HomeMy WebLinkAboutAECOM CO#7 2018 Remedial Actions Phase IIIB - 12/9/2019AECOM December 2, 2019 Mr. Randy Bennett, PE Waste Management Services City of Waterloo 3505 Easton Avenue Waterloo, Iowa 50702 Subject: 2018 Remedial Actions Phase IIIB Change Order No. 7 NON-SRF City of Waterloo, Iowa City Contract No. 949 AECOM #60604454 Dear Mr. Bennett: AECOM 501 Sycamore Street Suite 222 Waterloo. Iowa 50703 www aecom com 319-232-6531 tel 319-232-0271 fax The following are included in the attached Change Order Tabulation: • Bid Item No. 112-121 — 200 Block of Halstead St. Sanitary Sewer Reconstruction (Add $24,964.00) It was determined that additional work was needed by the City for the 200 block of Halstead Street. The City requested that this work be added to the existing 2018 Remedial Actions Phase IIIB, City Contract No 949. This is a SRF project. This block of Halstead Street was not included in the Intended Use Plan (IUP) and has not been made eligible by IDNR for SRF inclusion. Therefore, the City has requested that this work be added to this project and be paid by a funding source outside of SRF. The Contractor shall submit a separate Pay Estimate that only includes this work and no SRF eligible work. AECOM recommends the City of Waterloo approve Change Order No. 7 for an addition of $24,964.00 and pay for the work with a funding source outside of SRF. P \604304454160C_Construct on Suppo 3-PH I I19\b70_Crarge orders\CO NO TWAT CIPP PH IIIB Change Order No 7-LTR.docx AECOM The following table illustrates the overall change to the project: Yours sincerely, Christopher G. Oelkers, P.E. AECOM 501 Sycamore Street Suite 222 Waterloo, Iowa 50703 www.aecom com ORIGINAL CONTRACT $ 520,649.23 CO NO. 1 $ (26,275.04) CO NO. 2 $ 27,244.96 CO NO. 3 $ 9,829.19 CO NO. 5 $ 31,757.10 CO NO, 6 $ (54,673.39) SRF - ALL CHANGE ORDERS $ (12,117.18) SRF - REVISED CONTRACT $ 508,532.05 SRF PROJECT CONTRACT CHANGE -2.33% NON-SRF CO NO. 4 $ 79,216.00 NON-SRF CO NO. 7 $ 24,964.00 NON-SRF - ALL CHANGE ORDERS $ 104,180.00 CITY - REVISED CONTRACT $ 612,712 05 PROJECT CONTRACT CHANGE 17.68% Attachment Change Order No. 7 Tabulation P.160604454t600__Consruction_Supporm103-PH 8r670 Change.Oaers\CO NO 7\WAT CIPP PH 11.B Change Order No 7-LTR docx 319-232-6531 tel 319-232-0271 fax