite Wet Well Rehabilitation Owner's Contract No.: 907 Contractor: WRH, Inc. Date of Contract Start: $ Original Contract: $1,839,380.00 You are directed to make the following changes in the Contract Documents. Description: Add media blast joints on piping to be coated in the Raw Wastewater Pumping Building. Replace bolts at joints as needed with B7 Heavy Hex Plain Finish (up to approximately 1,700 bolts [varying sizes]). NET ADD $56,439 00 Reason for Change Order: There are a number of pipes to be coated in the Raw Wastewater Pumping Building as part of the original Contract. There appears to be excessive corrosion occurring at some of the pipe joints, and the integrity of some of the bolts at the joints are in question. This addition would include providing a media blast at the joints and replacement of bolts (up to approximately 1,700) that have deteriorated. Labor and Materials will be tracked during this construction activity. CONTRACT PRICE Original: $ 1,839,380.00 Original: Previous C.O.s (ADD/DEDUCT): $ 93,453.00 Previous C.O.s (ADD/DEDUCT): This C.O. (ADD/DEDUCT): $ 56,439.00 This C.O. (ADD/DEDUCT): Contract Price With All Approved Change Orders: $ 1,989,272.00 REVISED: CONTRACT TIMES (Calendar Days) To Substantial To Final Completion Completion 4 Original Completion Date: October 1, 2019 Revised Completion Date: To be Determined It is agreed by the Contractor that this Change Order includes any and all costs associated with or resulting from the change(s) ordered herein, including all impact, delays, and acceleration costs. Other than the dollar amount and time allowance listed above, there shall be no further time or dollar compensation as a result of this Change Order. THIS DOCUMENT SHALL BECOME AN AMENDMENT TO THE CONTRACT AND ALL STIPULATIONS AND COVENANTS OF THE CONTRACT SHALL APPLY HERETO APPROVED: By: City of Waterloo (Authorized Signature) ACCEPTED: By: ( Date: WRH, Inc. (Authorized Signature) Date: Page 1 of 1 P:160488465\ 600_Construction_Support1670_Change-Orders \2019-10-22-00#5 - Satellite Wet Well - WRH (002).doc AECOM 60488465 5 Project No. Change Order No.