HomeMy WebLinkAboutWoodruff Construction - CO#'s 8-9 - Lincoln Park Proj. - 11/4/2019CHANGE ORDER
El Mark Kuiper, RITLAND±KUIPER
❑ Nate Onetsch, Woodruff Construction
❑ Quentin Hart, Mayor of Waterloo, Iowa
PROJECT: Lincoln Park
CO No.: 08
OWNER: City of Waterloo, Iowa DATE OF ISSUANCE: 10/28/19
F.Y. 2019 #973
TO: Nate Geotsch FROM:
Woodruff Construction RITLAND+KUIPER Landscape Architects
1717 Falls Avenue 501 Sycamore Street, Mezzanine A
Waterloo, IA 50701 Waterloo, Iowa 50703
You are directed to make the following changes in this Contract:
1. Electrical contractor shall provide a complete breakdown of deducted materials required for the following:
A. Panels EB1, EB2, EB4, and EB5 shall have SCCR ratings of 10kA.
B. Panel EB4 shall have an SCCR rating of 32kA or higher.
TOTAL (DEDUCT) TO CONTRACT (S895.00)
Attachments: 2019.10.25 Estimate from Woodruff Construction
Not valid until signed by both the Owner and Architect.
Signature of the Contractor indicates his agreement herewith, including any adjustment in the Contract sutra or Contract time.
The original Contract Sutra was $734,330.30
Net change by previously authorized Change Orders $166,886.73
The Contract Sum prior to this Change Order was $901,217.03
The Contract Sum will be (decreased) by this Change Order ($895.00)
The new Contract Surat including this Change Order will be $900,322.03
The Contract Time will be (unchanged) zero ( 0 ) Days
RITLAND+KUIPER
Landscape Architects
ARCHITECT
Mark Kuiper, ASLA, LEED AP
Woodruff Construction City of Waterloo
CONTRACTOR OWNER
7�
Signature Signature
Nate Goetsch Mayor Quentin Hart V Nil a\
CHANGE ORDER
El Mark Kuiper, RITLAND+KUIPER
❑ Nate Goetsch, Woodruff Construction
❑ Quentin Hart, Mayor of Waterloo, Iowa
PROJECT: Lincoln Park
OWNER: City of Waterloo, Iowa
F.Y. 20I9 #973
TO: Nate Geotsch
Woodruff Construction
1717 Falls Avenue
Waterloo, IA 50701
CO No.: 09
DATE OF ISSUANCE: 10/28/19
FROM:
RITLAND+ICUIPER Landscape Architects
501 Sycamore Street, Mezzanine A
Waterloo, Iowa 50703
You are directed to make the following changes in this Contract:
Install 6" flush mount lettering to match "Lincoln Park" on the back of the Parlc Avenue/Franklin Street
monument. The "Lincoln Park" lettering will be on both sides of the Park Avenue/Franklin Street
monument signage.
TOTAL INCREASE TO CONTRACT
Attachments: 2019.10.25 Estimate from Woodruff Construction
$1,190.00
Not valid until signed by both the Owner and Architect.
Signature of the Contractor indicates his agreement herewith, including any adjustment in the Contract sum or Contract time.
The original Contract Sum was ., $734,330.30
Net change by previously authorized Change Orders $166,886.73
The Contract Sum prior to this Change Order was $901,217.03
The Contract Sum will be (increased) by this Change Order $1,190.00
The new Contract Sum including this Change Order will be $901,512.03
The Contract Time will be (unchanged) zero ( 0 ) Days
RITLAND+KUIPER
Landscape Architects
ARCHITECT
Mark Kuiper, ASLA, LEED AP
Woodruff Construction
CONTRACTOR
rtItk
Signature
Nate Goetsch
City of Waterloo
OWNER
D-L,f2A. 63e,,
Signature
Mayor Quentin Hart " /Li /
11