HomeMy WebLinkAbout2019-931-12/02/2019 Prepared by LeAnn M. Even, Deputy City Clerk, City of Waterloo, 715 Mulberry Street, Waterloo,
IA 50703, 319-291-4323.
RESOLUTION NO. 2019-931
RESOLUTION APPROVING AWARD OF BID TO BOULDER
CONTRACTING, LLC, OF GRUNDY CENTER, IOWA, IN THE
AMOUNT OF $136,315.75, AND APPROVING THE
CONTRACT, BONDS AND CERTIFICATE OF INSURANCE,
IN CONJUNCTION WITH THE FY 2020 RIP RAP REPAIRS
ALONG LEVEE SYSTEM, CONTRACT NO. 999, AND
AUTHORIZING THE MAYOR AND CITY CLERK TO
EXECUTE SAID DOCUMENTS.
WHEREAS, Boulder Contracting, LLC, of Grundy Center, Iowa, submitted a bid in the
amount of$136,315.75, in conjunction with the FY 2020 Rip Rap Repairs Along Levee System,
Contract No. 999, and is the apparent low bidder, and
WHEREAS, Boulder Contracting, LLC submitted a written contract, bond and certificate
of insurance, per the specifications heretofore adopted by this Council for said project with
Resolution No. 2019-901, after public hearing on November 25, 2019, in conjunction with the
FY 2020 Rip Rap Repairs Along Levee System, Contract No. 999.
NOW, THEREFORE, BE IT RESOLVED BY THE COUNCIL OF THE CITY OF
WATERLOO, IOWA
1. That the bid of Boulder Contracting, LLC, in the amount of$136,315.75, in conjunction
with the FY 2020 Rip Rap Repairs Along Levee System, Contract No. 999, is hereby
awarded.
2. That the contract, bond and certificate of insurance submitted by Boulder Contracting,
LLC, in conjunction with the FY 2020 Rip Rap Repairs Along Levee System, Contract
No. 999, are hereby approved.
3. That the Mayor and City Clerk are authorized and directed to execute said documents on
behalf of the City of Waterloo, Iowa.
PASSED AND ADOPTED this 2nd day of December 2019.
— 4 —
Quentin Hart, Mayor
ATTEST:
qAHitk,-
LeA . Even, C, IaCMC
Deputy City Clerk