HomeMy WebLinkAboutWoodruff Construction - CO#'s 8-9 - Lincoln Park Proj. - 11/4/2019CHANGE ORDER El Mark Kuiper, RITLAND±KUIPER ❑ Nate Onetsch, Woodruff Construction ❑ Quentin Hart, Mayor of Waterloo, Iowa PROJECT: Lincoln Park CO No.: 08 OWNER: City of Waterloo, Iowa DATE OF ISSUANCE: 10/28/19 F.Y. 2019 #973 TO: Nate Geotsch FROM: Woodruff Construction RITLAND+KUIPER Landscape Architects 1717 Falls Avenue 501 Sycamore Street, Mezzanine A Waterloo, IA 50701 Waterloo, Iowa 50703 You are directed to make the following changes in this Contract: 1. Electrical contractor shall provide a complete breakdown of deducted materials required for the following: A. Panels EB1, EB2, EB4, and EB5 shall have SCCR ratings of 10kA. B. Panel EB4 shall have an SCCR rating of 32kA or higher. TOTAL (DEDUCT) TO CONTRACT (S895.00) Attachments: 2019.10.25 Estimate from Woodruff Construction Not valid until signed by both the Owner and Architect. Signature of the Contractor indicates his agreement herewith, including any adjustment in the Contract sutra or Contract time. The original Contract Sutra was $734,330.30 Net change by previously authorized Change Orders $166,886.73 The Contract Sum prior to this Change Order was $901,217.03 The Contract Sum will be (decreased) by this Change Order ($895.00) The new Contract Surat including this Change Order will be $900,322.03 The Contract Time will be (unchanged) zero ( 0 ) Days RITLAND+KUIPER Landscape Architects ARCHITECT Mark Kuiper, ASLA, LEED AP Woodruff Construction City of Waterloo CONTRACTOR OWNER 7� Signature Signature Nate Goetsch Mayor Quentin Hart V Nil a\ CHANGE ORDER El Mark Kuiper, RITLAND+KUIPER ❑ Nate Goetsch, Woodruff Construction ❑ Quentin Hart, Mayor of Waterloo, Iowa PROJECT: Lincoln Park OWNER: City of Waterloo, Iowa F.Y. 20I9 #973 TO: Nate Geotsch Woodruff Construction 1717 Falls Avenue Waterloo, IA 50701 CO No.: 09 DATE OF ISSUANCE: 10/28/19 FROM: RITLAND+ICUIPER Landscape Architects 501 Sycamore Street, Mezzanine A Waterloo, Iowa 50703 You are directed to make the following changes in this Contract: Install 6" flush mount lettering to match "Lincoln Park" on the back of the Parlc Avenue/Franklin Street monument. The "Lincoln Park" lettering will be on both sides of the Park Avenue/Franklin Street monument signage. TOTAL INCREASE TO CONTRACT Attachments: 2019.10.25 Estimate from Woodruff Construction $1,190.00 Not valid until signed by both the Owner and Architect. Signature of the Contractor indicates his agreement herewith, including any adjustment in the Contract sum or Contract time. The original Contract Sum was ., $734,330.30 Net change by previously authorized Change Orders $166,886.73 The Contract Sum prior to this Change Order was $901,217.03 The Contract Sum will be (increased) by this Change Order $1,190.00 The new Contract Sum including this Change Order will be $901,512.03 The Contract Time will be (unchanged) zero ( 0 ) Days RITLAND+KUIPER Landscape Architects ARCHITECT Mark Kuiper, ASLA, LEED AP Woodruff Construction CONTRACTOR rtItk Signature Nate Goetsch City of Waterloo OWNER D-L,f2A. 63e,, Signature Mayor Quentin Hart " /Li / 11